Loading...
HomeMy WebLinkAboutCROSSROADS SAFEHOUSE - PDP - 18-09 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTsite to Whedbee, essentially as it has done in the past. Given the pervious nature of the surface, most of the runoff will infiltrate the gravel surface, as it does today. Some new concrete sidewalks have been added to the site, but we have kept these to a minimum. We have added approximately 1,117 additional square footage of impervious area to the site, included all the new sidewalks and the concrete trickle pan. Second, we understand from the Concept review comments, that we are required to widen the existing sidewalk adjacent to Whedbee and Parker by an additional 3'. We are proposing adding 4' of additional sidewalk. This adds approximately 1,836 additional square footage of impervious area, but we feel that since this is located in the existing Right -of -Way, this should not be included in the total square footage of new impervious area allowed for the site. There are currently no sidewalks on any adjacent property, and in all likelihood, we will request that the client be allowed to escrow the funds for these improvements (the 3' of additional walk), therefore no increase would be seen until extensive improvements happen in this area down the road. Therefore, we feel that we are close to the allowed additional square footage requirements of 1,000 square feet, and feel justified that this site will meet the _ requirements of the stormwater utility department, and do not need a full drainage study. Thanks for your consideration of this project. Please call if you have any questions. 273:2 Roger A Curtiss, P Project Manager N . NORTHERN ENGINEERING April 15, 2009 Mr. Glen Schluetter City of Fort Collins Stormwater Utilities 700 Wood Street Fort Collins, Colorado 80524 ADDRESS; PHONE 970.221.4158 IM 200 S. College Ave. Suite 100 WEBS Fort Collins, CO 80524 FAX: 970.221.4159 Northern Engineering.com RE: Crossroads Safehouse — Whedbee and Parker Streets Letter Regarding Stormwater runoff Glen, This letter is regards to the Crossroads Safehouse project, located at the southwest comer of Parker Street, and Whedbee Street in Fort Collins, Colorado, and in particular to the stormwater runoff from the site. In essence, the client is modifying the existing building to provide shelter to victims of abuse. They are adding virtually no additional square footage to the footprint of the structure, but they are changing the use of the building. Therefore, they are required by Code to bring the building into compliance. The project was presented to staff in concept review. We are submitting PDP for the project, and this letter is intended to be a part of that PDP submittal, and to provide you with a narrative of our approach to mitigating stormwater runoff from the site. First, the site is currently serviced by a paved (asphalt) parking lot on the west side of the building. Runoff from this. pavement is collected in a small grassed depression along the east side of this lot, and is conveyed by a 6" pipe to an existing storm sewer located in Parker Street. This existing asphalt parking lot does not completely cover the site, and does not extend around the south side of the building, but it is covered with a gravel driving surface. In the Concept review comment, it was noted that to bring the building up to compliance, we would need to pave the gravel portions of the parking lot. I will include with this submittal a variance request letter to allow the client to regrade and resurface this portion of the parking lot, but to use a pervious crushed gravel surface instead of an asphalt surface. This allows us to keep the additional impervious area added to the site around 1,000 square feet We are proposing adding a small 2' wide trickle pan down the middle of the gravel parking area, regarding the lot to drain towards that pan, and conveying runoff from the