HomeMy WebLinkAbout617 WOOD ST. (MORIE AT CAPITOL HILL) - PDP - 22-06 - CORRESPONDENCE - (3)0
plans when you re -submit. The number of copies of each document to re-
submit is shown on the attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
km D)r
Steve Olt
City Planner
cc: Randy Maizland
Vaught * Frye Architects
Alpine Consulting Engineers
Lindgren Landscape & Irrigation
Current Planning File #22-06
Page 9
0
Stormwater/Wes Lamargue
L Where is the new curb along Wood Street?
2. Better documentation is needed to determine if there is more or less
than 5,000 square feet of imperviousness on the site. This
determines if on -site detention is needed or not.
Transportation Planning/David Averill
1. What is the stone -looking element along the front of the property.
2. The existing attached sidewalk along Wood Street may have to be
widened.
Engineering/Randy Maizland
1. The Technical Services Department has indicated that the street
address (617) should not be part of the development name. New,
consistent titles must be provided on all plans.
2. Show the existing property lines on the grading plan sheet.
3. An 8' wide utility easement is needed outside of the right-of-way
along the alley. Utilities will have to approve the walls being
proposed in the easement.
4. Show the limits of the necessary street cuts in Wood Street.
Planning/Cameron Gloss & Steve Olt
1. The building coverage on the rear 50% of the lot appears to exceed
the FAR requirement set forth in Section 4.7(D)(5) of the Land Use
Code.
2. City staff will be supporting the modification request for the alley
paving.
This represents staff (and outside reviewing agencies) review and comments
at this time. Additional comments and red -lined plans may be forthcoming.
Another round of staff review is determined to be necessary. This proposal
is subject to the 90-day revision re -submittal requirement (from the
date of this comment letter, being September 1, 2006) as set forth in
Section 2.2.11(A) of the Land Use Code. Be sure and return all red -lined
Page 8
Number: 29 Created: 8/29/2006
[8/29/061 Show gas and electric lines and services and provide separation
from other utilities.
Number: 30 Created: 8 / 29 / 2006
[8/29/06] If the clean -outs on the sewer services are in the driveways,
traffic rated clean -outs are required. Include the standard detail.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 1 Created: 8 / 11 / 2006
[8/ 11/06] Show/label the street on the site plan.
Number: 2 Created: 8 / 11 / 2006
[8/ 11/06] The garage is setback 9' behind the front setback of the building
(the porch). Sec. 4.7(F)(1)(c) requires the garage to be setback 10' behind
the front setback of the building. Therefore, the garage needs to be moved
back one foot, or the porch needs to extend 1' further to the east towards
the front lot line.
Number: 3 Created: 8/ 11 /2006
[8/ 11/06] Portions of the courtyard walls appear to be taller than 6'. If
that's the case, those portions must comply with the same setbacks that
apply to the building (15' front, 5' rear and 5' side).
Number: 4 Created: 8 / 11 / 2006
[8/ 11/06] Is there a basement? If so, please indicate on plans, and
whether or not the basement can accommodate any future bedrooms.
The following comments were expressed at the staff review meeting on
August 30, 2006:
Light & Power/Janet McTague
1. The developer will receive credit for the existing single-family
residence on the property when the standard development fees are
paid.
2. Electric services for all 4 dwelling units will be from the alley. Utility
easements will be needed for these services.
Water & Wastewater/Roger Buffington
1. Additional information is needed to avoid potential utilities conflicts.
Page 7
0
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number: 5 Created: 8 / 11 / 2006
[8/ 11/06] No problems from Traffic Operations.
Department: Transportation Planning Issue Contact: David Averill
Topic: Water/Wastewater
Number: 31 Created: 8/ 29/ 2006
[8/29/06] Sidewalk on Wood Street isn't represented consistently between
the site and utility plan sets. What is the proposed improvement exactly?
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Stormwater
Number: 38 Created: 9 / 1 / 2006
[9/ 1/06] Please clearly document the impervious area's net increase for
this site. The calculations indicate the net increase to be over 7,000 s.f.,
which would require this site to provide on -site quantity and quality
detention.
Number: 39 Created: 9 / 1 / 2006
[9/ l/06] Please update the drainage report text to the current site and edit
all inconsistencies.
Number: 40 Created: 9 / 1 / 2006
[9/ 1/061 Please label building F.F. elevations.
Number: 41 Created: 9 / 1 / 2006
[9/ 1/06] The flows from the site need to be directed to Wood Street and the
alley. Please document on the drainage plan that onsite flows will not enter
neighboring properties and flow to the street and alley. This needs to be
done with flow arrows and spot elevations that support the design.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/Wastewater
Number: 27 Created: 8/ 29 / 2006
[8/29/06] On the overall utility plan, show the property lines and utility
easements.
