Loading...
HomeMy WebLinkAbout121 REMINGTON ST. - ACCESSORY BUILDING W/HABITABLE SPACE - FDP - 31-09/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET�I21� Final Plans Checkli City of Fort Collins Plannin and liming Submittal Checklist: Final Plan Review The following information is required to be submitted with all applications, unless waived by staff. Any item waived must be dated and initialed by a planner with the City of Fort Collins Planning 8 Zoning Department. �v- Application form and*f►Gag-fes. Transpor13, tation Development Development Review Fee - please contact Engineering at 221-6605 for information. `o ` Name and address of each owner of property within the boundaries of the development plan area. ❑ List of names of all general and/or limited partners, managers and directors and/or officers and directors of the corporation involved as either applicants or owners. Final Site Plan" opies, 24"x 36"- folded)— 3 ,l( Subdivision Plat* q Architectural Elevations* (8 copies, 24"x 36" - folded) Landspape Plan* (20 copies, 24" x 36" - folded) P4 P 1 a., Drainage and Erosion Control Report* (4 copies) wu- ,Z Final Utility and Drainage Plans* (13 copies, 24" x 36"- unfolded) r� Requirements for utility plans checklist (1 copy). zl Transportation Impact Analysis* (TIA), updated* Q copies). Soils Report* (2 copies). /11 Deeds* (contingent on final approval) d Mylars and PMT* (Mylars not needed until Final plans are approved) ( nl'4-9 r -reic L%f q fv' Other information Director may require: ❑ Subsurface Hydrologic Study* (4 copies) ❑ Certification of Notice to Mineral Owner(s)' (1 copy) ❑ Easements/Agreements* (2 copies, each) o Environmental Reports* *This document is meant to be used as a checklist only. For a more detailed list and explanation of each of these items, please see the handout. "Submittal Requirements: Final Plan Review" Revised December 19. 2007 Final Plans Checklist Final Plan Routing Sheet -rf City of F _ rt Collins Item: This project went to ! has been schedul for Public Hearing on: The following table lists final plan submittal requirements for this project. A final fee of $1,000.00 is required at the time Qf submittal unless otherwise waived or reduced. gee Waiver/Reduction Approval: I a e 9 Amount: Date:/ Planner /I d • _, , Items Requested ' Engineering Pavement Environmental Planner (Dana) Light & Power Neqhborhood Services Technical Services �■n■■■n■■■■■ ■■■■ Traffic Operations Water Conservation off ■■■■i■o■a■ ■■■■