HomeMy WebLinkAboutMELDRUM OFFICE BUILDING - PDP - PDP130027 - CORRESPONDENCE - REVISIONSWhere are the Meter locations?
Response: Meters have been located on the architectural elevations.
Comment Number: 2
Comment Originated: 09/04/2013
09/04/2013: Where is a floor Plan of the parking inside the building?
Response: The parking is located on the west half of the first floor. There are a total of six private parking
stalls.
Does it meet the required stall dimensions?
Response: The stalls are 9'-0" wide and 19'-0" deep with a 24'-0" drive aisle between the two.
Is there a Handicap van accessible space?
Response: No. Based on conversations with the building department, there is no requirement for a private
garage to have a handicap stall.
provided.
Response: An alternative compliance request was provided with this submittal. Indoor bike parking
exceeding the requirement is being provided.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 09/24/2013
09/24/2013: Show the existing 3/4" water service. If it is not being used, add notes pertaining
to abandonment at the main (i.e. coordination with FC Utilities, etc.).
Response: The approximate location of the existing 3/4" water service is now shown based on field locates of
the curb stop and main in Meldrum. The abandonment at the main will be coordinated with FC Utilities.
Comment Number: 2 Comment Originated: 09/24/2013
09/24/2013: Add note regarding coordination with FC Utilities on abandonment of unused water
and/or sewer services.
Response: A note has been added.
Comment Number: 3 Comment Originated: 09/24/2013
09/24/2013: See redlined utility plans for additional comments.
Response: Redline comments have been addressed.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 09/04/2013
09/04/2013: Mechanical/utility equipment (vents, flues, conduit,RTU's/ac, boxes, meters,
transformers...) locations shall be identified on the plans with notes on how such equipment is
screened and painted.
Response: The louvers, vents, meters, etc have been shown on the exterior elevations and will be painted to
match adjacent materials.
Applicant responed that the equipment will be located in the basement of the building and
vents can be found on the elevations. Looking at the elevations no such locations have been
identified.
Response: Some mechanical equipment is located on the roof and will be fully screened. See the exterior
elevations for location and material.
Is there no roof top mechanicaVutiltiy equipment?
Response: See comment above.
redlines.
Response: This information has been grayed back.
Comment Number: 11 Comment Originated: 09/25/2013
09/25/2013: Please show a bearing & distance to the offsets found. See redlines.
Response: The bearing and distance has been added, per the redlines.
Comment Number: 12 Comment Originated: 09/25/2013
09/25/2013: Please show the east right of way line of Meldrum Street.
Response: The east right-of-way line is now shown.
Comment Number: 13 Comment Originated: 09/25/2013
09/25/2013: Please label the subdivision on the east side of Meldrum Street. See redlines.
Response: The subdivision on the east side of Meldrum Street is now labeled.
Topic: Site Plan
Comment Number: 14 Comment Originated: 09/25/2013
09/25/2013: Please change the legal description to match the Subdivision Plat. See redlines.
Response: Legal description coordinated to match.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Traffic Impact Study
Comment Number: 1
Comment Originated: 09/17/2013
09/17/2013: In Table 2, Trip Generation, under the Parking Garage heading, is the "Other" use
the estimated trips by the general public using the garage unrelated to the developments staff
and clientel use? Please clarify what traffic is referred to as "Other".
Response: A memo responding to this comment is attached.
Department: Transportation Planning
Contact: Aaron Iverson, 970-416-2643, aiverson@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 09/17/2013
09/17/2013: The curved sidewalk through the front plaza should be straightened out so that the
public using the sidewalk don't have to diverge on their path. The way it is laid out blurs the
line between what is public space and what is private space for the office building. The
sidewalk and areas east of the right-of-way should be clearly recongnizable public space.
Response: The path now passes underneath the canopy. There is a direct 7' clear path between the
landscape and the columns.
Comment Number: 2 Comment Originated: 09/17/2013
09/17/2013: Bicycle parking near the entrance of the building facing Meldrum needs to be
Comment Number: 1 Comment Originated: 09/25/2013
09/25/2013: Please mask the text in the hatch area on sheet 7. See redlines.
