Loading...
HomeMy WebLinkAboutHILLCREST P.U.D., TRACT ''A'' REPLAT - PDP - 36-09 - CORRESPONDENCE - (3)cc: Andrew Carney Fort Collins Housing Corp. Current Planning file #36-09 Page 3 Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 14 Created: 12/2/2009 Regarding replatting, PFA has no comments or concerns at this time. Department: Transportation Planning Issue Contact: Jennifer Petrik Topic: General Number: 7 Created: 12/1 /2009 [12/1/09] The City standard requires detached sidewalks. Detached sidewalks will not be required at this time. Detached sidewalks may be required in the future with on -site improvements. Department: Technical Services Issue Contact: Jeff County Topic: Plat Number: 1 Created: 11 /19/2009 [11/19/09] The plat boundary closes. Number: 2 Created: 11 /19/2009 [11/19/09] Survey note #1 of the subdivision plat is incomplete. Number: 3 Created: 11 /19/2009 [11/19/09] Please change the plat title to Hill Crest PUD Second Filing. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 8 Created: 12/1 /2009 [12/1/09] There is an existing 6" water main and an 8" sanitary sewer that run north/south through the site. The plat identifies a 20' sewer easement. In addition, there are utility and drainage easements shown on each side of the sewer easement. Provide a drawing showing these water and sewer line locations with respect to the easement boundaries shown on the plat. Department: Zoning Issue Contact: Jenny Nuckols Topic: ZONING Number: 6 Created: 11 /30/2009 [11/30/09] No comments An additional round of review is necessary to address these staff comments before this item can be scheduled for an administrative public hearing. Be sure and return all red -lined plans when you re -submit. A copy of a Revision Routing Sheet is attached to this comment letter. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Steve Olt City Planner Page 2 STAFF PROJECT REVIEW a�� City of Fort Collins Stewart & Associates, Inc. Date: 12/15/2009 c/o Jerry Robinson 103 South Meldrum Street Fort Collins, CO 80521 Staff has reviewed your submittal for Hill Crest PUD, Tract "A" Replat, PDP (Type 1), and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 15 Created: 12/15/2009 [12/15/09] Planning has no comments on the Replat. Department: Current Planning Issue Contact: Dana Leavitt Topic: Plat Number: 5 Created: 11 /30/2009 [11/30/09] No comments. Department: Engineering Issue Contact: Andrew Carney Topic: Plat Number: 9 Created: 12/2/2009 [12/2/09] It appears that a 3 foot utility easement is being dedicated within an existing building envelope. If so, the building envelope line must be moved back to behind the utility easement, they cannot overlap. Number: 10 Created: 12/2/2009 [12/2/09] Survey note #1 is incomplete. Number: 11 Created: 12/2/2009 [12/2/09] Who is the owner of the existing 10' irrigation lateral easement? They may need to review/sign the plat since this replat is creating a new lot line that crossed their easement. Number: 12 Created: 12/2/2009 [12/2/09] Please label very clearly which easement lines are moving/being vacated/created the area is very cluttered and confusing. Number: 13 Created: 12/2/2009 [12/2/09] See red -lines for additional comments. Department: Light & Power Issue Contact: Doug Martine Topic: Plat Number: 4 Created: 11 /19/2009 [11/19/09] As noted in the Planning Objectives, no utility changes are necessary. Therefore, Light & Power has no comments. Page 1