Loading...
HomeMy WebLinkAboutJENNINGS SUBDIVISION - PDP - 14-09 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW609 City Park Avenue Subdivision Response to Comments (Conceptual) — Page 3 Planning (Cont.) 8. Noted. 9. Noted. 10. Noted. 11. Noted. 609 City Park Avenue Subdivision Response to Comments (Conceptual) — Page 2 Poudre Fire Authority 1. Noted. Light & Power 1. Noted. Engineering 1. Noted. 2. Noted. 3. Per Ward Stanford and Matthew Wempe, a Transportation Impact Study is not required. 4. Right -of -Way, easements, and sidewalks have been provided per the City's requests. 5. Noted. Utility plans provided. 6. Noted. 7. Sidewalks design has been provided per the City's requests. 8. Noted. 9. Noted. Planning 1. Noted. 2. Noted. 3. Noted. 4. Noted. 5. Noted. 6. Noted. 7. Noted. Response to Conceptual Review Staff Comments 609 City Park Avenue Subdivision March 24, 2009 Zoning 1. Noted. 2. Noted. 3. Noted. Modification of Standards is being requested. 4. Noted. 5. Noted. 6. Noted. 7. Noted. 8. Noted. 9. Noted. Stormwater Utility 1. Noted. This proposal does not increase the impervious area by more than 5000 square feet. Drawing and drainage letter provided. 2. Noted. Onsite detention is not required. 3. Noted. Grading Plan is provided. 4. Noted. 5. Noted. Water & Wastewater 1. Water and sewer services have been stubbed into the proposed lot to the north. 2. Noted. Environmental Planning 1. Noted.