Response: Noted.
Comment Number: 2 Comment Originated: 09/25/2013
09/25/2013: Should the sheet titles read Blue Ocean?
Response: No. The building is being called Meldrum Office Building.
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 09/25/2013
09/25/2013: There are line over text issues on sheet C300. See redlines.
Response: These line over text issues have been corrected.
Topic: Landscape Plans
Comment Number: 4
09/25/2013: No comments.
Topic: Lighting Plan
Comment Originated: 09/25/2013
Comment Number: 5 Comment Originated: 09/25/2013
09/25/2013: Should the sheet titles read Blue Ocean?
Response: No. The building is being called Meldrum Office Building.
Topic: Plat
Comment Number: 6 Comment Originated: 09/25/2013
09/25/2013: Please add 'Being a replat of a portion of Lots 6 and 7, Block 81 Town of Fort
Collins" to the subtitle.
Response: This description has been added to the subtitle.
Comment Number: 7
Comment Originated: 09/25/2013
09/25/2013: Please add the missing language, and square footage and acreage to the
Statment Of Ownership And Subdivision.
Response: This information has been added to the plat.
Comment Number: 8 Comment Originated: 09/25/2013
09/25/2013: Are there any lienholders? If so, please add a signature block. If not, please add a
note stating there are no lienholders for the property.
Response: A note stating there are no lienholders on the property has been added to the plat.
Comment Number: 9
Comment Originated: 09/25/2013
09/25/2013: Please add bearings & distances for the easements along the west side of the
property. See redlines.
Response: Bearings and distances have been added, per the redlines.
Comment Number: 10 Comment Originated: 09/25/2013
09/25/2013: Please use a different and less prominent text for the (old) Lot labels. See
Response: Noted.
Comment Number: 3 Comment Originated: 09/26/2013
09/26/2013: BDA
Per Assistant Fire Marshal Ron Gonzales, please be aware the adoption of the 2012 fire code
will require a bi-directional antenna be installed in this building. This will be a retroactive
requirement at some point in the near future. It is therefore recommended that the project team
takes this into account during the planning stages and decides to take a proactive position by
installing a BDA during initial building construction. This would also be another step towards
mitigating the access condition already noted.
Response: A radio amplification system in compliance with IBC 403.4.4 and 915 is planned for this building.
The exact configuration is to be determined via a field survey after the building is constructed.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcqov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 09/17/2013
09/17/2013: The site disturbs more than 10,000 sq-ft therefore Erosion and Sediment Control
Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3.
Current Erosion Control Materials Submitted does not meet requirements. Please submit;
Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ ischlam@fcgov.com
Response: Acknowledged
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcqov.com
Topic: General
Comment Number: 2
Comment Originated: 09/24/2013
09/24/2013: Please provide a letter stating permission for draining the west portion of the
development through the lot to the north.
Response: Included with submittal
Comment Number: 3 Comment Originated: 09/24/2013
09/24/2013: Please be more specific on the design of the LID features and give a preliminary
indication on the volume of treatment that will be proposed and show which areas will be
treated, including the areas in the right-of-way.
Response: The LID narrative has been expanded. Preliminary calculations have been appended to the
letter as well.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Response: A utility coordination meeting was held on 10/9/13 and the locations of the transformer were
discussed. It was confirmed by our electrical engineer that the new building will require a new transformer and
it is shown on the civil plans.
Comment Number: 3 Comment Originated: 09/17/2013
09/17/2013: A C-1 form and 1-line diagram will need to be submitted. The C-1 form is available
at http://www.fcgov.com/utilities/imq/site specific/uploads/c-1 form.pdf.
Response: A C-1 form and a 1-line diagram will be submitted as soon as they are available to submit
Comment Number: 4 Comment Originated: 09/17/2013
09/17/2013: Contact Light and Power Engineering for the fire pump wiring requirements.
