Loading...
HomeMy WebLinkAboutCHASE BANK @ RIGDEN FARM - PDP - 26-09 - REPORTS - RECOMMENDATION/REPORTChase Bank at Rigden Farm, PDP, #26-09 September 28, 2009 Administrative Hearing Page 3 three (3) separate lots, which will be Rigden Farm 15th Filing. This PDP is proposed on Lot 1 of Rigden Farm 15th Filing. 2. Division 4.23 of the LUC, Neighborhood Commercial Zone District The proposed financial institution is permitted in the NC zone district subject to an administrative (Type 1) review. The PDP meets the applicable Development Standards as follows: 1. Section 4.23(E)(1)(a) Overall Plan. The applicant has demonstrated that the development plan contributes to the existing development in the surrounding area in terms of street and sidewalk layout, building siting and character, and site design. 3. Article 3 of the LUC — General Development Standards The Project Development Plan complies with all applicable General Development Standards as follows: A. Division 3.2, Site Planning and Design Standards 1. Section 3.2.1, Landscaping and Tree Protection a. The proposal complies with Section 3.2.1(D)(1)(c) in that it provides "full tree stocking" within 50' of the building, according the standards as set forth in this section. b. The proposal complies with Section 3.2.1(E)(4)(b) in that the on -site parking areas, containing 26 spaces and a bank drive -through facility, will be screened from the Timberline Church to the south and the private drive to the west with shrub plantings and ornamental and canopy shade trees. c. The proposal complies with Section 3.2.1(E)(5) in that it provides interior landscaping in the parking area that exceeds the minimum requirement of 6% for a parking lot with less than 100 spaces. 2. Section 3.2.2, Access, Circulation and Parking a. The proposal complies with Section 3.2.2(C)(4)(a) in that it provides secure and conveniently located bicycle parking (5) in the amount of 19% of the total number of automobile parking spaces (26) on -site, exceeding the minimum requirement of 5%. 3 Chase Bank at Rigden Farm, PDP, #26-09 September 28, 2009 Administrative Hearing Page 2 standards located in Division 3.2 - Site Planning and Design Standards, Division 3.3 — Engineering Standards and Division 3.5 - Building Standards of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS with the exception of: A. Section 3.2.1(D)(3). Compliance with this Section is recommended as a Condition of Approval; and standards located in Division 4.23 Neighborhood Commercial (NC) of ARTICLE 4 — DISTRICTS. Financial services and other small commercial/retail uses are permitted in the NC — Neighborhood Commercial Zoning District, subject to administrative (Type 1) review. The NC District is: Intended to be a mixed -use commercial core area anchored by a supermarket or grocery store and a transit stop. The main purpose of this District is to meet consumer demands for frequently needed goods and services, with an emphasis on serving the surrounding residential neighborhoods typically including a medium -density mixed -use neighborhood. In addition to retail and service uses, the District may include neighborhood -oriented uses such as schools, employment, day care, parks, small civic facilities, as well as residential uses. This proposal complies with the purpose of the NC District as it is a financial institution in close proximity to a neighborhood center and single family and multi -family neighborhoods. COMMENTS: 1. Backciround The surrounding zoning and land uses are as follows: N: NC; existing neighborhood center, King Scoopers, Fuel Station, 1st Bank, etc. S: LMN; existing Timberline Church Campus E: NC; existing Seven Oaks Academy and Little Acorns Preschool W: RL; existing single family residences across Timberline Rd. The property was annexed in November, 1997 as part of the Timberline Annexation. The property was originally platted in October 1999 as Tract A of Rigden Farm 1st Filing. Tract A of Rigden Farm 1st Filing is in the process of being replatted into r� of ,,. rt� Collins ITEM NO Z (' o ( % MEETING DATE 6 STAFF HEARING OFFICER PROJECT: Chase Bank at Rigden Farm, Project Development Plan - #26-09 APPLICANT: CLC Associates Inc. 8480 E Orchard Rd #2000 Greenwood Village, CO 80111 OWNER: J.P. Moran Chase (Under Contract) 112517 St Floor 2 Denver, CO 80202 PROJECT DESCRIPTION: This is a request for a Chase Bank branch to be located at lot 1 of Rigden Farm 15"' Filing. The property is located on the southeast corner of S Timberline Rd and Custer Dr and is in the NC, Neighborhood Commercial zone district. The surrounding properties are zoned NC to the north and east, LMN, Low Density Mixed -Use Neighborhood, to the south and RL, Low Density Residential to the west. The proposed use is permitted in the NC District, subject to administrative review (Land Use Code, Section 4.23(B)(2)(c)9.). RECOMMENDATION: EXECUTIVE SUMMARY: Approval of the Alternative Compliance Request Approval of the PDP, with one (1) condition This PDP complies with the applicable requirements of the Land Use Code LUC , more specifically: the process located in Division 2.2 - Common Development Review Procedures for Development Applications of ARTICLE 2 - ADMINISTRATION; Current Planning 281 N College Av PO Box 580 Fort Collins, CO 80522-0580 fcgov.com/currentplanning 970.221.6750 Administrative Public Hearing Sian -In Project: l ,V l Ck S2 "A, •PDP #2 t -09 Meeting Location: Z2I Al. �l(AqQ A✓A C�av zf--C' Date: PLEASE PRINT CLEARLY Name ddress Phone Email SCerr HA1ErL /610 c)vw,Iaoea ST. ST8 120 3a3-89S-29o1 SmA►lCQ-P-AGOC.CO" 'S S'Av.. . ` CGC. T.