HomeMy WebLinkAboutCROSSROADS SAFEHOUSE - PDP - 18-09 - CORRESPONDENCE - (6)ort Collins Planning. Development & Transportation Services
Neighborhood & Building Services
2008 Commercial / Multi -family Codes & Standards
Updated 10-28-2008
All construction within the City of Fort Collins shall comply with following adopted codes
2006 International Building Code with local Amendments
2006 International Energy Conservation Code & ASHRAE standard 90.1-2007 (see below)
2003 International Mechanical Code w/Amendments
2003 International Fuel Gas Code w/Amendments
2006 International Plumbing Code
2008 National Electrical Code
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2003
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF
Frost Depth 30 inches
Wind Load: 100- MPH 3 Second Gust Exposure B
Seismic Design Category B
Energy Code Compliance:
Commercial (Including multi -family residential bldgs 4 stories and taller):
Adopted code: ASHRAE standard 90.1-2007 and 2006 IECC sections 502.2.4 and
502.2.6. Climate Zone 5.
Per local amendment, slab on grade and below grade walls require insulation of R-7.5, 24"
deep min. required.
3 ways to comply:
1. Prescriptive.
2. Total UA alternative (COMcheck) calculated using the most current version.
3. SPA (Performance rating). Current approved programs are HERS and E-star.
Multi -family Residential (Apartments & Condos 3stories and less):
Adopted code: 2006 IECC (chapter 4) w/local amendments, climate Zone 5.
Must also comply with IECC section 505 for lighting.
Per local amendment, slab on grade and below grade walls require insulation regardless of
compliance method. See IECC section 402.2.
3 ways to comply:
1. Prescriptive, section 402.2.
2. Total UA alternative (REScheck). REScheck must be calculated using 2006 IECC.
3. SPA (Performance rating). Current approved programs are HERS and E-star.
All Projects except Single Family and Tenant Finishes require a
Pre -submittal Code Review Meeting with the Fort Collins Building Department.
For questions or to schedule this meeting call Plan Review at 416-2341.
281 North College Avenue — P.O. Box 580 — Fort Collins, CO 80522-0580
Building—(970) 416-2740; FAX (970) 224-6134 Neighborhood-(970)224-6046; FAX (970) 224-6050
To Whom It May Concern:
With 75 possible residents the United States Postal Service would like an interior room
for the residents to access their mail in the security of the Safe House. An exterior
Access door for the Carrier's delivery without contact with the residents. Designated
Parking for the Carrier.
Thanks
Dan Klinzmann
USPS Growth Coordinator
Fort Collins, CO
970-566-2257
Number: 8 Created: 4/27/2009
[4/27/09] The walk-in cooler needs to be screened.
Number: 9 Created: 4/27/2009
[4/27/09] Need to show parking stall dimensions of what I assume are parallel spaces along
south lot line. They need to be minimum of 8' x 23'. Show dimensions of drive -aisle widths
(24' required at 90 degree stall, 20' at parallel stalls, and 24' behind the 2 stalls next to the
southwest corner of the building).
Page 2
4 1� Project Comments Sheet
City of Fort Collins Selected Departments
Department: Zoning
Date: April 27, 2009
Project: Crossroads Safehouse PDP Type II
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
May 06, 2009
Note - Please identify your redlines for future reference
Issue Contact: Peter Barnes
Topic: zoning
Number: 3 Created: 4/27/2009
[4/27/09] The "New Zoning" in the Land Use Breakdown on the cover sheet needs to be
changed to "New Use" and reflect the actual use, which is "Shelter for victims of domestic
violence".
The term "Existing Zoning" in the Land Use Breakdown needs to be changed to "Existing
Use".
Number: 4 Created: 4/27/2009
[4/27/09] The change of use requires the gravel parking lot to be brought into compliance
with 3.2.2 and 3.2.1 of the LUC. This means it will have to be hard surfaced, interior parking
lot landscaping, permiter parking lot landscape (1 tree every 40'), etc.
