Loading...
HomeMy WebLinkAboutBELLA VIRA - FDP - 36-05A/B - CORRESPONDENCE - LANDSCAPE PLAN•.r To: Steve Olt From: Tim Buchanan Re: Bella Vira PDP 1. The applicant needs to contact the City Forester for a meeting on site to determine if any existing trees to remove need to be mitigated. 2. Street Tree Changes • The four Douglas Hawthorns used as street trees along Overland Trail should be changed to Thornless Cockspur Hawthorn. • The English Oak should be specified as Skymaster English Oak Quercus robur `Skymaster'. This change should be made in the plant schedule on sheet L2 • Street Trees are labeled as CO but this symbol is not listed in the plant list. CO is usually used for Hackberry but needs to be noted. 3. Add these plant notes. • The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three )3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area. • A permit must be obtained from the City Forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. • The developer shall contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City Forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development. STAFF PROJECT REVIEW John Minatta 2037 Lexington Court Fort Collins, CO 80526 Re: Bella Vira - Final Plan review John, Date: 03 / 02 / 2007 Attached are comments received from Tim Buchanan, the City Forester, since my staff comment letter dated February 16, 2007. These comments came to my office sometime during my absence between February 16th and February 28t'. If you have -questions about his comments please call him at 221-6361. Just to reiterate what was said at the end of the previous letter, another round of staff review is determined to be necessary. This proposal is subject to the 90-day revision re -submittal requirement (from the date of the staff comment letter, being February 16, 2007) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all red -lined plans when you re -submit. If you have any questions regarding any issues related to this project, please feel free to call me at 221-6341. Yours Truly, ASteve Olt City Planner cc: Susan Joy Current Planning file #36-05A Page 1