Loading...
HomeMy WebLinkAboutPRESIDIO APARTMENTS - PDP - 25-09 - CORRESPONDENCE -Number: 5 Created: 8/6/2009 [8/6/09] Entry Monument. A separate review and permit is required for signage. The entry monument sign shown on these drawings does not receive approval at the time of this developments approval. Number: 6 Created: 8/6/2009 [8/6/09] Provide note on landscape plan regarding installation of landscaping prior to issuance of CO. Comments from Current Planning: Re -name the plat so it that "Presidio" is the first word. 2. Show the berm locations on the Landscape Plan. 3. On architectural sheet A-1, please be more specific as to the roof shingle selection. "Architectural Grade" needs to be further defined. Do you mean a "40-year" roof? 4. Since the south elevations of Buildings Four and Seven directly face Rock Creek Drive, please raise the height of the synthetic stone to at least the top of the first floor windows or to a height to match the street elevations of Buildings Five and Six. 5. For the entrances facing Rock Creek Drive, there was preliminary discussion about providing decorative, wrought -iron (or equivalent) fencing, three to four feet in height, to create a level of detail to enhance the pedestrian scale of the project. Such fencing is not illustrated on the plans. What is the status? 6. On the Lighting Plan, note that several pole locations will interfere with tree locations. Please coordinate the Landscape Plan with the Lighting Plan. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. / --2� Ted Shepard Chief Planner Page 4 19 [8/17/09] Per the ODP for this area, the drainage entering the site from Cambridge Avenue needs to be detained for the 100-year storm and be treated for water quality. Number: 28 Created: 8/17/2009 [8/17/09) In general, off -site flows need to be passed through the site over the pond spillway, not through the orifice. This is not an issue anymore since the off -site flows will now be detained. Number: 29 Created: 8/17/2009 [8/17/09] Per the Harmony Tech Park 2nd Filing revisions titled, Cambridge Avenue and Harmony Road, all on -site drainage facilities will be maintained by the Property Owner. This will include the storm sewer conveying the flows from Cambridge Avenue. Number: 30 Created: 8/17/2009 [8/17/09] Please provide documentation in the drainage report that the southern half of Precision Avenue along this site's frontage is being detained per the ODP. Number: 31 Created: 8/17/2009 [8/17/09] Please explain in the text of the report how the master plan changes related to sub -basin redirection and detention pond size will affect the property owners and that all parties are in agreement. Number: 32 Created: 8/17/2009 (8/17/09] A drainage easement is required for the limits of the detention pond. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 8 Created: 8/10/2009 [8/10/09] Show curb stops on water services. Curb stops must be within 2 feet of meter pits and must be in a utility easement. Number: 9 Created: 8/10/2009 [8/10/09] Are irrigation taps planned for the project? Number: 10 Created: 8/10/2009 [8/10/09] See redlined plans for additional comments. Department: Zoning Issue Contact: Jenny Nuckols Topic: zoning Number: 2 Created: 8/6/2009 [8/6/09] Site plan - please note building envelopes on the site plan. Number: 3 Created: 8/6/2009 [8/6/09] Parking standards —see 3.2.2(K)(1)(a). See asterisked note regarding detached residential garages and be sure this site complies. Number: 4 Created: 8/6/2009 [8/6/09] Landscape plan — At the time of Final, we will need plant quantities listed on tables and plant types on the landscape plan. Page 3 Y Department: Light & Power Topic: Electric Utility Number: 1 [7/24/09] No comments. Issue Contact: Doug Martine Created: 7/24/2009 Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 25 Created: 8/13/2009 On Building 3, the fire line label got covered up by a layer. Regarding addressing, let's get together with Tim Varrone from GIS and discuss options; we have some time and it's not going to be a big issue. This was a great submittal. Thank you. Department: Transportation Planning Issue Contact: Matt Wempe Topic: General Number: 7 Created: 8/7/2009 [8/7/09] Please see the site plan redlines (already picked up by Nick Haws) for bike parking and sidewalk issues. Department: Technical Services Issue Contact: Jeff County Topic: Landscape Number: 20 Created: 8/12/2009 [8/12/09] The landscape plans have line over test(scanning) issues. See redlines. Topic: Lighting Plan Number: 24 Created: 8/13/2009 [8/13/09] The photometric plan has text over text issues. See redlines. Topic: Plat Number: 15 Created: 8/12/2009 [8/12/09] The boundary & legal both close. Number: 16 Created: 8/12/2009 [8/12/09] One distance does not match between the legal & plat. See redlines. Number: 17 Created: 8/12/2009 [8/12/09] The EA,A,D&U Easement can't be easily located using the existing dimensions. Please add the "redlined" distances to the plat. Number: 18 Created: 8/12/2009 [8/12/09] The plat has several scanning issues. See redlines. Number: 19 Created: 8/12/2009 [8/12/09] Please change the plat name to "Presidio Apartments". Number: 21 Created: 8/12/2009 [8/12/09] The EA,A,D&U Easement hatch/text will not scan. See redlines. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 27 Created: 8/17/2009 Page 2 l MR STAFF PROJECT REVIEW City of Fort Collins KEPHART Date: 8/17/2009 2555 WALNUT ST DENVER,CO 80205 Staff has reviewed your submittal for APARTMENTS AT PRESIDIO - PDP TYPE II, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Dana Leavitt Topic: Landscape Plan Number: 11 Created: 8/11/2009 [8/11/09] Add plant material within the detention pond to reduce the visual impact of looking like a bomb crater. Department: Engineering Issue Contact: Andrew Carney Topic: General Number: 12 Created: 8/11/2009 [8/11/09] The Precision Drive road improvements are not considered 'off -site" per our code and in the Development Agreement and therefore should be included in the Utility Plan set for the Apartments at Presidio. If it is desired to have the road improvements for Cinquefoil and Precision in a different set you will need a single master cover sheet for both the Utility Plan set and the Road improvement set. Also, the design for Cinquefoil should be included in the road improvement set as reverence. Lastly, please clearly identify, reference, and tie into the existing design for Cinquefoil so that there is no confusion about the design. Number: 13 Created: 8/11/2009 [8/11/09] Please clearly label what will be built along Precision and Cinquefoil. It is a bit unclear where the limits of construction will be and what is being built at this time. Number: 14 Created: 8/11/2009 [8/11/09] Since the road improvements along Precision and Cinquefoil are not considered "off -site" please adjust your limits of construction on the utility plan set to include the road improvements on both Cinquefoil and Precision. Even if you desire a separate plan set for the road improvements the utility sheet needs to show the road improvements and may simply reverence the road improvement set for details. Number: 22 Created: 8/11/2009 [8/11/09] Please show the.Utility Easements on the typical street cross sections as well as the travel lane widths, bike lane widths, and any parking widths. Number: 23 Created: 8/12/2009 [8/12/09] Please use a lighter or ghosted line weight for the existing conditions on and surrounding the site. It is a bit confusing what is being proposed and what is existing. Number: 26 Created: 8/14/2009 [8/14/09] Please see redlines for additional minor comments. Page 1