HomeMy WebLinkAboutBELLA VIRA - PDP - 36-05A - CORRESPONDENCE - (10)Number: 95 Created: 4 / 20 / 2006
[4/20/061 At final, there needs to be some reconfiguration of the water
services in the multi -family area. The meter pits are directly adjacent to the
driveways or sandwiched between two driveways. The meter pits are not
traffic rated and there is a good chance they will be driven over being so
close to the pavement. There should be ample room to move these to
another location along each building. A distance of 5 feet from the driveway
to the edge of the meter pit would be adequate.
Number: 97 Created: 4/ 20/ 2006
[4/20/06] Water/Wastewater is ready for a hearing. At final design,
additional detailed comments may be presented.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 5 Created: 12 / 23 / 2005
[4/6/06] I understand the applicant is requesting a modification to this
standard. If the modification is approved, then this is resolved.
[12/23/051 Section 4.2(E)(2)(b) limits the maximum density in the RF
cluster plan to not more than 1 unit per gross acre. The gross area of the
RF portion is a little over 15 acres, meaning that the maximum number of
dwelling units in the cluster plan is limited to 15. They are proposing 20
dwelling units.
The Bella Vira, PDP is being scheduled for the May 18, 2006, Planning and
Zoning Board public hearing. Be sure and return all red -lined plans when
you re -submit or submit Final Compliance plans.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt
City Planner
cc: Dan DeLaughter
Jim Sell Design/Matt Blakely
Current Planning file #36-05A
Page 9
Number: 70 Created: 2 / 6 / 2006
[4/ 19/06] Again, this pertains to the multi -family dwellings on Bella Vita
Drive. The Fire Department Connections (FDCs) must be on the fire lane
side, so they are accessible.
[2/6/06] An approved automatic fire sprinkler system shall be installed
throughout multi -family dwellings three or more stories in height.
Number: 92 Created: 4/ 19/2006
[4/ 19/06] We require a Knox Box be mounted to the appropriate
structure(s) so we can access the automatic -sprinkler riser room(s)
supplying the multi -family dwellings.
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number: 57 Created: 1 / 13 / 2006
[4/ 18/06] Repeat comment/question.
[1/ 13/06] Would it be possible to better align the pedestrian crossing of
West Elizabeth (west side of Overland) so that the crossing isn't skewed. I
understand that there are some utility conflicts but would like to see if we
can fix this. Thanks.
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Stormwater
Number: 96 Created: 4/20/2006
[4/20/06] Stormwater is ready for a hearing. At final, detailed comments
may be offered once more information is presented.
Topic: Water/Wastewater
Number: 45 Created: 1 / 10 / 2006
[4/20/061 Easement is adequate. Will need to see official documents
during final compliance.
[ 1 / 10/ 06] The tap to the existing 16-inch water main needs to be in a
utility easement as well as the new line entering the site. This may require
an off -site utility easement.
Number: 93 Created: 4/20/2006
[4/20/06] At final, please provide water service sizing calculations to
determine if a 1-inch service will be adequate for the 5 and 6-plex buildings.
Number: 94 Created: 4/20/2006
[4/20/06] At final, please provide calculations for the sizing of the
insulation thickness for the 16-inch waterline.
Page 8
require a modification to the Land Use Code, or pulling and re -submitting
after the new private drive standards are approved. With the latter option,
all new Transportation Development Review fees would apply.
Number: 26 Created: 12 / 29 / 2005
[4/6/06] The request has been granted.
[12/29/05] A variance request will be needed to eliminate the 9' utility
easement on the north side of Elizabeth.
Topic: Technical Services
Number: 98 Created: 4/20/2006
[4/20/06] Tech. Services Comments:
1. Easements need to be locatable on the plat.
2. Note the origin of ROW dedication for Overland Trail.
3. Fix overlapping text.
Department: PFA Issue Contact: Carie Dann
Topic: fire
Number: 67 Created: 2 / 6/ 2006
[4/ 19/06] This issue is revolved. However, I wanted to note that this private
drive is now named Bella Vita Drive. Also, we need to ensure it is designated
EAE on the plat.