Response: The fire pump will be connect to comply with Light and Power requirements.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 09/26/2013
09/26/2013: OUT OF ACCESS
Buildings exceeding 30' in height require ladder truck access in order to facilitate rescue
operations from upper stories as well as allow firefighters access to the roof for fire
suppression. This fire access lane shall be located on the longest side of the building and be
position no farther than 30' from the building. These code requirements are expected to be met
in low rise buildings and comment #7 from conceptual review addressed this requirement.
It is understood that the site constraints and current building design do not allow this code
requirement to be met. The fire lane cannot be positioned along the longest side of the
building and the building setback from Meldrum is greater than 30'. These two site conditions
coupled with the 80' building height make firefighter rescue operations and roof access
unobtainable. In this situation, our ladder truck quite literally cannot reach the top of the building
and it forces the PFA to consider this building similar to a high rise.
As such, Fire Marshal, Bob Poncelow and I met with project representatives on Aug. 16 to
discuss options for alternative compliance. The July 19 response letter from the project team
proposes that to mitigate the site condition, "one stair shaft of the building will be equipped with
a communications system and areas of refuge on each level with in the stair shaft." The Fire
Marshal appreciates the efforts the project team has made to date however as the current plan
creates a condition containing access obstacles similar to those of high rise buildings,
additional means of achieving alternative compliance are necessary. Further review and
discussion is needed. In the interim, the Fire Marshal invites the project team to consider other
code requirements pertaining to high rise buildings. Feel free to contact me with any questions.
Response: VFLA and the owner have been in contact with Jim Lynxwiler and are in the process of working
out a solution.
Comment Number: 2
Comment Originated: 09/26/2013
09/26/2013: STANDPIPES
Both 2 hour fire protected stairwells will have a standpipe system.
Response: The path now passes underneath the canopy. There is a direct 7' clear path between the
landscape and the columns.
Comment Number: 9 Comment Originated: 09/25/2013
09/25/2013: Additional notes may need to be added to the Site plan and civil drawings in
regards to the Canopy, boulders, etc. that they will be approved by separate permit and not
approved per these drawings.
Response: Added to notes.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
Comment Number: 1
09/16/2013: No comments.
Department: Internal Services
Contact: Seth Lorson, 970-224-6189,
Topic: General
Comment Number: 1
slorson@fcgov.com
Comment Originated: 09/16/2013
Comment Originated: 09/09/2013
09/09/2013: GIS:
1. Projects with three or more tenant units require the Unit Level Addressing form to be
completed and submitted to the GIS Department once plans have met final approval through
Development Review and are recorded with the City. This can occur anytime during
construction, but before any utilities or address signs are installed. All addressing will be
determined by the GIS Department and submitted to Poudre Fire Authority, LISPS, Building
Services, and Fort Collins Utilities. Failure to contact GIS and determining addresses through
other means may result in address changes.
The Unit Level Addressing form can be obtained by contacting the GIS office at
gis@fcgov.com or (970) 416-2483.
Response: There will be one tenant occupying the building. At this time, there is no need for suite numbers.
Department: Light And Power
Contact: Justin Fields, 970-224-6150, "fields@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/17/2013
09/17/2013: System modification and electric development charges will apply, contact Light
and Power Engineering (970-221-6700) for an estimate of these charges. A credit will be given
for the existing services. It is recommended that the existing services are documented before
deconstruction begins.
Response: Existing services and intended new service locations will be documented prior to deconstruction.
Comment Number: 2 Comment Originated: 09/17/2013
09/17/2013: Coordinate the transformer and meter location with Light and Power Engineering,
as well as the relocation of the electric feed for 401 Mountain.
proposed.
Response: The lotlines and labels for the existing lots to be replatted are now gray for clarity.
Comment Number: 2
Comment Originated: 09/25/2013
09/25/2013: We will require a letter of intent from the adjacent property owner prior to public
hearing for the the offsite access, drainage and utility easement.
Response: The letter of acknowledgement is included with submittal.
Topic: Site Plan
Comment Number: 4 Comment Originated: 09/25/2013
09/25/2013: Additional information will be required for the size of the proposed boulders within
the right of way. They should not exceed 2 feet in height.