Number: 28 Created: 8/29/2006
[8/29/06] The curb stops must be in the utility easement adjacent to Wood
Street, and the meter pits must be within 2 feet of the curb stops.
Page 6
0
Department: Natural Resources Issue Contact: Doug Moore
Topic: Landscape Plans
Number: 25 Created: 8/ 18/2006
[8/ 18/06] Please include tree preservation standards and protection notes
on the Landscape Plans, contact the City Forestry Department for more
information. LUC 3.2.1
Topic: Utility Plans
Number: 24 Created: 8/ 18/2006
[8/ 18/06] Please include Limits of Development (L.O.D.) lines and detail of
L.O.D. fencing around existing trees to be preserved. LUC 3.2.1, 3.4.1(N)(1)
& (2)
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 33 Created: 8/30/2006
[8/30/061 WATER SUPPLY: Fire hydrants must be the type approved by the
water district having jurisdiction and the Fire Department. Hydrant spacing
and water flow must meet minimum requirements based on type of
occupancy. Spacing and flow requirements for residential structures inside
the Urban Growth Area are 1,000 gpm at 20 psi residual. pressure, spaced
not further than 400 feet to the building, on 800-foot centers thereafter.
97UFC901.2.2.2. The locations of the nearest fire hydrants must be shown
on the plan.
Number: 34 Created: 8/30/2006
[8/30/06] REQUIRED ACCESS: If any portion of an exterior wall of the first
story of the building is located more than 150 feet from fire apparatus
access as measured by an approved route around the exterior of the
building or facility, the buildings must be equipped with approved
automatic fire sprinklers. (Not only do the buildings exceed this distance,
but the proposed fences further limit access.)
Number: 35 Created: 8/30/2006
[8/30/06] ADDRESSING: Address numerals shall be visible from the street
fronting the property, and posted with a minimum of six-inch (6) numerals
on a contrasting background. (Bronze numerals on brown brick are not
acceptable). 97UFC901.4.4. Each of these buildings must also be given a
unit letter designation (A-D). Because it will,"appear that only two houses
have been constructed", the project also must include a monument sign
visible from the street, showing the 617 Wood St. address and also the A-D
units.
Page 5
0
proposed walls on the site that may prevent positive flow to the street or
alley.
Number: 16 Created: 8/ 15/2006
[8/ 15/06] Show new proposed curb cuts for the drive approaches on Wood
Street on the Grading Plan sheet.
Number: 17 Created: 8/ 15/2006
[8/ 15/06] Please provide the finish floor building elevations on the Grading
Plan.
Number: 18 Created: 8/ 15/2006
[8/ 15/06] Show and label the proposed 8 foot wide utility easement to be
dedicated behind the alley right-of-way on the Utility Plan sheet.
Number: 19 Created: 8/ 15/2006
[8/ 15/06] Please show and label the nearest fire hydrant location on the
Utility Plan sheet.
Number: 20 Created: 8/ 15/2006
[8/ 15/06] Show and label all property lines and right-of-way limits on the
Utility Plan sheet.
Number: 21 Created: 8/ 15/2006
[8/ 15/06] Show proposed driveway curb cuts on Wood Street and proposed
limits of street cuts for water connections on the Utility Plan sheet. Add the
City standard street cut note provided to the plans.
Number: 22 Created: 8/ 15/2006
[8/ 15/06] Please remove the City standard engineer's indemnification
statements from the Utility Plan sheet. These statements are shown on the
cover sheet only.
Number: 23 Created: 8/ 15/2006
[8/ 15/06] Please refer to the redline check prints for addition comments
related to drafting and labeling.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light 8s Power
Number: 6 Created: 8/ 15/2006
[8/ 15/06] Developer will need to coordinate electric utility requirements,
electric facility locations & electric development charges with Light &v Power
Engineering (221-6700).
Page 4
0 •
Number: 8 Created: 8/ 15/2006
[8/ 15/06] Alley standards require that an 8 foot wide utility easement be
dedicated behind the alley right-of-way. This proposed easement shall be
shown and labeled on the Site Plan.
Number: 9 Created: 8/ 15/2006
[8/ 15/06] Please dimension the existing sidewalk on the Site Plan and
clearly label all property lines. Per the staff review meeting on Aug 30, a
minimum 6 foot wide attached sidewalk shall be constructed in front of the
development on Wood Street: Please accurately show this on the Utility and
Site Plans.
Topic: Technical Services
Number: 32 Created: 8/29/2006
[8/29/06] Please change the title of the plans. Addresses may change and
buildings will not have the same address. Do not use address numbers in
the title. Each plan sheet should have an adequate title description, see red
line comments attached.
Topic: Utility Plans
Number: 10 Created: 8/ 15/2006
[8/ 15/0.6] Please add the legal description and subdivision name to the title
on the cover sheet and provide the month and year below the title.
