HomeMy WebLinkAboutAVAGO TECHNOLOGIES BLDG. 4 WEST EXPANSION - MJA/FDP - FDP130006 - CORRESPONDENCE - (8)Topic: Construction Drawings
Comment Number: 2 Comment Originated: 04/15/2013
06/04/2013. This has been addressed, but the spelling of "Ziegler" is incorrect. The description
of benchmark 7-01 does not match our description. What is benchmark #1, and how will
someone find the benchmarks?
Response: Spelling of Ziegler has been corrected. The Benchmark description has been revised.
04/15/2013: Please correct the elevations for the benchmarks shown on sheets C100, C101,
C200, C201, C202, C203, C204, C300, C500, C600, C700 & C701.
Response: This comment was addressed on the previous submittal.
Comment Number: 3 Comment Originated: 04/15/2013
06/04/2013: There are still line over text issues on sheets C500 & C701.
Response: These issues have been corrected.
04/15/2013: There are line over text issues on sheets C200, C201. C600 & C801.
Topic: Site Plan
Comment Number: 7 Comment Originated: 04/16/2013
06/04/2013: This has been addressed, but "Fort" needs to be spelled out.
04/16/2013: Please correct the legal description. This does not match the current legal
description shown on the Larimer County Assessor's webpage. We suggest that you check
with the Larimer County Clerk & Recorder's office for a current deed.
Response: These issues have been corrected.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/16/2013
04/16/2013: No comments.
Comment Number: 6 comment Originated: 06/04/2013
06/04/2013: The bus stop/connecting walk detail on sheet C701 shows curb and gutter along E
Harmony. Is this proposed with the bus stop installation?
It was discussed at the site meeting to incorporate a 6 inch curb at the back of the bus stop pad
that is not shown on the detail.
Please provide more information on the grade break behind the proposed walk down to the
irrigation ditch. Depending on the grade break additional curb behind the walk may be
needed.
Response: Plan C701 has been revised per direction from a site meeting held between the owner
representative and the City.
Topic: Site Plan
Comment Number: 7 Comment Originated: 06/04/2013
06/04/2013: Please include the bus stop and connecting sidewalk on the site plan
Response: This has been added.
Department: PFA
Contact: Jim Lynxwiler, 970.416-2869, ilynxwiler(a)poudre-fire.orq
Topic: General
Comment Number: 08 Comment Originated: 06/04/2013
06/04/2013: All prior comments from PFA have been satisfactorily resolved by representatives
of AVAGO. No further comments required.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue cDfcgov.com
Topic: General
Comment Number: 5 Comment Originated: 06/04/2013
06/04/2013. The detail for the underdrain needs to be discussed. Wrapping the fabric with a
Geo-membrane is not preferred.
Response: Per a phone call between Peter Buckley and Wes Lamarque it is acceptable to leave the
geofabric around the rock layer but the sock around the pipe has been deleted. The plans have been
revised accordingly.
Department: Technical Services
Contact: Jeff County, 970-221-6588, ]county(a)fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 04/15/2013
06/04/2013: No comments.
04/15/2013: No comments.
City of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224,6134 - fax
fcgov. corrVdeve lopmentreview
June 07, 2013
Angela Milewski e f f"/ NJE-S
BHA Design f I""
1603 Oakridge Dr. (Q�
Fort Collins, CO 80525
RE: Avago Technologies Building 4 West Expansion Major Amendment, FDP130006, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970-221-6343, tshepard(@,fcqov.com
Topic: General
Comment Number: 2
Comment Originated: 06/05/2013
06/05/2013: Be sure to add to the plans all the impact mitigation measures that were agreed to
between Avago and the property owners to the north post public hearing.
Response: Impact mitigation measures have been added to the Site Plan as notes and depictions
on the plan.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund(o)fcgov.com
Topic: General
Comment Number: 5
Comment Originated: 06/04/2013
06/04/2013: An excavation permit for the bus stop construction in the right-of-way will need to
be obtained prior to the start of installation. City acceptance of the bus pad and walk will be
required prior to Certificate of Occupancy. Please contact me for more information about the
permitting process.
Response: Noted.