Loading...
HomeMy WebLinkAboutCHASE BANK @ RIGDEN FARM - PDP - 26-09 - CORRESPONDENCE - (8)of Fort Collins UTILITIES Rob Irish, (970)224-6167, drish fcgov.com 1. Light & Power has existing electric facilities running along the East side of Timberline and the North side of Custer Dr. 2. Any relocation or modification to existing electric facilities will be at the owners expense. 3. Owner will need to coordinate with Light & Power a transformer location within 10' of an all weather drive over surface. 4. Owner will need to provide a C-1 form and a One -line diagram with power requirements. 5. Must maintain 3' of clearance on the back and sides of the transformer and 8' of clearance in the front. 6. Electric Capacity Fees and Building, Site charges will apply to this development. WASTEWATER Roger Buffington, (970)221-6854, rbuffington(cDfcaov.com 1. Existing mains: 12-inch water main in Custer, 8-inch sewer in Custer east of the proposed drive entrance. 2. In addition to the existing mains listed, the proposed Rigden Farm 15th filing includes water and sewer improvements which could provide service to this lot. 3. Development fees and water rights will be due at building permit. G City of Have appropriate maintenance agreements that are legally binding and enforceable. Be designated on the plat as an Emergency Access Easement. Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at least one long side of the building when the structures is three or more stories in height). If the building is equipped throughout with an approved automatic fire -sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. PLEASE NOTE: The EAE looks excellent, thank you. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D BUILDING AREA - Proposed buildings that exceed 5,000 square feet for Type V construction shall be fire contained or fire sprinklered. 2006 International Fire Code New Table 903.1 and Section 702 STORMWATER Glen Schlueter, (970)224-6065, gschlueter&fcgov.com 1. A drainage and erosion control report/letter and construction plans are required and must be prepared by a Professional Engineer registered in Colorado. In this case, the report is verification of compliance with the overall drainage study for Rigden Farm. The letter needs to show that the impervious area is equal to or less than that used in the overall drainage study. Drainage patterns and flows to the concentration points must also be provided and must show compliance with the original study. If there are any changes from the original approved system, the design engineer must show how the changes are to be mitigated. The erosion control security deposit amount needs to be included in the letter at final compliance. 2. Water quality treatment is provided in the original drainage system design; however, onsite treatment is recommended as described in the Urban Storm Drainage Criteria Manual, Volume 3 — Best Management Practices (BMPs). 3. The storm sewer outfall system is in place. 4. The design of this site must conform to the drainage basin design of the Foothills Drainage Master Drainage Plan as well the City's Design Criteria and Construction standards. 5. The city wide development fee is $4,420/acre ($0.1015/sq.ft.) for new impervious area over 350 sq.-ft. No fee is charged for existing impervious area. This fee is to be paid at the time each building permit is issued. TRANSPORTATION PLANNING Matthew Wempe, (970)221-2643, mwempe .fcgov.com 1. It is my understanding that the site plan is already changing from what was submitted. My comments are general guides. 2. Code requires a connection from the sidewalk to the front of the building. One way to accomplish this for both phases would be a sidewalk along the north/south access drive. These can typically be accommodated in landscape islands, which also provide a buffer. 3. Directional ADA ramps would be required at any pedestrian crossing. Stripping is not required in short distances, though longer distances may require some form. City of Fort Collins 5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). 6. This project is responsible for dedicating any right-of-way and easements necessary to serve this project. 7. A repay on this project maybe due for Timberline, please contact Matt Baker at 970-221-6605. 8. Utility plans and a development agreement will be required for this project. 9. A Development Construction Permit (DCP) must obtained prior to starting any work on the site. 10. Parking stall widths, depths and drive aisles must be designed in accordance with Chapter 19 of LCUASS. 11. The requirement for a connecting sidewalk from the building to the public street without crossing a drive aisle may change the overall layout of the site and consequently may trigger other engineering comments. It is suggested that another conceptual review meeting be held so that all departments may again comment on the layout. It is possible that you could coordinate with everyone separately but this may be challenging (although not impossible) for you. POUDRE FIRE AUTHORITY Carle Dann, (970)416-2869, cdaniriftoudre-fire.org PLEASE NOTE: These comments essentially duplicate comments I made during the plat project. WATER SUPPLY - Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: Commercial, 1,500 gpm at 20 psi residual pressure, spaced not farther than 300 feet to the building, on 600-foot centers thereafter; residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not farther than 400 feet to the building, on 800-foot centers thereafter; residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not farther than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. PLEASE NOTE: The proposed hydrant location south of Custer Drive and west of the private drive/EAE is suitable. 2006 International Fire Code 508.1 and Appendix B. 2. ADDRESS NUMERALS - Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). PLEASE NOTE: The building likely will be addressed off of Custer Drive. 