Number: 11 Created: 8/ 15/2006
[8/ 15/06] Provide the owner's name, address, and phone number on the
cover sheet
Number: 12 Created: 8/ 15/2006
[8/ 15/06] Provide the geotechnical engineer's name, address, and phone
number with a reference to the soils report date on the cover sheet.
Number: 13 Created: 8/ 15/2006
[8/ 15/06] Provide all 48 standard PDP general notes from Appendix E-1.
Any notes that do not apply to the project may be lined out but should not
be deleted.
Number: 14 Created: 8/ 15/2006
[8/ 15/06] Please show the existing lot line between lots 4 and 5 on all
sheets in the Utility Plan set. Clearly label property lines and existing right-
of-way limits.
Number: 15 Created: 8/ 15/2006
[8/ 15/06] Show surface drainage patterns with arrows along the north and
south sides of the proposed duplexes on the Grading Plan sheet. No
drainage shall be conveyed or diverted onto the adjacent property. Show any
Page 3
0 •
Number: 45 Created: 9/ l/2006
[9/ 1 /06] See red -lined Architectural Site Plan (AS.1) for Current Planning
comments.
Number: 49 Created: 9 / 1 / 2006
[9/ 1/06] The Site and Landscape Plans must better demonstrate that the
minimum side yard widths, as set forth in Section 4.7(E)(4) of the Land Use
Code, are being met.
Topic: Utility Plans
Number: 42 Created: 9 / 1 / 2006
[9 / 1 / 06] Dennis Greenwalt of Comcast Cable TV indicated that they would
like a 6' wide utility easement outside of the alley right-of-way along the
back side of this property. Also, Comcast will need to have contact with the
property owner about how to pre -wire the buildings so that services can be
provided without going through the landscaping.
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 26 Created: 8/25/2006
[8/25/06] It appears that an overpayment of $460 was made on
Transportation Development Review Fee (TDRF). The City will issue a credit
toward the final compliance plan review such that the final plan review fee
will only be $540 rather than $1000.
Number: 36 Created: 8/ 31 / 2006
[8/ 31 / 06] Per the Aug 30 staff review meeting, it appears that two
easement documents will need to be recorded for this project. One for the 8
foot utility easement behind the alley ROW and a utility easement from the
alley up to the front of the units facing Wood Street for power, gas etc...
Each easement document must have a legal description and exhibit map
prepared and stamped by a CO licensed surveyor and submitted for review
by the City prior to recordation. The City review fee is $250 per easement
document. Both easements must be recorded prior to final plan approval
and issuance of a Development Construction Permit.
Number: 37 Created: 8/ 31 / 2006
[8 / 31 / 06] Pavement management comment -Wood Street was paved in
2003. Penalties will apply to any street cuts made on Wood street - triple
street cut fees.
Topic: Site Plan
Number: 7 Created: 8/ 15/2006
[8/ 15/06] Show and label all existing lot lines on the Site Plan. Provide the
legal description on the cover sheet.
Page 2
00
(M59693001
STAFF PROJECT REVIEW
City of Fort Collins
s
Craig McKee Date: 09 / 01 / 2006
McKee Brothers, LLC
221 East Lincoln Avenue
Fort Collins, CO. 80524
Staff has reviewed your submittal for 617 WOOD STREET HOMES,
PROJECT DEVELOPMENT PLAN (PDP) - TYPE 2, and we offer the
following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Elevations
Number: 50 Created: 9 / 1 / 2006
[9/ l/06] Please see red -lined Exterior Building Elevations (A2.1, A2.2) for
Current Planning comments.
Topic: Landscape Plans
Number: 46 Created: 9/ 1 /2006
[9/ l/06] See red -lined Landscape Plan (Lr) for Current Planning
comments.
Number: 47 Created: 9 / i / 2006
[9/ 1/06] Street trees are required along the Wood Street frontage. In this
case they should be between 3' & 7' behind the attached sidewalk.
Number: 48 Created: 9 / 1 / 2006
[9/ 1/06] The Landscape Plan is devoid of any sort of Plant List or Legend.
The actual plant species, sizes, quantities and standard landscape notes
must be included on the Final Landscape Plan. At the PDP stage just
general locations for deciduous 8s evergreen trees and planting areas for
deciduous & evergreen shrubs must be shown.
Topic: Site Plan
Number: 43 Created: 9 / 1 / 2006
[9/ l/06] Current Planning and Zoning have concerns about the Floor
Area Ratio (FAR) for this project. Based on the requirements set forth in
Section 4.7(D)(5) in the Land Use Code, lots are subject to a maximum FAR
of 0.33 on the rear 50% of the lot as it existed on October 25, 1991. The
PDP Site Plan as submitted appears to slightly exceed this requirement.
Number: 44 Created: 9 / 1 / 2006
[9 / 1 / 06] Please indicate the existing zoning on the property on the
Preliminary Site Plan.