Loading...
HomeMy WebLinkAboutFEEDER SUPPLY - PDP - PDP130012 - CORRESPONDENCE - HISTORIC PRESERVATION (4)IIgng�'� non �i�i IN 11 !������ � ��� �� :� 1111 !inn � ��n�� ��►i�, 11 NJ W I 0 No Text L k4 41v[Tx5 ZT 'Aphl sue- - Lj Z4, ' FEEDER SUPPLY RESTAURANT SF n� � S Bar Area 2,025 I Dining R0 om-1st level) 1,800 L'�. Indoor -Outdoor Patio 840 4,665 Dining Room-2nd level 1,260 MALL Patio FrontPatio324 859 Kitchen/Storage A 1,170 �� �• t/` Kitchen/Storage B 784 1,954 I. jy of+� rQQ I II EntryiDelivsslWalting 240 i� 7 p' ® FireTraSprinkler 126 �c Fire S rinkler Room 126 ` I �� J• Ij,— N D Cxjr�l J Restaurant Office 216 �eV� %1!¢/l * Hall 260 + r � o l a Elevator/Stairs 600 1,942 �0 Ste) C( Zl,� %�, r TOTAL 10,680 / Existing Basement 1,800 aS�CbS c10f2 J New Basement 3,800 5,400 V Q �j0 2nd Level Office 3,971 i -E Nr�Nc ray s ff I,S OF BEMING.5' N 41 `19 N.9" Is' 2B4 22' b R� f4 Rls,l wr, LI ly J" av�srz �j - rA-M s rD 4 4—�) PZr I �lS j i Iz� s L m � 66.69' Ilzl's•L m � o I � D a aN Films u � X 3 G6 ecwo 3 h✓� "'s Ui CCb - �' via o RLSi_ i CCLSsS.0F4VIA ItP7 ti °0 `1 z -- �°� ° ° soil, 5.p°� D� ao �s�a 1 _ /a 16 � W gIE 85.2' i Driveway 38.5 21.7' Concrete Curb and Gutter m, fps • �o POGO Linden Street \-\C r/ 100' R.O.W. > 1'RX�/ Asphalt Surface �4 T- 3 — Also enclosed is the latest design for "industrial -building" style apartments. At our last historical meeting in Fort Collins, the consensus was that embracing the elements of a historic industrial building was the most uniquely appropriate style for this area. We agree and have dropped previous designs and are proceeding with "industrial building" style apartments. Thank you for your support of our proposed plan for making a creative adaptive reuse of the Feeder Supply Mill Building and Warehouse Addition as a destination restaurant which a) meets the requirements necessary to be successful as such a use, b) is historically and architecturally sensitive to the Mill Building and Warehouse Addition with minimum alterations, c) is sensitive to and respects the history and architecture in the National Historic District in which it is located, d) is sensitive to and respects the unique historic and architectural nature of the River District, and e) complies with the ten Secretary of the Interior rehab principles. Please contact me with any questions or if I can be of any assistance. Sincerely, P.S. Enclosed also please find three updated memos: Feeder Supply Building Project — Overall Plan Rehabilitation Of And Addition To The Feeder Supply Mill Building And Warehouse Addition Apartment Building To: Heather, Anne, Joe, Lyle Cc: Karen, Josh, Sherrie, Bud, Dick, Bruce, Matt From: Jon Re: Feeders Supply Project Update Date: 12/10/12 1 — Here is the latest Feeder Supply Building rendering and restaurant floor plan. Please note: A. Addition wall has been move back to expose and provide an excellent view of the loading dock, the loading dock doors and the scale. They now will become part of the historical ambiance of the front patio. B. The first window north of the loading dock will be converted into an access - way for restaurant patrons to go from the hostess — waiting area into the Mill dining room, which based on restaurant consultants and owners is critical and works for us to be able to make a successful adaptive reuse of the Mill as a restaurant. C. Addition wall for the second level has been moved all the way back to the north end of the Mill Building exposing and providing an excellent view of the entire 2"d and 3`d levels of the west side of the Mill Building. D. It is necessary however to alter this elevation by installing three windows to allow an adequate amount of natural light into the second level, in order to make a successful adaptive reuse of the second level of the Mill Building as a conference — banquet room, according to restaurant consultants and owners. It should be noted, however, that this wall is not a street frontage wall, and by adding these three windows here permits the street — fronting east Mill Building wall (fronts on Willow) to be kept in its pristine historical condition with no additional windows required. 2 — The proposed addition over the existing Warehouse Addition has been removed. We have relocated the elevator and stairs up, so they will be located entirely in the new addition and we still can achieve adequate second level access to the Mill Building second level conference — banquet room.