Response to Comments (Conceptual) — Page 3
Planning (Cont.)
8. Noted.
9. Noted.
10. Noted.
11. Noted.
609 City Park Avenue Subdivision
Response to Comments (Conceptual) — Page 2
Poudre Fire Authority
1. Noted.
Light & Power
1. Noted.
Engineering
1. Noted.
2. Noted.
3. Per Ward Stanford and Matthew Wempe, a Transportation Impact Study is not
required.
4. Right -of -Way, easements, and sidewalks have been provided per the City's
requests.
5. Noted. Utility plans provided.
6. Noted.
7. Sidewalks design has been provided per the City's requests.
8. Noted.
9. Noted.
Planning
1. Noted.
2. Noted.
3. Noted.
4. Noted.
5. Noted.
6. Noted.
7. Noted.
Response to Conceptual Review Staff Comments
609 City Park Avenue Subdivision
March 24, 2009
Zoning
1. Noted.
2. Noted.
3. Noted. Modification of Standards is being requested.
4.
Noted.
5.
Noted.
6.
Noted.
7.
Noted.
8.
Noted.
9.
Noted.
Stormwater Utility
1. Noted. This proposal does not increase the impervious area by more than 5000
square feet. Drawing and drainage letter provided.
2. Noted. Onsite detention is not required.
3. Noted. Grading Plan is provided.
4. Noted.
5. Noted.
Water & Wastewater
1. Water and sewer services have been stubbed into the proposed lot to the north.
2. Noted.
Environmental Planning
1. Noted.