Loading...
HomeMy WebLinkAboutALPINE BUSINESS PARK - PDR - 2-07 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW (5)Page 1 of 1 Anne Aspen - Re: PDR tomorrow From: Mike Gebo To: Anne Aspen Date: 09/12/2006 11:15 AM Subject: Re: PDR tomorrow Anne, #3. If I understand the project, this is an addition to an existing car wash, therefore I can issue a Letter of Completion (which is the final approval to occupy) for the addition without removing the old building, then I can issue a.demo permit for the old part with permits for the phase 2. Mike >>> Anne Aspen Tuesday, September 12, 2006 >>> Hi all, Just wanted to give everyone a heads -up about tomorrow's Preliminary Design Review. They asked some specific questions that we need to be prepared to answer. I've attached them in case you or your designee did not get them. Here's who I expect to answer which questions: (Mike Gebo and Paul Eckman --I don't expect you to attend the meeting, but if possible, could you please look over the plan and question #3 and get me your thoughts via email?? Thanks) #1-Zoning ' #2-Me, Clark, Txp. PIg #3-Mike Gebo, Engineering, Txp. Plg., Paul Eckman #4-Me, Clark #5-Engineering, Txp. PIg. #6-Engineering, Txp. Plg. #7-Engineering, Txp. Plg #8-Clark #9-Stormwater #10-Stormwater Thanks and see you tomorrow! Anne file://C:\Documents and Settings\aaspen\Local Settings\Temp\GW)0000l.HTM 09/13/2006