-A di 2WO Z?9.43WO J'2ct tip. i 6a SZ3 S'7u aL 3�f�8 U, , 5 .G Grt, Chase Bank at Rigden Farm, PDP, #26-09 September 28, 2009 Administrative Hearing Page 8 FINDINGS OF FACT/CONCLUSIONS After reviewing the Chase Bank at Rigden Farm, Project Development Plan, staff makes the following findings of fact and conclusions: 1. The proposed land uses are permitted in the NC — Neighborhood Commercial zone district. 2. The Project Development Plan complies with all applicable district standards' of Division 4.23, the NC zone district, of the Land Use Code. 3. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code, with the exception of one (1) standard: • Section 3.2.1(D)(3), which Staff is recommending compliance with as a Condition of Approval. RECOMMENDATION: Staff recommends approval of the Alternative Compliance Request. Staff recommends approval of the Chase Bank at Rigden Farm, Project Development Plan - #26-09, with the following condition: 1. Applicant shall revise the plan at final plan review to comply with Section 3.2.1(D)(3) of the LUC. Chase Bank at Rigden Farm, PDP, #26-09 September 28, 2009 Administrative Hearing Page 7 We believe approval of this plan is justified by its consistency with the commercial uses in this area and with the spirit and intent of the Land Use Code of Fort Collins. On behalf of Chase, we look forward to working with you on this project. Chase is eager to get this project started with an opening in the late spring or early summer 2010. C. Staffs Analysis of the Applicant's Request: Staff has determined that the additional parking stall request adequately meets the seven (7) review criteria of this Alternative Compliance Section as follows: 1. The additional parking does not detract from the "continuity, connectivity and convenient proximity for pedestrians between or among existing or future uses in the vicinity." The pedestrian connectivity is not changed due to the additional parking spaces. 2. The parking lot "minimizes the visual and aesthetic impact along public streets" by its location on the south side of the site. The most visible sides of the building are from Timberline Rd., to the west, and Custer Dr., to the north, the additional parking spaces are placed in the least visible location on the site and a landscape buffer exists between Timberline and the proposed parking. . 1 3. The additional parking is buffered by landscaping to "minimizes the visual and aesthetic impact on the surrounding neighborhood." 4. The additional parking "creates no physical impact on any facilities serving alternative modes of transportation." This site still adequately accommodates alternative modes of transportation, as it maintains direct connection to a public sidewalk along Timberline Rd. and has five (5) bicycle parking spaces on the site. 5. The additional parking "creates no detrimental impact on natural areas or features." 6. The additional parking "maintains handicap parking ratios", and 7. The site is located in the NC zone district so the last criterion does not apply. Therefore, Staff recommends approval of the Alternative Compliance Request allowing nine (9) additional parking stalls beyond the seventeen (17) allowed by the LUC. 7 Chase Bank at Rigden Farm, PDP, #26-09 September 28, 2009 Administrative Hearing Page 6 decision maker shall take into account the number of employees occupying the building or land use, the number of expected customers or clients, the availability of nearby on -street parking (if any), the availability of shared parking with abutting, adjacent or surrounding land uses (if any), the provision of purchased or leased parking spaces in a municipal or private parking lot meeting the requirements of the city, trip reduction programs (if any), or any other factors that may be unique to the applicant's development request. The decision maker shall not approve the alternative parking ratio plan unless it: 1. does not detract from continuity, connectivity and convenient proximity for pedestrians between or among existing or future uses in the vicinity, 2. minimizes the visual and aesthetic impact along the public street by placing parking lots to the rear or'along the side of buildings, to the maximum extent feasible, 3. minimizes the visual and aesthetic impact on the surrounding neighborhood, 4. creates no physical impact on any facilities serving alternative modes of transportation, 5. creates no detrimental impact on natural areas or features, 6. maintains handicap parking ratios, and 7. for projects located in D, L-M-N, M-M-N and C-C zone districts, conforms with the established street and alley block patterns, and places parking lots across the side or to the rear of buildings. B. Applicants Justification (taken from the Applicant's Request): Parking stalls comply with the City of Fort Collins land use code for size and layout. In previous meetings with the City on parking counts it is understood that the maximum allowance of 3.5 stalls per 1000 sf would be 14 for this location with an additional 25% increase since the site does not have off street parking for a total of 17 parking spaces. A. request was presented to the city for additional parking for this