[2/6/06] The private drive shown as Vira Drive shall be a fire lane and
shown on the plat as an emergency access easement. Vira Drive is required
to be an unobstructed 20-foot-wide fire lane, signed "FIRE LANE - NO
PARKING" and painted with red curbs, and it shall meet the remainder of
the design criteria for fire lanes stipulated in section 3.6.6 of the FCLUC.
Number: 68 Created: 2/6/2006 '
[4/ 19/06] This is now Bella Vita Drive. We request that buildings are
numbered in a clockwise fashion beginning with the first building we
access. Therefore, entering Bella Vita Drive from the east access, the
buildings should be numbered as follows: The building shown on the site
plan as #5 should be #1; shown Bldg 6 should be 2; shown Bldg 2 should
be 3; shown Bldg 1 should be 4; shown Bldg 3 should be 5; and shown Bldg
4 should be 6. Also, we require monument signs at each access point to
Bella Vita Drive, showing building numbers accessed on that private drive.
[2/6/06] The multi -family dwellings on Vira Drive shall be addressed with
consecutive numerals; the two buildings on the inside tract shall have odd
numerals and the buildings on the outside shall have even numerals.
Addresses on the structures shall be visible from Vira Drive, mounted on
the buildings with numerals at least six inches high on a contrasting
background. (Bronze numerals on brown brick are not allowed.) Monument
signage showing the building addresses shall also be mounted at each entry
onto Vira Drive, from Elizabeth Street.
Page 7
[12/29/05] Sheet 7: In several locations, you're showing offsite grading to
tie in your contours. Grading and/or construction easements would be
required in these locations with letters of intent from the affected property
owners received prior to hearing. This also applies on the south side of the
site, where it appears that you plan to construct sidewalk along the FC-
Loveland Water District's frontage.
Number: 16 Created: 12/29/2005
[4/6/06]
[12/29/05] Where slopes exceed 4:1 affecting public improvements, our
standards (LCUASS 7.7.2) require retaining walls. It's appears that these
slopes are exceeded near the storm drain pipes under Elizabeth.
Number: 19 Created: 12/29/2005
[4/6/06]
[12/29/05] Please label and dimension all existing and proposed sidewalks
and accesses.
Topic: Landscape plan
Number: 88 Created: 4 / 7 / 2006
[4/7/06] Add dimension arrows for the easements on the site and
landscape plans.
Topic: Plat
Number: 7 Created: 12/29/2005
[4/6/06] Repeat
[12/29/051 Remove centerlines on easements- they just clutter the
drawing.
Topic: Streets
Number: 21 Created: 12/29/2005
[4/6/06]
[ 12 / 29 / 05] Flowline profiles will be needed in addition to centerline profiles
for final compliance. Also at final, we'll want to see station and approximate
locations of all utility crossings, and driveways.
Number: 22 Created: 12/29/2005
[4/6/06]
[12/29/05] Sheet 10: Please reference the design mentioned in Sunflower
Dr. note.
Number: 24 Created: 12/29/2005
[4/6/06] (PH)
[12/29/05] Under the standards at the time of this submittal, it is not
permissable to have a named private drive. The proposed layout would be
ok for an unnamed private drive, but to pursue a named one would either
Page 6
Number: 81 Created: 4 / 6 / 2006
[4/6/06] Please remove the car shapes from the utility plans - they only
clutter the sheet.
Number: 82 Created: 4 / 6 / 2006
[4/6/06] Label and dimension all utility easements on the utility sheets.
Number: 83 Created: 4 / 6 / 2006
[4/6/06] The section of Elizabeth between the eastern Bella Vita access and
Overland Trail should not have any parking on -street.
Number: 84 Created: 4 / 6 / 2006
[4/6/06] District Utilities signature block is not included on details sheets.
Number: 85 Created: 4 / 6 / 2006
[4/6/06] Please refer to redlines for additional minor changes and
comments.
