[10/3/06] The applicant has indicated that the standard 8 foot utility easement behind the
alley ROW may not be needed by the public utility companies however, an 8 foot utility
easement is being shown on the plans and no variance request has been submitted by the
engineer. Until a formal variance request has been submitted and approved by the utility
providers, the City will require that an 8 foot wide utility easement dedication be submitted
with a $250 transportation development review fee. If a variance request is submitted and
approved, the utility easement should be removed from the plans.
[8/15/06] Alley standards require that an 8 foot wide utility easement be dedicated behind
the alley right-of-way. This proposed easement shall be shown and labeled on the Site Plan
Topic: Utility Plans
Number: 14 Created: 8/15/2006
[10/25/06] There are still some inconsistencies with property boundary line types. This may
be corrected at the final compliance stage.
[10/3/06] The lot lines are now being shown but the line types are very inconsistent or do
not correspond to the legend. Please revise line types accodingly, see redlines for
clarification.
[8/15/061 Please show the existing lot line between lots 4 and 5 on all sheets in the Utility
Plan set. Clearly label property lines and existing right-of-way limits.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Steve Olt
City Planner
Page 3
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 26 Created: 8/25/2006
[10/25/06] Credit may also be used for easement review fees.
[8/25/06] It appears that an overpayment of $460 was made on Transportation
Development Review Fee (TDRF). The City will issue a credit toward the final compliance
plan review such that the final plan review fee will only be $540 rather than $1000.
Number: 37 Created: 8/31/2006
[10/25/06] Penalty street cut fees will apply to this project for Wood Street.
[10/3/06] Same comment relating to street cuts on Wood Street for water service
connections.
[8/31/06] Pavement management comment - Wood Street was paved in 2003. Penalties will
apply to any street cuts made on Wood street - triple street cut fees.
Topic: Landscape Plans
Number: 67 Created: 10/25/2006
[10/25/06] A drainage easement is required for the detention ponds and associated
drainage structures connected to them. Please submit a drainage deed of dedication and
legal description for review with a City review fee of $250.00.
Number: 68 Created: 10/25/2006
[10/25/06] The detention pond to the south shall outlet to the gutter on Wood street via a
sidewalk chase and concrete channel through the parkway. Show this on the plan and
provide construction details.
Number: 69 Created: 10/25/2006
[10/25/06] Please show the low flow concrete channel on the grading plan. A detail is
provided.
Number: 70 Created: 10/25/2006
[10/25/06] There are two 5 foot utility easements being labeled on the far north and south
boundaries of the project. If these easements are for any public utilities, they must be
recorded by separate document. Please submit deeds of dedication and legal descriptions
for these proposed easements. The review fee is $250 per document.
Number: 71 Created: 10/25/2006
[10/25/06) Provide cross sections for B-B and C-C as shown on the redlines, Grading &
Drainage Plan.
Number: 72 Created: 10/25/2006
[10/25/06] Please add a standard City signature approval block to sheet DT1 - Detail sheet
Number: 73 Created: 10/25/2006
[10/25/06] Add street names to sheet UT1.
Topic: Site Plan
Number: 8 Created: 8/15/2006
[10/25/06] No easement document has been submitted. All easement documents and
review fees shall be submitted for at least one review prior to final plan approval.
Page 2
l
STAFF PROJECT REVIEW
City of Fort Collins
CRAIG MCKEE
SEE ABOVE
Date: 10/31 /2006
Staff has reviewed your submittal for 617 WOOD ST. - PDP - TYPE II, and we offer the
following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Landscape Plans
Number: 66 Created: 10/19/2006
[10/19/06] On the Landscape Plan, please add the required note about landscaping being
installed, or the installation being secured ... before certificates of occupancy can be issued.
Please see the red -lined Landscape Plan.
Topic: Site Plan
Number: 60 Created: 10/19/2006
[10/19/06] On the Site Plan cover sheet, under LAND USE STATISTICS, the one line item
dealing with "total land area and location and amount of open space included" refers to
residential, business, commercial, and industrial areas. This would seem to be incorrect in
that there does not appear to be any business, commercial, and industrial areas in this
project.
Number: 61 Created: 10/19/2006
[10/19/06] The 2 monument signs (at street front and alley) shown on the Site & Landscape
Plans should be removed from the plans. Signs are reviewed and approved separate from
the Project Development Plan review through the Zoning Department, based on the Sign
Code. The Planning & Zoning Board does not have authority over the signs.
Number: 62 Created: 10/19/2006
[10/19/06] On the Site Plan please show the 9' dimension for the garage door setback from
the porch front on Unit B, being the subject of your request for modification of standard set
forth in Section 4.7(F)(1 )@. Also, in your Modification of Standards Request, please add "for
Unit B" at the end of the sentence that requests a 9' setback instead of 10'.
Number: 63 Created: 10/19/2006
[10/19/06] More just a curious question ... What happens in the "area wells" for each unit?
Number: 64 Created: 10/19/2006
[10/19/06] The gates to the driveways for Units C & D, backing to the alley, are being
shown to either move to the comers of the walls or another gate is being proposed. Which is
correct? If there is a gate in the corners of these small courtyards will there be walkways
provided from the gates to the alley?
Number: 65 Created: 10/19/2006
[10/19/06] The Site Plan shows 3 "150' Fire Hose" lines from Wood Street to points back on
the property. Will the gates on the north and south property lines (2 each) remain unlocked
so that firemen can get through the gates, with their hoses, without delay?