HomeMy WebLinkAboutROCKY MOUNTAIN ARCHERY - FDP - 21-09A/B - SUBMITTAL DOCUMENTS - ROUND 1 -Department: Stormwater-Water-Wastewater
Topic: Landscape plan
Number: 2
Water and sewer service lines are displayed on the landscape plan, with separation
distances noted.
Topic: Water/Wastewater
Number: 1
Note revised
Department: Zoning
Topic: Zoning
Number: 17
The site plan has been modified to only show the building footprint.
Number: 18
The incorporation of a parking lot island would remove one of the eight spaces.
Due to the limited number of parking spaces, it has been requested that the island
requirement be waived.
Street tree caliper increased to 2".
Number: 19
Drive aisle dimensions shown.
Number: 20
Trash receptacle to be shielded from view in the trash enclosure on the northeast
corner of the building. (shown on plans)
Number: 21
Setbacks from all lot lines dimensioned on site plan.
Number: 22
A modification to Section 3.5.3(13)(2)(b) has been requested to allow the building to
be placed 50 feet from the front property line along Innovation Drive versus 15 feet.
Number: 23
All exterior lighting is shown on site plan and noted to be shielded and down
directional.
Department: Light & Power
Topic: Utility plan
Number 3:
The paper copy of the final site & utility plan is included with this submission. The
AutoCAD file of the site plan will be sent to Pat Colburn upon final approval.
Number 4:
The power for the building will be 120/208 volt 3 phase, and originate from the
onsite transformer. The commercial service (C-1) form is attached.
Department: PFA
Topic: Fire
Number: 28
The EAE on the north side drive aisle has been located and marked on the plan.
Number: 29
N/A
Number: 30
N/A
Number: 31
A key box ("Knox box") will be located on the northwest corner of the building,
with the required alarms and strobe lights.
Number: 32
The FDC will be located on the north side of the building, west end.
Number: 33
A 6" fire line to be installed to supply the required sprinkler system as noted on the
Utility Plan.
Number: 34
All fire protection equipment and locations will be marked with permanent signage.
Number: 35
Building address numerals will be installed in a highly visible location. Numerals to
be a minimum of 6", and placed on a contrasting background.
Topic: Utility plan
Number: 16
Natural Resource signature line removed.
Department: Engineering
Topic: General
Number: 5
ROW width of Innovation Drive shown and labeled.
Number: 6
Directional handicap ramps have been incorporated into the project. (Ref -
Engineered site plan) All factors were considered, including but not limited to, the
existing sidewalks on the properties to either side, the location of existing utilities, and the
ease of use for pedestrians.
Number: 7
The name, address, and phone numbers of the Developer, Owner, and Engineer hav
been listed on the cover sheet.
Number: 8
The background text line weight on sheet 4 has been revised.
Number: 9
The driveway separation standard as listed in LCUASS has been met.
Number: 24
Minor corrections have been made.
Number: 25
1)Text issues have been corrected on site and landscape plans.
2)The legal description on the site and landscape plans has been corrected.
3)All redlines have been incorporated.
Number: 36
Corrected
Number: 37
The balance of the TDRF fees was paid on 8/17/09. (Ref: Receipt No. 143995)
9/2/09
Rocky Mountain Archery
Project Review Responses
The following responses are to issues listed on the document entitled "STAFF PROJECT
REVIEW' issued by the City of Fort Collins and dated 7/31/09. The document was
prepared in regards to the PDP for Rocky Mountain Archery.
Department: Current Planning
Topic: Green Building
Number: 10
Investigation of the referenced websites revealed that most of the programs
available were for larger projects than this one. There was some interesting information
available regarding efficiencies, that is still being studied.
Number: 11
The Integrated Design Assistance program was contacted, and a meeting to evaluate
the optimum R-value insulation to use, is to be scheduled.
Topic: Landscape plan
Number: 14
The sand filtration system has been replaced by a larger capacity water quality
reservoir.
Number: 15
The sand filtration system has been replaced by a larger capacity water quality
reservoir.
Topic. Site plan
Number: 12
The sand filtration system has been replaced by a larger capacity water quality
reservoir, which is located on the site plan.
Number: 13
Trash enclosure details have been added to the site plan, showing compliance with
Section 32.5