Number: 86 Created: 4 / 7 / 2006
[4/7/06] (PH) The parking space closest to Elizabeth on the eastern portion
of Bella Vita Dr. should be eliminated. It defeats the purpose of widening
out the entrance
Number: 87 Created: 4/7/2006
[4/7/06] (PH) Please add pedestrian access ramps at the ends of all the cul-
de-sac bulbs per LCUASS Fig. 7-14.
Number: 90 Created: 4/ 19/2006
[4/ 19/06] The Ditch Company should sign all applicable plan sheets, as
well as the plat.
Number: 91 Created: 4/ 19/2006
[4/ 19/06] Per LCUASS Section 7.7.4, concentrated flows across a sidewalk
are not allowed. Engineering has set the maximum area of impervious area
allowable at 750 square feet. Please adjust the design of your cul-de-sacs to
meet this requirement. This will apply on Fiore Ct. and on Pratolina Ct.
Number: 99 Created: 4 / 21 / 2006
[4 / 21 / 06] Please add a splash guard to the other side of the water main
vault, and flatten the grade in order to provide more cover over the 16"
water line that runs under the area.
Topic: Grading plans
Number: 11 Created: 12 / 29 / 2005
[4/6/06] Terry Farrill has indicated that offsite grading on FC Loveland
property is ok as shown.
Page 5
Appendix E-6, and talk with J.R. in our technical services department
regarding how to clean up the drawings.
Number: 31 Created: 12 / 29 / 2005
[4/6/06]
[12/29/051 Refer to redlines for additional minor comments.
Number: 55 Created: 1 / 11 / 2006
[4/6/06] Still Missing on detail sheets
[ 1 / 11 / 06] District Utilities signature block should be provided on all
sheets.
Number: 74 Created: 4 / 6 / 2006
[4/6/06] This plan set would benefit largely from including a separate
existing conditions/demolition and removal plan sheet. Then, you can pull
off existing features from many other sheets where they are not really
needed.
Number: 75 Created: 4 / 6 / 2006
[4/6/06] (PH) Bella Vita Dr. must also be dedicated as an emergency access
easement. You will probably want to specify the easement area separately
from the Tract A on the plat, since the parking bump outs would not be able
to be used if dedicated as emergency access.
Number: 76 Created: 4 / 6 / 2006
[4/6/06] There are many instances of overlapping text and contours on all
sheets.
Number: 77 Created: 4 / 6 / 2006
[4/6/06] (PH) Please show the offsite trail connection to the Ponds trail on
the SE corner of the site.
Number: 78 Created: 4 / 6 / 2006
[4/6/06] Please extend street profiles to the centerline of intersecting
streets.
Number: 79 Created: 4 / 6 / 2006
[4/6/06] (PH) On the Overland Trail improvements sheet, you are showing
an "interim condition" for the existing access location. This access should
be removed and closed, since no phasing has been proposed.
Number: 80 Created: 4 / 6/ 2006
[4/6/06] Please show striping to indicate the location of the bike lane north
of the barricade.
Page 4
Number: 109 Created: 4/27/2006
[4/27/061 Doug Martine of Light & Power offered the following comment:
The issue of the manhole in the gutter area of Overland Trail has been
discussed by Light & Power staff. Having a manhole in this position will
result in significant water entering the vault. Water in the vault is
compounded by the use of magnesium chloride products to de-ice
roadways. The resulting corrosion of electric equipment is a major issue
that will need to be resolved. This issue will not prevent the project from
proceeding to a Planning & Zoning Board public hearing, with the
exception of a possible decision to relocate the curb (narrowing the bike
lane) being an issue for others such as the Streets Department. Please
be aware that if the curb cannot be relocated to the east, it will be
necessary for Light & Power to relocate the vault at the developer's
expense. Since this is a major substation tie facility (the most major
underground line Light & Power installs), the cost of relocation could be
well over $20,000.00.
Please contact Doug, at 224-6152, if you want to discuss this matter
further.
Department: Engineering Issue Contact: Dan
DeLaughter
Topic: Details
Number: 27 Created: 12 / 29 / 2005
[4/6/06]
[12/29/051 Provide spot elevations on south side of Overland Access. Also,
provide proposed elevations for new edge of pavement (Final compliance
issue).
