HomeMy WebLinkAboutCASEY'S CAR WASH, MAJOR AMENDMENT - FDP - 23-09/A - CORRESPONDENCE - (6)become an Assembly Occupancy (50 or more occupants) without additional requirements
becoming applicable..
OCCUPANT LOAD: The maximum occupancy of the cafe and associated outdoor seating
area will need to be determined. Occupant load will determine Type of Occupancy (<50 is
Business Occupancy, > or = 50 is Assembly), which also may influence other fire
requirements, such as exiting and/or automatic fire sprinklers.
Department: Transportation Planning Issue Contact: Matt Wempe
Topic: General
Number: 62 Created: 10/29/2009
[10/29/09) It was my understanding that the impact of the right-of-way needed for the
Mason BRT incorrectly shown in the Minor Amendment (due to City staff error) was going to
be addressed on this plan. Is this no longer the case? It is not required but recommended.
Department: Technical Services Issue Contact: Jeff County
Topic: General
Number: 60 Created: 10/28/2009
[10/28/09] All other plans look good.
Topic: Landscape Plan
Number: 59 Created: 10/28/2009
[10/28/09] The Landscape Plan "L-V has line over text issues.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 35 Created: 6/26/2009
[10/27/09] No comments.
[6/26/09] No comments.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterMastewater
Number: 56 Created: 10/27/2009
[10/27/09] The water service shown at the southeast corner of the cafe/self-serve carwash
building replaces the service on the north side of the self -serve carwash building where the
water main is being abandoned. The existing service on the north side of the building is a 1-
inch service. The label on the service to the southeast of the building should be changed to
a 1-inch service to coincide with the size of the existing service which is being abandoned.
Be sure and return all red -lined plans if you make a paper copy re -submittal prior to
submitting mylars.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at 221-6341.
Yokiss Truly,
Atea Olt
City Planner
Page 1
;. .
Topic: Landscape Plan
Number: 52 Created: 10/8/2009
[10/8/09] Repeat from the last round of red -lines - please dimension the height of the wall in
the patio area.
Topic: Site and Landscape Plan
Number: 30 Created: 6/24/2009
[10/8/09] [7/30/09] Scanning issues still exist. This does not have to be addressed prior to
hearing but must be addressed prior to final plan approval in Final Compliance.
(6/24/09] See Appendix E6 for scanning requirements and see Tech Services if you have
any questions. Please correct all line over text issues.
Number: 31 Created: 6/24/2009
[10/8/09] Sheet L2 refers to Sheet S1 for the handrail detail but there are no details shown
on S1.
[7/30/09] Please show the detail on the Site/Landscape Plans for the building department.
It is great that you've included it on the civil sets but it needs to be shown here as well.
Thank you.
[6/24/09] A hand rail is proposed but there is no detail or information on any of the plan
sets.
Number: 32 Created: 6/24/2009
[10/8/09] Repeat.
[8/3/09] [6/24/09] Please dimension and show all row and easements and label them as
existing or proposed to match the utility plan.
Number: 51 Created: 10/8/2009
[10/8/09] Scanning issues still exist. Please see technical services ASAP and before
running mylars.
Topic: Utility Plan
Number: 57 Created: 10/28/2009
(10/28/09] Ready for mylars and great job on addressing the remaining items so quickly!!
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 55 Created: 10/15/2009
[10/15/09] Utility records indicate the existing electric service is 600 amps at 120/208 volt 3
phase. If new or additional power is required, please contact Light & Power Engineering at
221-6700 to coordinate and determine utility costs.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 36 Created: 6/26/2009
[10/28/09] At this point, your occupant load is not high enough to require automatic fire
sprinklers, but I recommend you discuss egress requirements with Russ prior to submittal.
[8/5/09] 1 recommend that you meet with Russ Hovland from the FC Building Department to
determine if your cafe and patio areas meet egress requirements to get patrons to the public
way. From the submitted plans, it is difficult to determine the patio area and occupancy.
Please be aware that the occupancy for the cafe and patio areas will not be allowed to
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
MICHAEL CHALONA Date: 11/2/2009
LAND IMAGES, INC.
1136 E. STUART ST, STE 2040
FORT COLLINS, CO 80525
Staff has reviewed your submittal for Casey's Car Wash, Major Amendment - Final Plans,
and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Dana Leavitt
Topic: General
Number: 61 Created: 10/28/2009
[10/28/09] No comments.
Department: Current Planning Issue Contact: Steve Olt
Topic: Site Plan
Number: 64 Created: '11 /2/2009
[11/2/09] Need the Owner's Certification, Notary Public, and Director of Planning Approval
signature blocks on Sheet S1 of 2. See example being provided.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 26 Created: 6/24/2009
[10/8/09] The vacation request was approved and the corrected legals are perfect! I will
send you an email with the total County filing fees due to close this out.
[7/30/09] Thank you for submitting the legal description and exhibit however I still need the
vacation request. The vacation request must be reviewed and approved by the utilities prior
to going to hearing so please send this ASAP. If you could send it and the corrected legal
and exhibit per comment 46 electronically as well, I can route the request by email. This will
save about a week's time over using snail mail. Thank you.
[6/24/09] All proposed easements must have a legal description and an exhibit submitted
for our review and approval along with the associated TDRFee. All easements to be
vacated must submit a vacation request with an exhibit for our distribution to the various
utility agencies for their review and approval. There is an additional TDRFee for that as well.
Number: 44 Created: 8/4/2009
[10/8/09] Repeat. The Site and Landscape Plans still do not show and label all of the
existing and vacated easements on and off site that the utility plans show.
[8/4/09] The Site and Landscape Plans need to show the same easements (dimensioned
and labeled) and the utility plans. Need to show the proposed area of vacation by separate
document as well.
Number: 58 Created: 10/28/2009
[10/28/09] There are no public improvements proposed with this development nor any
street cuts so a Development Agreement is not required if Stormwater agrees to a Memo of
Understanding in its place.