HomeMy WebLinkAboutPRESIDIO APARTMENTS - FDP - 25-09/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETN3L) 'A
Final Plan Routing Sheet City of
ColllilS
/-
Azf/ D/ Q 6,*rJ• �/N.4L �Fort
This project went to / has been scheduled for Public Hearing on: ,EEe7-. / 7. 9
The following table lists final plan submittal requirements for this project.
A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced.
Fee Waiver/Reduction Approval:
Amount:
Date: 0 !/
Planner: 77-S.
Engineer:
Items
Requested
Engineering Pavement
wi■r■■■■w■■■■
■■■■
-..
■
MMMMM■■■■■
■■■■
•
■■■■■■■■M■■■■■■
.
►AFA
rA■"FAM■■■■■
i■■■
Street • •
MMMM■■■■■■■
■■■■
►AAFAFA■■■■■■■■
■■■■
111,111NO . . • •
w■■■■■rol
■■■■■■■■■
wwwww■■■■■■
■■■■