HomeMy WebLinkAbout617 WOOD ST. (MORIE AT CAPITOL HILL) - FDP - 22-06/A - CORRESPONDENCE - (3)McKee Brothers, LLC
Response to Issues from Final Review Meeting
[2/8/07] — OK. See Utilities plans
[11/1/06] — Same as above.
Project: Mori6 at Capitol Hill
March 2, 2007
Page 4 of 4
McKee Brothers, LLC
Response to Issues from Final Review Meeting
Number: 92
[2/8/07] — OK. See Utilities plans
Project: Morid at Capitol Hill
March 2, 2007
Department: PFA
Topic: Fire
Number: 59
[2/16/07] — Buildings must be within 300' of a fire hydrant. The closet hydrant is located
southwest of the site on Elm street. In a direct line, it is 228ft (+/-) to the center of the west side
of the lot. Measuring from the along the sidewalk and up the back alley to the property at right
angles, the distance is approximately 260ft (+/-) to the southwest comer of the lot or 310ft
to the center of the west side of the lot.
110/12/06] — Same issue. See above.
Number. 99
[2/14/07] — The outdoor fireplaces are being offered as an option. These are designed to be
outdoor fixed, gas-buming units that are self contained. Permits will be obtained as needed.
Department: Transportation Planning
Topic: General
Number: 97
[2/13/07] — OK
Department: Stormwater-Water-Wastewater
Topic: Landscape plans
Number. 93
[2/8/07] — To keep landscape plan legible per Planning Dept, the water services are not shown
on it However, an overlay was created to verify location of water services and proximity to
trees. The street trees were located on top of the water meters. To correct this, the water meters
have been moved further north to the center of the island along the street. The tree locations
have been adjusted to obtain 6 ft of clearance. In one or two cases, this was not possible, but
every effort was made to maintain maximum distance while preserving the trees. Water services
can be viewed if requested.
Department: Stormwater-Water-Wastewater
Topic: Stormwater
Number. 98
[2/14/07] — OK. See Utilities plans
Number: 100
[2/15/07] — OK. See Utilities plans
Department: Stormwater-Water-Wastewater
Topic: Water/Wastewater
Number. 77
[2/8/07] — OK. See Utilities plans.
[11/1/06] — Same as above.
Number: 78
Page 3 of 4
McKee Brothers, LLC Project: Mori6 at Capitol Hill
Response to Issues from Final Review Meeting March 2, 2007
[10/19/06] — Same issue. The gates will be unlocked.
Number: 94
[2/9/07] — The comments are primarily about the Estimated Square Footage number, which is
currently 8,967.2. This number was originally 7015.6 (10/06), but had to be increased to 8535.2
to account for the garage spaces which must be included. 8535.2 was the number we used to
submit to P&Z, but each unit only had a one covered garage and one carport. P&Z approved the
variance to exceed the 50% requirement and allowed us to provide two covered garage space.
Adding the addition garage space increased the total estimated square footage number to
8,967.2.
There was also a comment about the number of bedrooms. The total number of bedrooms
offered in the plan is currently 2 with the option to add an additional bedroom in the basement
for a maximum of 3 bedrooms. The basement will not be finished in these units, but can be
added as an option. The basement plan provides for a room that could be used as a bedroom or
a study, a family/entertainment space, and in some cases a theatre room. The room could
potentially be a bedroom in the basement has a window that meets egress requirements.
Topic: Utility Plans
Number 42
2/13/07] — A Blanket Easement is being provided for the entire site, which addresses the needs
of Engineering and other parties: The 8' easement note is incorrect and has been removed from
the plans.
[9/1/06] - A Blanket Easement is being provided for the entire site.
Department: Engineering
Topic: Engineering
Number 26
[2/8/07] — Noted
[10/25/06] — Noted
[8/25/06] — Noted
Number. 86
[2/8/07] — The blanket easement will be updated with correction and re -submitted.
Number: 87
[2/8/07]—FAe has been circledan labeled
Number: 88
[2/8/07] — OK. See Utilities plans
Number: 89
[2/8/07] — OK. See Utilities plans
Number: 90
[2/8/07] — OK. See Utilities plans
Number: 91
[2/8/07] — OK. See Utilities plans
Page 2 of 4
McKee Brothers, LLC
Response to Issues from Final Review Meeting
ISSUES:
Department: Current Planning
Topic: Building Elevations
Number. 50
[2/13/07] — OK
[2/9/07] — Updated. See mylars.
Number. 95
[219/071— Updated. See mylars.
Project: Morids at Capitol Hill
March 2, 2007
Topic: General
Number: 85
[2/13/07] — OK
[11/6/06] — Each dwelling will be metered individually. Multiple -coordination meetings were held
which resulted in the current plan.
Topic: Landscape plans
Number: 46
[2/13/07] — Redlines have been addressed and resubmitted 2/28. Plant note has been added.
Number: 66
[2/13/07] — The note concerning installation have been added.
[10/19/06] — Same as above.
Number: 96
[2/9/07] — Redlines have been addressed and resubmitted 2/28. Plant note has been added.
Topic: Light & Power
Number: 101
[2/13/07] — Remote reads may be needed on the electric meters per Janet McTague.
Topic: Site Plan
Number 45
[2/13/07] — OK. See site plans
[9/1 /06] — OK. See site plans
Number: 62
[2/13/07] — A dimension for the 9' setback from front of the porch to the garage has been added.
[10/19/06) — Same as above.
Number: 64
[2/13/07] — Gates are being provided along the very north and south sides of the property to
allow for fire access. All gates will be unlocked. Units B & C can access the gate from alley, but
their primary entrance in from the back of the house.
[10/19/06] — Only a single gate with access from the alley will be provided. This is primarily for
fire access.
Number: 65
[2/13/07] — The gates will be unlocked.
Page 1 of 4