Number: 5 Created: 4/27/2009
[4/27/09] The site plan indicates that the Parker St. sidewalk doesn't go the entire length of
the lot along Parker. If the walk needs to be extended, then the trash enclosure has to be at
least 20' from the walk. Even if the walk isn't extended, the enclosure must be at least 20,
from the street. (3.5.1(1)(1) of Land Use Code).
Number: 6 Created: 4/27/2009
[4/27/09] The General Site Notes on the site plan state that the zoning is D. That needs to
be changed to LMN.
Number: 7 Created: 4/27/2009
[4/27/09] Site plan needs to include information on the new picket fence at the permiter.
The fence abutting the parking lot and drive must be a 6' tall privacy fence. Please indicate
height anA material.
Signature
y•,� -?-C)9
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility = Landscape
Page 1
City of
Fort Collins
Current
Planning
PO Box 580 ' Fort Collins, CO 80522
970.221.6750 ' 970.224.6134 - fax
DATE: April 17, 2009
TO: Comcast
PROJECT
COMMENT
PROJECT PLANNER: Ted Shepard
SHEET
# 18-09 Crossroads Safehouse PDP Type II
Please return all comments to the project planner no later than
the staff review meeting:
May 6, 2009
Note - Please identify your redlines for future
reference
❑ No Problems
Problems or Concerns (see below, attached, or
DMS)
Please contact Reneta Santoro @419-3106 for an access agreement. Please prewire all
units back to a data room, and stub a 2" conduit from the data room out toward Parker &
Whedbee St. intersection any questions please Don @ 567-0245 Thanks.
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
Utility _Redline Utility .Landscape
City of
F6rt Collins
Current
!
Planning
PO Box 580 * Fort Collins, CO 80522
970.221.6750 ' 970.224.6134 - fax
DATE: April 17, 2009
TO: Trans. Planning
PROJECT PLANNER: Ted Shepard
. MW
441
# 18-09 Crossroads Safehouse PDP Type 11
Please return all comments to the project planner no later than
the staff review meeting:
May 6, 2009
Note - Please identify your redlines for future
reference
F-] No Problems
Problems or Concerns (see below, attached, or
DMS) F_� 1) 0 1( -jO t J L)
(please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
—Plat Site
—Drainage Report —Other
Utility —Redline Utility —Landscape
4. Please check with the Building Inspection Department regarding the new six foot
brick fence with the two -foot metal extension. This may be considered an eight foot
fence in which case a separate building permit would be needed.
5. The project will be reviewed by the criteria of Section 3.8.6(D). Please inform us if
you are aware of any other group home or shelter within 1,500 feet of the proposed
facility. If there is such a facility within 1,500 feet, then a Modification of Standard
would be required.
6. Will there be any additional exterior security lighting? If so, please describe the
location, type of fixtures, wattage and other details. Lighting will be reviewed for
providing safety on the property but without any light spillage onto adjoining
properties.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at 221-6750.
Sincerely -
Ted Shepard
Chief Planner
Page >
The term "Existing Zoning" in the Land Use Breakdown needs to be changed to "Existing
Use".
Number: 4 Created: 4/27/2009
[4/27/09] The change of use requires the gravel parking lot to be brought into compliance
with 3.2.2 and 3.2.1 of the LUC. This means it will have to be hard surfaced, interior parking
lot landscaping, perimeter parking lot landscape (1 tree every 40'), etc.
Number: 5 Created: 4/27/2009
[4/27/09] The site plan indicates that the Parker St. sidewalk doesn't go the entire length of
the lot along Parker. If the walk needs to be extended, then the trash enclosure has to be at
least 20' from the walk. Even if the walk isn't extended, the enclosure must be at least 20,
from the street. (3.5.1(1)(1) of Land Use Code).
Number: 6 Created: 4/27/2009
[4/27/091 The General Site Notes on the site plan state that the zoning is D. That needs to
be changed to LMN.
Number: 7 Created: 4/27/2009
[4/27/09] Site plan needs to include information on the new picket fence at the perimeter.
The fence abutting the parking lot and drive must be a 6' tall privacy fence. Please indicate
height and material.
