HomeMy WebLinkAboutRIGDEN FARM, 15TH FILING - FDP - 11-09/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETFinal Plan Routing Sheet 11—u° /A Fort Collins
Item: �Xq&A8 n(1 n \ ^
This project wen / has been scheduled for Public Hearing on:
The following table lists final plan submittal requirements for this project.
A final fee of $1,000.00 is required at the Urn f submittal unless otherwise waived or r duced.
Fee Waiver/Reduction Approval: '� Amount: O d . O
Date:
Engineer:
Project
■■■■
Advance Planning
Building Inspection
�Engineering Pavement ---
■��■■■■■■■1■�■■■
■■■■
Environmental
Light: PowerIl■1■■■■■■■�■1■■■■■■■■■
Neighborhood
■1■■■■■■■■1■■■■■
■■■■
-
■!■■■�■�■�!1■■■■■
■■■■
Poudre Fire Authority■■1■■V►■■■■■L%1■■■■■
■■■■
• -
■■%■■lei■■1■■►'i■■■■■■■
■■■
■■■■�L■1■■11■�■■■■■
NM
M
Water & Wastewater I
Water District••
0■■MP11111MM■■■M■
MEMO
MEMO "I
■■!■■■L■■■■■■■■■
■■■■
• •
■L■■■■■�■■IL■■■■■�
■1■■■■■I■■1■■■■■
■■■■
nu er��r>JM-.S a-fFLAaV& hUS ►VD+be rccciV&[as 6+ 10j2-7 z .