Response: The proposed boulders will vary in height to create a more natural look and provide interest. Many
of the boulders are intended to also function as seating so they will be 18"-24" max.
Comment Number: 5
Comment Originated: 09/25/2013
09/25/2013: The sandstone pavers in the right of way are not atypical for right of way. Please
propose a detail of how these pavers will be installed, bedded, etc. I will discuss internally if
we have a detail that has worked in the past.
Response: Detail has been provided with submittal.
Comment Number: 6 Comment Originated: 09/25/2013
09/25/2013: As discussed previously the main entrance canopy into the Right of Way may
require an encroachment easement that needs to be approved by Council. I will provide you
with more information with the steps required for the proposed canopy.
Response: Noted.
Comment Number: 7
Comment Originated: 09/25/2013
09/25/2013: If accent lighting or spot lights are proposed in the right of way we will need
additional information on the type of lighting, power demand, bury depth, etc. The lines should
be locatable.
Response:
• There are (4) type "DD" landscape tree lights shown in the right of way on sheet 8.
• The fixture is scheduled to utilize (1)50W MR16 Ushio lamp at 120V on sheet 8
• The fixture is scheduled on sheet 8 as combo posUGFI receptacle and accent flood with internal
honeycomb louver and external glare shield Arlington GP26BR + Hydrel
4620-M50-MVOLT-KM-I HL-GS-BZ.
• The light fixture cut sheet are shown on sheet 11.
• The line to feed these fixtures will be at code minimum per NEC 300.5 and will depend on the installation
method chosen by the contractor probably 18-24" below finished grade.
• The line will be "locatable" the same way any 120V underground electrical circuit is locatable.
Comment Number: 8
Comment Originated: 09/25/2013
09/25/2013: The public sidewalk at the main entrance should pass underneath the canopy
providing a straight and direct path for pedestrians. The sidewalk may still meander in front of
the canopy but a direct accessible route still needs to be provided underneath.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
Comment Number: 10
Comment Originated: 09/25/2013
09/25/2013: The alley behind this project that will be used for access to the project is currently
failing and in poor condition. The alley will need to be brought up to standard from the back of
Right of Way at Mountain Ave to the southern lot line of this project.
Response: Acknowledged. Our paving plan now indicates that this portion of the alley is to be repaved.
Design information on this repaving will be provided at final.
Comment Number: 11 Comment Originated: 09/25/2013
09/25/2013: This project is to be stand alone and separate from the parking garage propsoed
to the South. The plans appeared to show remnants of the garage on sheets. Please revise
plans to only show those improvements intended with the office building.
Response: This issue was coordinated with Andrew. The existing parking lot outline is now shown on site and
Civil.
Comment Number: 12 Comment Originated: 09/25/2013
09/25/2013: The building includes a basement. How will this foundation be constructed in such
close proximity to adjacent properties? If foundation tie -backs are to be used they will need to
be fiberglass if extended into the right of way and a letter of intent required by all adjacent
property owners.
Response: Brinkman Construction is confirming whether or not shoring will be required. The adjacent building
has a basement which might alleviation the need for shoring. Letters of intent will be provided if necessary.
Comment Number: 13 Comment Originated: 09/25/2013
09/25/2013: Additional information is required prior to hearing on the rain gardens proposed
within the Right of Way along Meldrum Street. Additionally some preliminary design on grade
spots on how drainage will navigate the curb and gutter and flowline bump outs on Meldrum
Street. At final a flowline profile will be required on West side of Meldrum.
Response: An initial meeting with Engineering and Stormwater was conducted on October 91". The
"flow -through" design concept and treatment area were clarified. Preliminary spot elevations have been
added to the Utility Plans. Additional design details are expected to be discussed during the Final Plan
phase.
Topic: General
Comment Number: 3
Comment Originated: 09/25/2013
09/25/2013: Please let me know when you would like to schedule Utility Coordination meeting
so that I can make sure we get as many utility representatives as possible in the meeting.