Number: 8 Created: 4/27/2009
[4/27/09] The walk-in cooler needs to be screened.
Number: 9 Created: 4/27/2009
[4/27/09] Need to show parking stall dimensions of what I assume are parallel spaces along
south lot line. They need to be a minimum of 8' x 23'. Show dimensions of drive -aisle
widths (24' required at 90 degree stall, 20' at parallel stalls, and 24' behind the 2 stalls next
to the southwest corner of the building).
Comments from Current Planning
1. The continued use of the gravel parking lot will require a Modification of Standard to
Section 3.2.2(D)(3)(c). Please refer to Section 2.8.2(H) on the criteria by which a
Modification may be reviewed. Is it possible to demonstrate that there will be less
parking at this facility than the previous use? Do clients bring cars to store on the
property during their time at the facility? If so, are these cars used on a daily basis
or would you consider these cars to be temporarily stored on the property? These
factors may be important in considering the Modification.
2. Engineering's comments regarding not completing the sidewalk to the west
property line along Parker Street are clear. But, does the same apply to not
completing the sidewalk to the south property line along Whedbee Street?
3. For cars exiting onto Whedbee Street, is seven feet wide enough for larger vehicles
such as trucks and S.U.V.'s?
Paee 4
protection equipment and equipment location, shall be constructed of durable materials,
permanently installed and readily visible. 2006 International Fire Code 510.1
Number: 23 Created: 5/8/2009
REQUIRED ACCESS: Fire access roads (fire lanes) shall be provided for every facility,
building or portion of a building hereafter constructed within the PFA's
jurisdiction when any portion of the facility or any portion of an exterior wall of the first story
of the building is located more than 150 feet from fire apparatus access as measured by an
approved route around the exterior of the building or facility. This fire lane shall be visible by
painting and signage, and maintained unobstructed at all times. A fire lane plan shall be
submitted for approval prior to installation. In addition to the design criteria already
contained in relevant standards and policies, any new fire lane must meet the following
general requirements:
F Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of
supporting fire apparatus weights. Compacted road base shall be used only for temporary
fire lanes or at construction sites.
7 Have appropriate maintenance agreements that are legally binding and enforceable.
F Be designated on the plat as an Emergency Access Easement.
Maintain the required minimum width of 20 feet throughout the length of the fire lane
(30 feet on at least one long side of the building when the structures is three or more stories
in height).
If the building is equipped throughout with an approved automatic fire -sprinkler system, the
fire code official is authorized to increase the dimension of 150 feet.
2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D
Number: 24 Created: 5/8/2009
ADDRESS NUMERALS: Address numerals shall be visible from the street fronting the
property, and posted with a minimum six-inch high numerals on a contrasting background.
(Bronze numerals on brown brick are not acceptable). 2006 International Fire Code 505.1
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 10 Created: 5/5/2009
[5/5/09] The Stormwater requirements will depend on the outcome of the modification of
standard to not pave the parking lot. If the parking lot were to be paved, quantity detention
would absolutely be required. Parking lot detention up to one foot in depth is allowed.
Number: 11 Created: 5/5/2009
[5/5/09] If the widening of the sidewalk is not to be constructed now, than quantity detention
would not be required. If the sidewalk is to be widened with this project, quantity detention
may be required. A discussion would need to take place if detention could be provided
within reasonable terms.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 3 Created: 4/27/2009
[4/27/09] The "New Zoning" in the Land Use Breakdown on the cover sheet needs to be
changed to "New Use" and reflect the actual use, which is "Shelter for victims of domestic
violence".
Pne 3
Number: 17 Created: 5/8/2009
[5/8/09] Another round of review prior to hearing will be required if the modification to allow
the existing gravel parking is not approved. If it IS approved, I can get by with an informal
round of review if no other department is requiring a formal round.
Number: 18 Created: 5/8/2009
[5/8/09] From Technical Services: Please add a legal description to the site plan.
