HomeMy WebLinkAboutCASEY'S CAR WASH - MAJOR AMENDMENT - 23-09 - CORRESPONDENCE -Number 41:
Labeled on plans.
Number 44:
Received easements for Civil engineer and showing on plans.
Number 46:
Adjusted text on landscape plans.
Number 29:
Spelled out abbreviations.
Number 30:
Darkened background line work.
Number 31:
Detail shown on plans.
Number 32:
Dimensioned easements.
Number 33:
Labeled arbor as proposed.
Number 47 & 48: .
Mason Corridor issues where dealt with in the Second minor amendment.
Negotiations are on going with the City and the owner.
All required submittal items specified on the submittal check list have been included
in the submittal as required by the City. We look forward to working with the City on
the Final Compliance review of the project.
Thank You,
Michael Chalona, RLA
Principal
September 16, 2009
City of Fort Collins Review Staff
281 N. College Avenue
Fort Collins, CO 80524
Ref; Land Images, Inc Response to Staff Comments Dated 8-10-09
Dear Review Staff,
Land Images has compiled our response to staff comments and are replying in the
order listed on printed response provided to Land Images, inc.
Responses to Staff Comments
Number 24:
Client may pursue water savings evaluation later.
Number 7:
No new curb is being provided. The pervious and car pick up area was completed
with the first minor amendment and constructed over a year ago.
Number 11:
This area is outside the 'Limits of Development' (LOD) of the major amendment.
Number12:
There is no door.
Number 49:
Additional line work was added the survey base to show solid lines for much of the
existing curb and gutter, etc.
Number 50:
Engineers have updated their plans.
Number 39:
Parking spaces accommodate the 2' overhang.
Number 40:
The west side of the property is outside of the LOD for the major amendment.
1136 East Stuart Street, Suite 2040 Fort Collins, Co. 80525 ■ Phone: 970472-8954