Loading...
HomeMy WebLinkAboutINVERNESS INNOVATION PARK - ODP - 30-09 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESb. Industrial: to be determined 4. Written narrative addressing each concern/issues raised at the neighborhood meeting(s). a. No neighborhood meetings have been held for the overall development plan. Neighborhood meetings will be held for individual PDP submittals when more detailed information can be presented to the community. S. Name of project as well as any previous name the project may have had during Conceptual Review. a. Inverness Innovation Park 6. Response Letter (27 copies) addressing each of the applicable issues raised in the conceptual review letter. a. Refer to PDP submittal project-'RM12 at Inverness Innovation Park' submitted concurrently with this ODP. 7. No street names proposed for this development plan. 8. Legal Description of the site. A tract of land situated in the Southwest quarter of section 1 And the northwest quarter of section 17, Township 7 north, range 69 west of the 6th principal meridian, city of Fort Collins, County of Larimer, State of Colorado. 9. The name and address of each owner of property within the boundaries of the development plan area. Urban Development Partners, LLC 1220 South College Avenue Fort Collins, CO 80524 Contact: Michael Jensen — 970 212-2420 10. Development Schedule RMI2 phase 1 will break ground in the fall Of 2009. RM12 phase 2 is most likely to occur 5 to 7 years after completion of phase 1. It is anticipated that the east parcel will contain two buildings with anticipated construction starts in 2 to 4 years assuming market stability and growth in North Fort Collins. The current plan is that the south parcel will also contain two buildings, again with an anticipated construction start in approximately 2 to 4 years assuming market stability and growth in North Fort Collins. Previe,x Architecture+Planning 204 Walnut Street Suite A. Ph:970-493-3 391 Fax:9 70-493-3398 J approximately 60,000 s.f. Parcel B proposes (2) buildings for office use. Limited square footage for light industrial uses may be included. The total building square footage will be approximately 75,000 s.f. Parcel C proposes (2) buildings for office and industrial uses. The total building square footage will be approximately 40,000 s.f. Parcel D is proposed for a central infiltration pond which will be part of the overall developments drainage plan. No buildings are proposed for parcel D. Transportation The Inverness Innovation Park development will include considerable improvements to existing East Vine Drive to bring it to current street standards per its current street classification. Improvements will include bike lanes, public pedestrian walkways and street tree plantings. Community Appearance and Design To the greatest extent possible buildings within the Inverness Innovation Park will be designed to support the City plan Policies and Principals. These policies and principles will be addressed at PDP submittal. (refer to PDP submittal-RM12, which is proposed for parcel A). Economic Sustainability and Development The Inverness Innovation Park will take advantage of its close proximity to the vibrant Old Town center. The development will take advantage of Old Town's existing services and amenities. The proximity to the city center will be an important factor and sales tool in attracting future tenants to this development. The project will be designed with a strong identity; will contribute to the urban fabric and enhance the tenant's sense of community. The proposed development will look to recent successful projects within the immediate vicinity (new Belgium brewery, Old town North) in order to contribute to an emerging identity within this fringe/corridor community. The project will support those higher standards of design and contribute to a sense of permanence and sustainability within the greater city. 2. Statement of proposed ownership and maintenance of public and private open spaces: applicant's intentions with regard to future ownership of all or portions of the project development plan. The business park will be managed by a Business Owners Association (BOA). The BOA will maintain all the common areas through dues paid by the park's building owners. Buildings will be predominately owner occupied with the possibility of developer owned and leased buildings for businesses that prefer lease versus ownership positions. 3. Estimate of number of employees for business, commercial and industrial uses. a. Commercial -office: to be determined Preview Architect=+Planning 204 Walnut Street Suite A. Ph:970-493-3 91 Fax:970-493-3398 ,ANNIN Inverness Innovation Park — Statement of Planning Objectives — Overall Development Plan August 12, 2009 Project —Inverness Innovation Park Preview Architecture+Planning Project number — 2008-107.1 Statement of planning objectives Project Description: The Inverness Innovation Park project is a proposed development for a site on the north and south sides of East Vine Drive located between North College Avenue (to the west) and Linden Street (to the east). Neighboring properties include the Old Town North mixed use development to the north, and the Inverness Farm property to the west. The sites within the development are zoned CCN, Community Commercial North College District north of East Vine Drive and CCR, Community Commercial-Poudre River District to the south of East Vine Drive. The permitted land uses of this zoning support the proposed land uses of this project. The proposed site allows for commercial/retail and industrial development within close proximity of the Old Town center. The amenities and commercial core of Fort Collin's Old Town will help support the growth of this corridor/fringe community. Urban Development Partners, Preview Architecture+Planning, Vignette Studios and Apex Engineering look forward to working closely with City Staff in an effort to receive project approval as swiftly as possible. 1. Statement of appropriate City Plan Principles and Policies achieved by the proposed plan. a. Community Wide Land Use The permitted land uses of this zoning support the proposed land uses of this project. Proposed land uses include commercial/retail and industrial. Parcel A proposes (2) buildings for office use including limited square footage for wet labs. The total building square footage will be Previe� Architecture': Ilanning 204 Walnut Street Suite A. Ph'970-493-3 9i Fax 9?0-49 3- 398