Loading...
HomeMy WebLinkAboutCASEY'S CAR WASH - MAJOR AMENDMENT - 23-09 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTL �mi� OF �G�ISIU� ?fox, �r-----� Pr OPOL �sa 60 1 Acea I Ieu ► /g3.65 . . .. ... • ., L a G,nc�k� I A lo9,H�! I I rill Rce� 175 w o o r w Z HS cn Pcce k - z 13�,,1 ,may �� - 3►7,� �� �33.51 317 — — — — — — — — — — — — — — g� �, Pco�ed (�cx ce�e J ,�aS 1�c'ea � �� •`�9 Can c, = 3y�/' 3� 3623. �6 Prre( iz29.65 5 Z6 3o30 Ate- 970``�Z a N C_ M W � W 0 o � I L ry -------------- E ,cks-v ny 0 Krtic1 -n ---------------�-- i Rcec� = 15733.8 — — 31t 0f II 9 — va J o J 0 Y , ZO A `c,(�.5 ac2 1'n sk. t' - lab t r1 31,78 .` q 10 10 CoocceJte = 3-70.3 15733'$0 Existing Conditions Description Area ft2 Cvalue Building 3178.44 0.95 Concrete 3769.30 0.95 -- Asphalt 15733.80 0.95 Landscape 3621.65 0.15 Total = 26303.2 1 0.84 Proposed Conditions Description Area ftz Cvalue Building 3178.44 0.95 Concrete 3481.38 0.95 Asphalt 16019.72 0.95 Landscape 3623.66 0.15 Total = 1 26303.2 0.84 additions proposed. project. If you have (970) 491-9888. Sincerely, JR Engineering Prepared b Derek Patterson We greatly appreciate your time and consideration in reviewing this any questions or require additional information, please contact us at Reviewed Timothy J. Halopoff, P.E. Design Engineer Land Development Manager April 10, 2009 Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Casey's Carwash — Drainage Letter Dear Wes, We are pleased to submit for your review, this letter, which outlines the revised drainage design for the proposed addition to the Casey's Carwash site. This letter references the design originally approved by James H. Stewart and Associates, entitled "Troutman P.U.D. Phase Two" dated July 12, 1983 and the previous study by JR Engineering, entitled "Casey's Carwash-Drainage Letter" dated July 28, 2008. All computations in this report have been completed in compliance with the City of Fort Collins Storm Drainage Criteria, dated May 1984, revised April 1997. The revised layout of the site includes remodeling a few of the existing self -wash bays for use as a fast food restaurant. Additionally, the existing asphalt parking area along the north side of the proposed remodel will be modified into a landscaping and patio seating area for the Casey's Cafe. The parking configuration and pedestrian facilities will also be modified. In order to anticipate possible retrofit issues that might have impacted the design, JR Engineering met with a city Stormwater representative last year, and it is our understanding that the originally approved design will be grand fathered in as it exists today and has for more than 20 years, with the caveat that the runoff from the site cannot be increased. To this end, the design proposes to replace the former parking area located north of the Casey's Cafd with landscaping. Calculations included at the end of the report indicate that the replacement in these areas with more pervious materials serve to keep the runoff coefficient of the site to its existing condition. The criteria set forth in the city's manual was utilized to determine all necessary runoff coefficients for the revised site. The results were then averaged using typical area - weighted methods. The results, included at the back of the report, demonstrate that runoff from the site will remain as it exists today. Thus, the proposed additions will have no negative effects to the existing drainage conditions. In summary, the proposed design meets or exceeds the applicable criteria established by the manual as well as the requirements established previously by the city's Stormwater Department. Since the design serves to maintain the volume and peak runoff rate leaving the site, no negative impacts are anticipated downstream. Therefore, the design proposed in this letter and corresponding construction documents is assumed adequate to serve the