Response: The Utility Coordination Meeting was held on October 9" . Thank you.
Topic: Plat
Comment Number: 1 Comment Originated: 09/25/2013
09/25/2013: Vary the linetype or text to clearly identify that Lot 6 and 7 are existing and Lot 1 is
exterior elevations). The massing of the 6th floor has been updated to add more articulation.
Comment Number: 3 Comment Originated: 09/24/2013
09/24/2013: Please label the windows to ensure transparency where they appear to exist.
Response: Labels have been added the exterior elevation to more define the windows.
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 09/24/2013
09/24/2013: A plaza that provides active and passive activities for the general public must be
provided per Sec. 4.16(E)(1)(c). This can be provided in the ROW amongst the boulders. Thus,
the boulders must be seating friendly and arranged in groups that promote interaction and have
access such as pavers. Detailed plaza renderings shall be provided at the PDP level.
Response: The eastern area of the plaza has been enhanced to promote more seating opportunities.
Sandstone boulders set approximately 18"- 24" high will serve as informal seating along the sandstone plaza.
Two additional areas to the north and south of the plaza have also been added to expand seating area and
will feature a crusher fines groundcover.
Comment Number: 2 Comment Originated: 09/24/2013
09/24/2013: Landscaping shall be provided against the building per Sec. 4.16(D)(1). This detail
can be provided at Final Plan.
Response: Noted.
Topic: Lighting Plan
Comment Number: 1 Comment Originated: 09/24/2013
09/24/2013: Please submit an alternative compliance request per Sec. 3.2.4(E) for the
uplighting on the decorative light fixtures and the light spill beyond 20' along the ROW that
exceeds 0.1 footcandles.
Response: Alternative compliance letter included with submittal.
Topic: Site Plan
Comment Number: 1
Comment Originated: 09/24/2013
09/24/2013: If all bike parking is provided as enclosed parking, an alternative compliance
request must be submitted per Sec. 3.2.2(C)(4)(c).
Response: Alternative compliance letter included with submittal.
Comment Number: 2 Comment Originated: 09/24/2013
09/24/2013: What will the tenants do regarding trash until the adjacent building is constructed?
Response: The existing trash enclosure on the property at 401 Mountain will be shared between the
buildings. The building at 401 West Mountain has the same owner and has agreed to share the trash
enclosure. This will be a permanent situation.
Comment Number: 3 Comment Originated: 09/24/2013
09/24/2013: The shadow study bleeds off the panels provided. Please expand so the full
extent of the shadow can be seen.
Response: The shadows have been expanded to show their full coverage. See attached sheets.
City of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
lcgov. com/de velopmentre view
October 11, 2013
Responses: 10-16-13
Planning Response: Ripley Design
Civil Response: Northern Engineering
Architecture Response: VFLA
Electrical Response: APS
Traffic Response: Delich Associates
RE: Meldrum Office Building, PDP130027, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or
slorson@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com
Topic: Building Elevations
Comment Number: 1
Comment Originated: 09/24/2013
09/24/2013: Provide examples as a material board and rendering of the "composite panels
1-3", "zinc panel", "spandrel panel", and "storefront". These materials are not included in the
permitted materials noted in Sec. 4.16(D)(5)(e). Also, a provision of this section is that the
material modules not exceed 5' horizontally or 3' vertically thus a modification may be
necessary because panels of these materials exceeding this size are in many places on the
proposed building.
Response: Samples and/or cut sheets of the materials will be provided to the planning department. The zinc
panel in specific has been removed from the scope of the exterior of the project. The panel joint do exceed
5'x3' in some areas and this is to mitigate/reduce the mass of the building. The larger panels help the building
disappear.
Comment Number: 2
Comment Originated: 09/24/2013
09/24/2013: The zinc panels on the 6th floor exceed Win width and are easily viewed from
Mountain Avenue. This area needs to be broken up per Sec. 3.5.3(E)(2)(a).
Response: The zinc panel on the 6th floor have been changed to a third composite panel color (see the