Number: 28 Created: 12/29/2005
[4/6/06]
[12/29/05] Please provide all necessary details from LCUASS. None of our
standard drawings are currently shown.
Number: 29 Created: 12 / 29 / 2005
[4/6/06]
[12/29/05] For vault detail, splash guard is only shown on one side. If not
proposed on the other side, change the note, and ensure that there is 1'
clear flat area behind the sidewalk.
Topic: General
Number: 30 Created: 12 / 29 / 2005
[4/6/06]
[12/29/051 Scanability is an issue on many of the sheets. Some line types
are too light, some overlapping text problems. Please refer to redlines,
Page 3
Topic: Landscape plan
Number: 100 Created: 4/27/2006
[4/27/061 Remove the Fort Collins -Loveland Water District, South Fort
Collins Sanitation District signature block from Sheet L2 of 5 of the
Landscape Plans.
Number: 101 Created: 4/27/2006
[4/27/06] On Sheet L4 of 5 of the Landscape Plans, the trail from West
Elizabeth Street to Sunflower Drive should be a 6' wide concrete surface
trail. It becomes a 6' wide soft surface trail west of Sunflower Drive to the
west property boundary.
Number: 102 Created: 4/27/2006
[4/27/06] On Sheet L4 of 5 of the Landscape Plans, the north property
boundary is now the PROPERTY BOUNDARY/L.O.D./CITY LIMITS and the
reference to CITY LIMITS must be removed from the south property
boundary. The annexation for the Minatta Property is complete.
Number: 103 Created: 4/27/2006
[4/27/06] Correct the double image for Tract B on the south side of the
development, close to Banyan Drive, on sheet L4 of 5 of the Landscape
Plans.
Number: 104 Created: 4/27/2006
[4/27/06] On Sheet L5 of 5 of the Landscape Plans, the north property
boundary is now the PROPERTY BOUNDARY/L.O.D./CITY LIMITS and the
reference to CITY LIMITS must be removed from the south and west
property boundaries. The annexation for the Minatta Property is complete.
Number: 105 Created: 4/27/2006
[4/27/06] On Sheet L5 of 5, the trail from Fiore Court to Sunflower Drive
should be a 6' wide concrete surface trail. It becomes a 6' wide soft surface
trail west of Sunflower Drive to the west property boundary.
Topic: Utility Plan
Number: 108 Created: 4/27/2006
[4/27/061 Terry Farrill of the Fort Collins -Loveland Water District & the
South Fort Collins Sanitation District made the following comment:
A note is to be shown on all sheets relative to the District's existing 36"
water line to indicate that all work near the water line or within the
District's easement is to be coordinated with the District prior to
commencing work.
Please contact Terry, at 226-3104 x 104, if you have questions or require
additional information.
Page 2
City of Fort Collins
John Minatta
2037 Lexington Court
Fort Collins, CO 80526
STAFF PROJECT REVIEW
Date: 04/ 27/ 2006
Staff has reviewed your submittal for BELLA VIRA, PDP - TYPE II, and we
offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 106 Created: 4/27/2006
[4/27/06] Bonnie Ham, the Growth Coordinator for the Post Office,
indicated that the developer's responsibility for providing mailboxes has
been acknowledged by the developer.
Number: 107 Created: 4 / 27 / 2006
[4/27/06] Alden Hill and Edward Wendel, representing the Pleasant Valley
8s Lake Canal, indicated that the Bella Vira development plans do not
appear to affect the Pleasant Valley Ditch.
Number: 110 Created: 4/ 27/ 2006
[4/27/06] The following comments were expressed by staff at their
development review meeting on April 19, 2006:
Engineering
a. The Pleasant Valley & Lake Canal Company must sign all affected plan
sheets.
b. Some cul-de-sac areas exceed the 750' drainage requirement.
c. No concentrated storm drainage flows can cross sidewalks.
Natural Resources
a. The architectural standards need more work.
Poudre Fire Authority
a. The numbering on the buildings in the multi -family area must go in .a
clockwise direction, starting with the building right at the corner of
West Elizabeth Street and North Overland Trail.