Loading...
HomeMy WebLinkAboutCASEY'S CAR WASH, MAJOR AMENDMENT - FDP - 23-09/A - CORRESPONDENCE - (5)If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Steve Olt City Planner cc: Susan Joy Mowery Development JR Engineering Planning file #23-09A Page 4 [8/5/09] I recommend that you meet with Russ Hovland from the FC Building Department to determine if your cafe and patio areas meet egress requirements to get patrons to the public way. From the submitted plans, it is difficult to determine the patio area and occupancy. Please be aware that the occupancy for the cafe and patio areas will not be allowed to become an Assembly Occupancy (50 or more occupants) without additional requirements becoming applicable. OCCUPANT LOAD: The maximum occupancy of the cafe and associated outdoor seating area will need to be determined. Occupant load will determine Type of Occupancy (<50 is Business Occupancy, > or = 50 is Assembly), which also may influence other fire requirements, such as exiting and/or automatic fire sprinklers. Department: Transportation Planning Issue Contact: Matt Wempe Topic: General Number: 62 Created: 10/29/2009 [ 10/29/09] It was my understanding that the impact of the right-of-way needed for the Mason BRT incorrectly shown in the minor amendment (due to City staff error) was going to be addressed on this plan. Is this no longer the case? It is not required by recommended. Department: Technical Services Issue Contact: Jeff County Topic: General Number: 60 Created: 10/28/2009 [10/28/09] All other plans look good. Topic: Landscape Plan Number: 59 Created: 10/28/2009 [10/28/09] The landscape plan "L-1" has line over text issues. Department: Stormwater-Water-Wastewater Topic: Stormwater Number: 35 [10/27/09] No comments. [6/26/09] No comments. Issue Contact: Wes Lamarque 16=w_ S`IVIVTOOYAGOU Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 56 Created: 10/27/2009 [10/27/09] The water service shown at the southeast corner of the cafd/self-serve carwash building replaces the service on the north side of the self -serve carwash building where the water main is being abandoned. The existing service on the north side of the building is a f- inch service. The label on the service to the southeast of the building should be changed to a 1-inch service to coincide with the size of the existing service which is being abandoned. Be sure and return all red -lined plans if/when you re -submit. Page 3 Topic: Landscape Plan Number: 52 Created: 10/8/2009 [10/8/09] Repeat from the last round of redlines -please dimension the height of the wall in the patio area. Topic: Site and Landscape Plan Number: 30 Created: 6/24/2009 [10/8/09] [7/30/09] Scanning issues still exist. This does not have to be addressed prior to hearing but must be addressed prior to final plan approval in Final Compliance. [6/24/09] See Appendix E6 for scanning requirements and see Tech Services if you have any questions. Please correct all line over text issues. Number: 31 Created: 6/24/2009 [10/8/09] Sheet L2 refers to Sheet S1 for the handrail detail but there are no details shown on S1. [7/30/09] Please show the detail on the site/landscape plans for the building department. It is great that you've included it on the civil sets but it needs to be shown here as well. Thank you. [6/24/09] A hand rail is proposed but there is no detail or information on any of the plan sets. Number: 32 Created: 6/24/2009 [10/8/09] Repeat. [8/3/09] [6/24/09] Please dimension and show all row and easements and label them as existing or proposed to match the utility plan. Number: 51 Created: 10/8/2009 [10/8/09] Scanning issues still exist. Please see technical services ASAP and before running mylars. Topic: Utililty Plan Number: 57 Created: 10/28/2009 [10/28/09] Ready for mylars and great job on addressing the remaining items so quickly!! Department: Light & Power Issue Contact: Doug Martine Topic: Electric Utility Number: 55 Created: 10/15/2009 [10/15/09] Utility records indicate the existing electric service is 600 amps at 120/208 volt 3 phase. If new or additional power is required, please contact Light & Power Engineering at 221-6700 to coordinate and determine utility costs. Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 36 Created: 6/26/2009 [10/28/09] At this point, your occupant load is not high enough to require automatic fire sprinklers, but I recommend you discuss egress requirements with Russ prior to submittal. Page 2 a��STAFF PROJECT REVIEW ON of Fort Collins MICHAEL CHALONA Date: 10/30/2009 LAND IMAGES, INC. 1136 E. STUART ST, STE 2040 FORT COLLINS, CO 80525 Staff has reviewed your submittal for Casey's Car Wash, Major Amendment — Final Plans, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Dana Leavitt Topic: General Number: 61 Created: 10/28/2009 [10/28/09] No comments. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 26 Created: 6/24/2009 [10/8/09] The vacation request was approved and the corrected legals are perfect! I will send you an email with the total County filing fees due to close this out. [7/30/09] Thank you for submitting the legal description and exhibit however I still need the vacation request. The vacation request must be reviewed and approved by the utilities prior to going to hearing so please send this ASAP. If you could send it and the corrected legal and exhibit per comment 46 electronically as well, I can route the request by email. This will save about a week's time over using snail mail. Thank you. [6/24/09] All proposed easements must have a legal description and an exhibit submitted for our review and approval along with the associated TDRFee. All easements to be vacated must submit a vacation request with an exhibit for our distribution to the various utility agencies for their review and approval. There is an additional TDRFee for that as well. Number: 44 Created: 8/4/2009 [10/8/09] Repeat. The Site and Landscape plans still do not show and label all of the existing and vacated easements on and off site that the utility plans show. [8/4/09] The site and landscape plans need to show the same easements (dimensioned and labeled) and the utility plans. Need to show the proposed area of vacation by separate document as well. Number: 58 Created: 10/28/2009 [10/28/09] There are no public improvements proposed with this development nor any street cuts so a Development Agreement is not required if Stormwater agrees to a Memo of Understanding in its place. Page 1 Page 1 of 1 Michael, Attached are the comments as received today. Red -lines and hard -copy of the letter will be ready Monday. Steve >>> "Michael Chalona" <michael@landimagesinc.com> 10/30/2009 12:07 PM >>> Susan & Steve, I have attached a set of review dwgs as requested. Please let me know any comments ASAP. Thank you and have a great day, Michael Chalona, RLA (CO, GA, WY) LEED Accredited Professional www.landimagesinc.com michael@landimagesinc.com 1136 E. Stuart Street, Building 2, Suite 2040 Fort Collins, CO. 80525 970-472-8954 ph. 970-472-8955 fax The information transmitted herein, including attachments, is covered under the Electronic ommunicatiq 'vary Act 18 U.S.C. 2510-2521, and is intended only for the person(s) or entiryientities to which this communication is addressed and may cunt 'leged. or proprietary material. Any review, retransmission, dissemination or any other use of, or taking any action in reliance upon, anon rsons or entities other than the intended recipients is strictly prohibited. If you have received this message in error and are an unintended recipient, please contact the sender and delete the message and any attached material immediately from any and all computers of the unintended recipient. file://C:\Documents and Settings\solt\Local Settings\Temp\GW}00002.HTM 11/2/2009