HomeMy WebLinkAbout215 N. COLLEGE AVENUE - FDP - 4-07/A - CORRESPONDENCE -No resubmittal is needed. Please make corrections as needed and show appropriate staff
member before printing on mylar. Submit mylars to Susan Joy.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6206.
Sincerely,
A
Anne H. Asp n
City Planner
Page 3
Topic: Utility Plans
Number: 42 � Created: 7/11/2008
[7/11/08] The street cut can not have an irregular shape - see redlines.
Number: 43 Created: 7/11 /2008
[7/11/08] CDOT may have overlayed the original gutter and paved to the flowline. If this is
the case, than the old curb and gutter must be removed in full and then patched back to
standard. Please place a little note to that effect so that the contractor knows he can't
"layer" the curb and gutter. Thanks Tricia!
Number: 47 Created: 7/11 /2008
[7/11/08] Re: Comment 45... if sidewalk chases are necessary, please show on the plans
and add the appropriate detail.
Department: Light & Power Issue Contact: Janet McTague
Topic: Utilities
Number: 34 Created: 6/27/2008
[6/27/08] Please coordinate electric needs with Light and Power. If your need exceeds
existing capacity, we'll need a C-1 form showing building voltage and main size. We may
need to find a transformer location or change an existing transformer to a larger size.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 39 Created: 7/11 /2008
[7/11/08] There is 113 cfs flowing north on the west side of College Avenue during a 100-
year event. The depth of flow was estimated in the Old Town Drainage Master Plan to be
around .8 feet, which is about 10 inches. Since the finished floor of the proposed building is
only 10 inches above the flowline in College Avenue, the City recommends the finished floor
be raised as much as possible with still meeting ADA requirements.
Number: 40 Created: 7/11 /2008
[7/11/08] Please change the note on the site plan to state that all roof drains will be directed
to the Alley.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaferlWastewater
Number: 23 Created: 2/27/2007
[7/8/08] Has "mixed -use" been changed to remove the residential dwelling units?
[2/27/07] Typically four residential units need a 1" water service. On residential, the size of
water service does NOT affect development fees.
Number: 36 Created: 7/8/2008
[7/8/08] Will fire line be DIP or PVC? If PVC, add tracer wire details.
Number: 37 Created: 7/8/2008
[7/8/08] Revise fire line connection to use tapping saddle rather than a tee.
Number: 38 Created: 7/8/2008
[7/8/08] Sht 3 of utility plan shows 1.5" water meter, and Note 3 on the same sheet refers to
1" water service. Please clarify.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Daniel R. Bernth Date: 7/11/2008
Doberstein Lemburg Commercial, Inc,
338 C East Pitkin Street
Fort Collins, CO 80524
Staff has reviewed your submittal for 215 N. COLLEGE AVENUE PDP - TYPE I AND FINAL
PLANS, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Dana Leavitt
Topic: General
Number: 35 Created: 7/7/2008
[7/7/08] Whilst late into the project, the City is promoting the use of green building practices
in all new construction. Of specific interest are the following services that you may consider:
1. The solid waste program actively promotes reducing the amount of material goling into
the landfill. The demolition of the existing building will generate a large volume of waste.
Deconstruction of the building should be explored as a means of reducing the amount of
waste that will end up in the landfill.
2.The Utilities Department has an Integrated Design Assistance Program (IDAP) that offers
financial incentives to work on energy conservation amongst other aspects of green
building.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 8 Created: 2/26/2007
[7/11/08] [2/26/07] The TDRF fees were incorrectly calculated per my direction - I'm really
sorry about that! The good news is that you've got a credit for $1362.15. We can either
refund that to you by check or you can use it as a credit towards Final Compliance fees and
we can refund any unused portion after that. I've attached a copy of how the fees were
calculated so that you can see how a credit was given for the existing square footage.
Number: 41 Created: 7/11/2008
[7/11/08] The doors to the trash enclosure can not open into the public row. Suggest either
recessing the doors or using a slider type product.
Number: 44
[7/11/08] Great submittal!
Created: 7/11/2008
Topic: Site/Landscape Plans
Number: 45 Created: 7/11/2008
[7/11/08] Note 7 - Please specify where the drainage is to occur so that we know if sidewalk
chases are necessary.
Number: 46 Created: 7/11/2008
[7/11/08] Please correct all line over text to meet the scanning requirements.
Page 1