site based on the number of employees that Chase will employ at the site. Per the (ULI) Urban Land Use Institute a Bank with a Drive up with the square footage of 4,195 calculates out to a requirement for 13 customers and 7 employees, at this location Chase will have 13 to 14 employees. The site plan submittal requests 26 parking spaces, with two stalls close to the front door designed as accessible parking stalls, an Alternate Compliance per section 3.2.2.K3 request is requested with this PDP submittal, the Landscape Plan shown provides additional landscape above the City standard in order to meet the requirements. Also site plan setbacks have been increased on the South, East and North sides of the site beyond the City standards. Bicycle parking is proposed near the front door. 0 Chase Bank at Rigden Farm, PDP, #2&09 September 28, 2009 Administrative Hearing Page 5 a. The proposal complies with Section 3.5.3(B)(1) in that it opens directly onto a connecting walkway with the pedestrian frontage along Timberline Dr. b. The proposal meets the Exception Criteria for Section 3.5.3(13)(2)(b), which is the "build -to" line requirement. This property is constrained by landform to the north and west by a landscaped tract that abuts Timberline Rd and Custer Dr. The Project Development Plan does not comply with the following General Development Standards: A. Division 3.2, Site Planning and Design Standards 1. Section 3.2.1, Landscaping and Tree Protection a. Section 3.2.1(D)(3) in that no one species of tree on the development plan exceeds 33% of the total of 29 trees on -site. The plan as submitted has one species accounting for 38% of total tree species. Staff is recommending compliance with this Section be a Condition of Approval. ALTERNATIVE COMPLIANCE (taken from Section 3.2.2(K)(3) of the LUC) A. Alternative Compliance. Upon written request by the applicant, the decision maker may approve an alternative parking ratio that may be substituted in whole or in part for a ratio meeting the standards of this Section. (a) Procedure. Alternative compliance parking ratio plans shall be prepared and submitted in accordance with the submittal requirements for plans as set forth in this Section. Each such plan shall clearly identify and discuss the modifications and alternatives proposed and the ways in which the plan will better accomplish the purpose of this Section than would a plan which complies with the standards of this Section. The request for alternative compliance must be accompanied by either a traffic impact study containing a trip generation analysis or by other relevant data describing the traffic impacts of any proposed recreational or institutional land use or activity. (b) Review Criteria. To approve an alternative plan, the decision maker must first find that the proposed alternative plan accomplishes the purposes of this Section equally well or better than would a plan which complies with the standards of this Section. In reviewing the request for an alternative parking ratio plan in order to determine whether it accomplishes the purposes of this Section, as required above, the .01 Chase Bank at Rigden Farm, PDP, #26-09 September 28, 2009 Administrative Hearing Page 4 b. The proposal complies with Section 3.2.2(C)(5) in that it provides direct, safe, and continuous walkways and bicycle connections to major pedestrian and bicycle destinations in the surrounding area. c. The proposal complies with Section 3.2.2(D) in that it provides for safe, convenient, and efficient bicycle, pedestrian, and vehicular movement to and through the site. Vehicular access will occur via a shared north/south access from Custer Dr into the Timberline Church parking lot and an east/west access to Illinois Dr. d. The proposal has submitted an alternative compliance request to Section 3.2.2(K)(2)(a), which will be discussed in more detail in the ALTERNATIVE COMPLIANCE Section of this report. e. The proposal complies with Section 3.2.2(M)(1) in that it has approximately 7% landscaped area interior to the parking lot, exceeding the minimum requirement of 6%. 3. Section 3.2.4, Site Lighting a. The proposal complies with Design Standards of this Section. B. Division 3.3, Engineering Standards 1. Section 3.3.5, Engineering Design Standards a. The proposal complies with the design standards, requirements, and specifications for the services as set forth in this section. C. Division 3.5, Building Standards 1. Section 3.5.1, Building and Project Compatibility a. The proposal complies with Section 3.5.1(D) in that it provides a connecting walkway with a direct pedestrian connection to Timberline Rd. without requiring pedestrians to walk through the parking area or cross a driveway. b. The proposal complies with Sections 3.5.1(B), (C) and (E). The building will be a 1-story structure with both sloped and flat roofs on portions of the building. The building will vary in height, with the maximum height at the peak of one tower -like element being 28' high. Building materials will be a combination of split face CMU, brick veneer and Exterior Insulation Finish System (stucco). The roofing material will be asphalt roof shingles and prefinished metal. The building's architectural character, scale and mass, and materials will be compatible with existing buildings in the surrounding area. 2. Section 3.5.3, Mixed Use, Institutional and Commercial Buildings 4