Loading...
HomeMy WebLinkAbout215 N. COLLEGE AVENUE - PDP - 4-07 - REPORTS - RECOMMENDATION/REPORT215 N. College Project Development Plan — Type I (# 4-07) May 16, 2007 Administrative Hearing Page 7 STAFF RECOMMENDATION: Staff recommends approval of the 215 North College Avenue Project Development Plan — Type I (# 4-07) Attachments: Zoning exhibit Statement of Planning Objectives Traffic Impact Study/ Full sized planset 215 N. College Project Development Plan — Type I (# 4-07) May 16, 2007 Administrative Hearing Page 6 the project. Clear glass is used in all commercial storefront windows and residential fenestration. 4) Outdoor Storage Areas/Mechanical Equipment [Section 3.5.1 (1)]—All trash and recycling areas are in the rear of the project on the alley and are screened from view according to Section 3.2.5 of the Land Use Code. Fixtures such as those required for utilities have been incorporated into the design. All HVAC equipment will be reviewed for compliance in the Final Plan Review process. Loading and delivery will be provided from the rear alley. 5) Mixed -use, Institutional and Commercial Building Standards [Section 3.5.3]—This mixed -use building fronts on a wide pedestrian walkway along the street. The building is extended to the build -to line to match adjacent facades. Changes in mass break up the volume and are integrally related to entries, building structure and the organization of space within and without. The proposed project contributes well to the uniqueness of the Downtown Civic Center zone district and sets a high bar for future residential and mixed -use projects in the area. The design's emphasis on high quality materials and design, pedestrian spaces, outdoor experience and a more urban streetscape are tailored to this site, both in terms of the immediate context and the wider context within the zone district. All facades exceed the minimum wall articulations. Walls have clearly defined bays, multiple changes in plane, and changes in materials and texture. All sides of the building have high quality materials consistent with the front fagade. The primary building entrance is recessed into the building mass and is covered with a glass transom window evocative of Opera Galleria's transom windows. The building has appropriate base and top treatment including a precast cornice and a tile base. 4. Findings of Fact I Conclusion: a. Mixed -use dwellings are permitted in the Downtown District, Civic Center Subdistrict, subject to an Administrative Hearing. b. This PDP complies with the General Development Standards as well as the applicable District Standards. 215 N. College Project Development Plan — Type I (# 4-07) May 16, 2007 Administrative Hearing Page 5 traffic. This detail will be addressed along with the sidewalk width mentioned above in Final Plan review. [Section 3.2.2 (C)(4)] d. There are tandem parking spaces proposed in the parking garage. This parcel is within the Transit -Oriented Development (TOD) Overlay Zone which has no minimum parking requirements for the uses contained in this project. [Section 3.2.2 (D)] e. No handicap accessible parking spaces are provided. According to Downtown Parking Manager Randy Hensley, sufficient handicap accessible parking exists on this block face so no additional spaces were required of this project. [Section 3.2.2 (K)(5)(d)] f. The on -street parking dimensions indicated on the plans meet the minimum dimensions required and are consistent with adjacent spaces along College. The garage parking spaces meet minimum requirements for long-term parking stalls with vehicular overhang over a six-foot (four -foot clear) access walkway. [Section 3.2.2 (L)(3)] 3) Site Lighting [Section 3.2.4]—Proposed site lighting meets lighting standards. Light sources are concealed and feature full shielding and sharp cutoff, thus minimizing glare. There is existing street and alley lighting and only a few light fixtures will be added to the site, so no photometric plan was required or submitted. 4) Trash and Recycling Enclosures [Section 3.2.5]—Trash enclosures have been sized appropriately to accommodate trash and recyclables and feature architecturally compatible screening doors. C. Building Standards — [Division 3.5] 1) Architectural Character, Building Size, Mass and Scale [Section 3.5 (B) and (C)]—The design of the project is complementary with the neighborhood and historic context. The project sets an enhanced standard for future redevelopment with its generous use of brick, stone, commercial display windows and detailing that echo the neighboring mixed -use project. 2) Privacy Considerations [Section 3.5.1 (D)]—The project is urban in nature, however zones of semi -private and public have been established effectively both at the street front, with the outdoor seating enclosure and on the south and east fagades, with semi -private balconies. 3) Building Materials [Section 3.5.1 (E)]—Both the materials and colors proposed blend well with existing materials and colors and set an enhanced standard for future redevelopment. Brick and steel are used extensively in 215 N. College Project Development Plan — Type I (# 4-07) May 16, 2007 Administrative Hearing Page 4 d. Nonresidential Buildings [Section 4.16 (D)(5)(d)]—The project meets the standards of Section 3.5.3 as detailed in item C5 of the next section of this staff report. 4) Site Design Standards a. Site Design: Parking Lots [Section 4.16 (E)(1)(a)]—The proposed parking for the residences is in the rear. The proposed commercial parking is on -street on College Avenue. b. Outdoor Cafes: [Section 4.16 (E)(1)(b)]—The outdoor seating area has been designed to allow 7 feet of through sidewalk and convenient access to the entrances. The restaurant will provide adequate trash receptacles in the outdoor seating enclosure. The enclosure is a metal railing which is consistent with the architectural style and railings used elsewhere in the project. There is one pinch point in the sidewalk between an existing tree and the enclosure which will need to be addressed in Final Plan review. 