Number: 19 Created: 5/8/2009
[5/8/09] There were two variance requests submitted to Engineering - one for stormwater
requirements and the other to allow for gravel parking. Unfortunately, engineering does not
have the ability to approve either one of them. Please see Wes Lamarque in Stormwater
and Peter Barnes in Building and Zoning respectively.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 1 Created: 4/23/2009
[4/23/09] Assuming that no changes are required to the existing electric utility system OR
the electric service to the building, there will be no charges from Light & Power. If changes
are required, please contact Light & Power Engineering at (970)221-6700.
Number: 2 Created: 4/23/2009
[4/23/09] If the planned P.V. canopies will be capable of feeding power into the electric grid,
please contact Norm Weaver at (970)416-2312 for the required application and permit
procedure.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 20 Created: 5/8/2009
ACCESS/MEANS OF EGRESS: Please contact me so we can coordinate your need for
security, with emergency services' need for access. We can certainly make the two needs
co -exist. Also, I need to know how exiting occurs through the courtyard. Is there an exit from
the courtyard, directly to the exterior of the building? There does not appear to be on the site
plan, but the actual building does appear to have direct access. Please contact me to
discuss.
Number: 21 Created: 5/8/2009
FIRE SUPPRESSION SYSTEM(S): The fire -sprinkler system must have been inspected
within the past six months. Also, is there a commercial kitchen with a hood/duct
extinguishing system? Fire -suppression systems must meet current requirements of the
2006 IFC.
Number: 22 Created: 5/8/2009
FIRE DEPARTMENT ACCESS TO EQUIPMENT: Fire protection equipment shall be
identified in an approved manner. Rooms containing controls for air-conditioning systems,
sprinkler risers and valves, or other fire detection, suppression or control elements, shall be
identified for the use of the fire department. Approved signs required to identify fire
PLig," I
A
�„ STAFF PROJECT REVIEW
C'h, of Fort Collins
Date: 5/12/2009
Staff has reviewed your submittal for Crossroads Safehouse PDP Type II, and we offer the
following comments:
ISSUES:
Department: Current Planning Issue Contact: Dana Leavitt
Topic: General
Number: 15 Created: 5/6/2009
[5/6/09] As you work through the renovation of the interior, consider the various programs
and services for green building offered through the Utilities Department. The following link
will provide you with information on specific programs:
hftp://www.fcgov.com/greenbuilding/home/existing_programs.php.
Also, Doug Swartz (221-6719) is a good contact person to talk to regarding energy
efficiency solutions.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 12 Created: 5/6/2009
[5/6/09] Please see Appendix E4 for the required items that must be shown on the plan sets
prior to going to hearing (they are highlighted in yellow; the rest of the checklist is due in
Final Compliance). We are mostly concerned with showing and labeling the existing row,
easements, existing features (sidewalks, driveways, etc) along the street frontages. We can
talk a little more after the meeting this morning ok? :)
Number: 13 Created: 5/6/2009
[5/6/09] Please coordinate your sidewalk requirements with Matt Wempe in Transportation
Planning and myself just so I know what needs to be shown on the plans. It may be
necessary to dedicate either additional row or an access easement to the back of the
sidewalk depending on where the existing row falls.
Number: 14 Created: 5/6/2009
[5/6/09] This development is responsible for constructing the sidewalk where none currently
exists on this property, however, it was determined that in this case, it really wouldn't benefit
the neighborhood by constructing it at this time. It has been agreed that this development
will provide cash in lieu of the additional sidewalk to the west. An estimate for our review
and approval is due in Final Compliance and that amount will be added to the development
agreement and due prior to the issuance of the building permit.
Number: 16 Created: 5/8/2009
[5/8/09] It was determined that the existing 1' widening of the sidewalk along Parker would
be removed and a 4' extension would be put in its place. The sidewalk would then taper to
match the existing width at the corner and no widening of the existing sidewalk along
Whedbee would be required. The existing timber retaining wall will be removed as well as
the concrete wall extending into the row along the south side of the driveway. In addition, a
minimum of 25' of the driveway from the r.o.w. will be paved or put in concrete to minimize
drag -out over the sidewalk and street.
Page 1