Loading...
HomeMy WebLinkAboutBELLA VIRA - FDP - 36-05A/B - CORRESPONDENCE - UTILITY PLANS (3)May 24, 2007 EARTH ENGINEERING CONSULTANTS, INc. Mr. John Minatta 2037 Lexington Court Fort Collins, Colorado 80526 Ann: Mr. John Minatta RE: Bella Vira Box Extension Fort Collins, Colorado EEC Project No. 1062104 Mr. Minatta: This letter is.follow.up to conversations concerning support of the box culvert and separation between the underlying duct bank and the box culvert base. As discussed with Tom Hartmann, we anticipate stabilization to develop support under the box culvert with 12-inches of import rock resulting in less than 3/4 inches of settlement under the design bearing pressure of 1,000 psf. Providing a "void" between the top of the duct bank and base of the box culvert would not adversely affect performance of the culvert and the outlined subgrade support and settlement would be appropriate, regardless. The "void" should be developed with a compressible material to prevent infilling of that void with the subgrade materials. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the above information, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, Inc. Lester L. Litton, P.E. Principal Engineer LLUdla cc: Jonathan Sweet — Jim Sell Design, Inc.—,wohnminatta(@,comcast.net 4396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663.0282