Loading...
HomeMy WebLinkAboutRIVERSIDE COMMERCIAL - PDP/FDP - 9-07/A - CORRESPONDENCE - (8)Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 36 Created: 6/7/2007 [8/28/08] Reminder Comment: The letter submitted needs to be signed by the off -site property owner where the storm sewer is proposed. [10/18/07] Reminder: Need intent before hearing; final dedication before signing of mylars. [6/7/07] An off -site drainage easement is required for the outfall storm sewer. This easement should be 20 feet wide with the pipe centered in the easement. Number: 68 Created: 8/28/2008 [8/28/08] The 100-HWL of the detention pond is labeled as 4936.15 and 4936.20 in various locations. Please clarify and make consistent. Number: 69 Created: 8/28/2008 [8/28/08] After hearing, Stormwater is ready for mylars. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 59 Created: 8/19/2008 [8/19108] Has the utility easement which covers the water main, fire hydrant and curb stops been submitted? Department: Zoning Topic: ZONING Issue Contact: Jenny Nuckols Number: 6 Created: 5/11 /2007 [8/20/08] Site Plan: For Building G, please note the building dimensions, footprint and setback to the south property line. For Building B, please note the setback to the south property line. For the next round, please remove the bubble graphic around the revisions. Comment from Current Planning: No further comments. As soon as all the necessary easements are submitted, we can schedule the public hearing. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: T Ted Shepard Chief Planner Page 2 4 STAFF PROJECT REVIEW City of Fort Collins WG Architects Date: 9/4/2008 Robert Gustafson 1449 Riverside Fort Collins, CO 80524 Staff has reviewed your submittal for RIVERSIDE COMMERCIAL PDP TYPE I AND FINAL COMPLIANCE, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number: 60 Created: 8/27/2008 [8/27/08] Please use Riverside Storage or Riverside Commercial as the main title on all of the plans consistently (Utility, Site, Landscape etc...). You may use address or legal description as the subtitle if you like. Number: 61 Created: 8/27/2008 [8/27/08] There are several ROW and easement dedications labeled on the Utility Plan (ROW, U.E., Drainage etc...) I did not receive any of these documents for review with this submittal package. Please submit deeds, legal descriptions and exhibits for each of these documents with a review fee of $250 per document. The documents will need to be reviewed and basically ready to record with all fees paid prior to plan approval. Number: 62 Created: 8/27/2008 [8/27/08] Please fix all line over text conflicts throughout the plan set. See redlines for clarification. Number: 63 Created: 8/27/2008 [8/27/08] Please use the 2007 version of the LCUASS Drawing 1606 detail showing truncated domes in the ramps. Number: 64 Created: 8/27/2008 [8/27/08] The standard revision blocks should all be cleared on final mylars. It appears they are being used to track changes during the review process now. No clouding or revision triangles should be shown on any of the final mylars. See redlines for clarification. Number: 65 Created: 8/27/2008 [8/27/08] The page numbering system does not make sense on the Site and Landscape Plans. Please revise the page numbering system so that each plan set starts with sheet 1 of x and follows in sequence. See redlines for clarification. Number: 66 Created: 8/27/2008 [8/27/08] The aerial photo vicinity map on the Site Plan cover sheet will not scan or copy well. A one line street map with street names and project site location is preferred. Page 1