3. Compliance with applicable General Development Standards A. Site Planning and Design Standards [Division 3.2] 1) Landscaping and Tree Protection: [Section 3.2.1]—The site has existing street trees on its frontage. Urban land sca pe/ha rdscape is proposed including a trellis with vines on the north facade. The off-street parking is tucked under the building so landscaping is not applicable. 2) Access, Circulation and Parking [Section 3.2.2] a. Development Standards: [Section 3.2.2 (C)]—Safety Considerations: Pedestrians, bicycles and vehicles are separated in this project. Parking is on -street or in the rear off the alley, separate from the pedestrian circulation system, which fronts the site along College Ave. b. The site is level. Sufficient handicap parking exists adjacent to the site. Therefore no curbcuts or ramps are needed or proposed with this project. (Section 3.2.2 (C)(2)] c. There is one existing bike rack available on the sidewalk just south of the proposed project. Staff has recommended that an additional rack be provided on this site to accommodate the additional restaurant 215 N. College Project Development Plan — Type I (# 4-07) May 16, 2007 Administrative Hearing Page 3 215 N. College project will be a quality addition to the downtown area —it will provide additional residential, office and retail space to this part of downtown and will help to extend the downtown character north from the Old City Center area. The residential units provided in close proximity to Old Town will help to bring a 24-hour presence to downtown and additional disposable income to support the City's unique downtown business district. Materials proposed resonate and blend with the existing structures in the area. [Section 4.16 (A)] B. Permitted Land Use: Mixed -use dwellings are permitted in the D District, Civic Center Subdistrict subject to a Type I — Administrative Hearing. [Section 4.16 (B)] C. Building Standards: 1) Setback from Streets [Section 4.16 (D)(1 ]—The subject parcel is east of Mason Street. Setbacks are consistent with adjoining building fronts to either side. Landscaping has been designed as an integral part of the development of this urban project: street trees exist along the block face and creative trellis planters are proposed on the north facade. 2) Building Heights [Section 4.16 (D)(2)]—Maximum height proposed is 54 feet in 3 stories, well under the maximum allowed of 85 feet in 5 to 6 stories. 3) Building Character and Facades: a. Blank Walls: [Section 4.16 (D)(5)(a)]—There are no blank walls facing any public street, plaza or walkway in this proposal. Each facade is generously articulated with human scale and pedestrian - friendly features such as changes in plane and materials, large storefront display windows, landscaping, awnings, clerestory windows, etc. b. Outdoor Activity: [Section 4.16 (D)(5)(b)]—There is an outdoor seating area provided on the street level for restaurant -goers; balconies are provided on the south and east fagades for residents' and workers' use. c. Windows: [Section 4.16 (D)(5)(c)]—The windows proposed are quality storefront systems and are appropriately framed and detailed with precast sills and brick detail lintels. 215 N. College Project Development Plan — Type I (# 4-07) May 16, 2007 Administrative Hearing Page 2 EXECUTIVE SUMMARY: Mixed -use dwellings are permitted in the D—Downtown, Civic Center Sub -district, subject to an Administrative Hearing. This Project Development Plan complies with the applicable Administrative and General Development standards and the standards of the D— Downtown, Civic Center Sub -district. COMMENTS 1. Background J The surrounding zoning and land uses are as follows: N: D—Downtown, Civic Center Subdistrict (existing commercial and mixed -use buildings); E: D—Downtown, Old City Center Subdistrict (existing commercial and mixed - use buildings) with RDR—River Downtown Redevelopment District (vacant land and existing commercial buildings) beyond; S: D—Downtown, Civic Center Subdistrict (existing commercial buildings) with D—Downtown, Old City Center Subdistrict (existing commercial and mixed - use buildings) beyond; W: D—Downtown, Civic Center Subdistrict (existing civic and commercial buildings). The subject property currently contains an auto repair business. The structure has no historical significance. A neighborhood meeting was not required for this project and none was held. 2. Compliance with Applicable D—Downtown, Civic Center Sub -district Standards A. Purpose: The purpose of the D—Downtown is as follows: The Downtown District is intended to provide a concentration of retail, civic, office and cultural uses in addition to complementary uses such as hotels, entertainment and housing. It is divided into three (3) subdistricts as depicted on Figure 18. The development standards for the Downtown District are intended to encourage a mix of activity in the area while providing for quality development that maintains a sense of history, human scale and pedestrian -oriented character. The proposed project is a mix of housing, neighborhood support retail and office uses which meets this purpose statement very well. The proposed ITEM NO. MEETING DATE. STAFF Amno.1 City of Fort Collins HEARING OFFICER STAFF REPORT PROJECT: 215 North College Avenue Project Development Plan — Type I (# 4- 07) APPLICANT: Daniel Bernth Doberstein, Lemburg Commercial, Inc. 338 C E. Pitkin Street Fort Collins, CO 80524 OWNERS: Thomas Francis Fox Ridge at Severance, LLC 1531 Riverside Avenue Fort Collins, CO 80524 And Daniel Bernth 215 North College Avenue, LLC 338 C E. Pitkin Street Fort Collins, CO 80524 PROJECT DESCRIPTION: 215 N. College is proposed to be redeveloped into a three-story mixed -use project with approximately 8000 square feet of retail/commercial use on the first two floors and four multi -family dwelling units on the third floor. The property is zoned D—Downtown, Civic Center Sub -district. RECOMMENDATION: Staff recommends approval of 215 North College Avenue Project Development Plan — Type I (# 4-07) COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO.80522-0580 (970) 221-6750 PLANNING DEPARTMENT