2006 International Fire Code 505.1 3. REQUIRED ACCESS - Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the PFA's jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: - Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. Foty of ,otl, ins CURRENT PLANNING Contact: Emma McArdle, (970)221-6206, emcardle(&fcgov.com 1. Please see the Development Review Guide at www.Legov.com/drg. This online guide features a color -coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. 2. The entire Fort Collins Land Use Code (LUC) is available for your review on the web at http://www.colocode.com/ftcollins/Ianduse/begin.htm. 3. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards, and Division 4.23 Neighborhood Commercial District (NC). 4. 1 will have more detailed comments on the PDP once I have more detailed plans to review. 5. An exhaustive list of submittal requirements for PDPs is available at: http://fcqov.com/currentplanninq/pdf/project-dev-plan.pdf. There is a submittal checklist at http://fcgov.com/currentplanninq/pdf/pdp.pdf. 6. When you are ready to submit your formal Project Development Plan (PDP), please make an appointment with Neighborhood and Building Services at (970)221-6750. 7. The proposed use is permitted in the NC District as a Type 1 review and public hearing. The applicant for this development request is not required to hold a neighborhood information meeting prior to formal submittal of the project, but staff highly recommends having one. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact Emma McArdle, at 221-6206, to assist you in setting a date, time, and location, if you decide to hold a neighborhood meeting. Emma, and possibly other City staff, would be present to facilitate the meeting. 8. Please contact me with any questions along the way. CURRENT PLANNING Dana Leavitte, (970)221.6143, dleavitte@fcgov.com 1. Green building has become a standard for new development in Fort Collins. The city has a Green Building website (http://www.fcgov.com/greenbuildingn that will be beneficial to your project during the design and construction of the property, In particular, the following program may help with designing an energy efficient structure: http://www.fcgov.com/conservation/biz-idap.php. ENGINEERING Susan Joy, (970)221.7656, siov@fcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 221-6108 if you have any questions. 2. Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see http://www.fcgov.com/engineering/dev-review.php 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 4. Please contact Joe Olson and Transportation Planning to schedule a scoping meeting and determine if a traffic study is needed for this project. of Fort Collins CONCEPTUAL REVIEW STAFF COMMENTS Meeting Date: April 27, 2009 Item: Chase Bank @ Rigden Farm 15th Filing Applicant: Kris Saline CLC Associates, Inc. 8480 E Orchard Rd #2000 Greenwood Village, CO 80111 Land Use Data: Request for a Chase Bank branch to be located on lot 1 of Rigden Farm 15m Filing, which is in the process of being replatted. The property is located on the southeast comer of S Timberline Rd and Custer Dr and is in the NC, Neighborhood Commercial zone district. The surrounding properties are zoned NC to the north and east, LMN, Low Density Mixed -Use Neighborhood, to the south and RL, Low Density Residential to the west. The proposed use is permitted in the NC District, subject to administrative review (Land Use Code, Section 4.23(13)(2)(c)9.). Comments: ZONING Contact: Jenny Nuckols, (970)416.2313, jnuckols(afcgov.com 1. Zoned NC. 2. Bank is a Type 1 use. 3. Maximum number of parking spaces is 3.511000 s.f. of floor area. 4000 s.f. bank =14. It looks IikE there are 16 spaces. 4. Minimum building height is 20'. The building shown is less than that. 5. Location doesn't comply with the build -to -line standard in 3.5.3. But it looks like one of the exceptions might apply. 6. A minimum of one handicapped parking space is required and needs to be an over all width of 16 feet and signed as van accessible, located near the main entrance. 7. Please provide bicycle parking, show location of bike rack and note the number of bikes it will accommodate. 8. Note trash enclosure placement, ensure that it is of adequate size to also house recyclables, provide elevation of trash enclosure - materials should match those of the primary building 9. Provide a detailed landscape plan which complies with landscape requirements set forth in Article 3. 10. Please remove actual signage from the building elevations. Only note the location of the signage, not the actual signs. Also note location of any ground sign on the site plan. All signage will go through a separate review and permitting process with the Zoning Department. Fort Collins May 4, 2009 Kris Saline CLC Associates, Inc. 8480 E Orchard Rd #2000 Greenwood Village, CO 80111 Dear Kris, Current Planning 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/current planning Attached, please see a copy of Staffs comments concerning the request for Chase Bank @ Rigden Farms, which was presented before the Conceptual Review Team on April 27, 2009. This is a request for a Chase Bank branch to be located on lot 1 of Rigden Farm 15m Filing, which is in the process of being replatted. The property is located on the southeast comer of S Timberline Rd and Custer Dr and is in the NC, Neighborhood Commercial zone district. The surrounding properties are zoned NC to the north and east, LMN, Low Density Mixed -Use Neighborhood, to the south and RL, Low Density Residential to the west. The proposed use is permitted in the NC District, subject to administrative review (Land Use Code, Section 4.23(B)(2)(c)9.). The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments please feel free to contact me at 221-6206. Sincerely, Emma McArdle City Planner CC: Jenny Nuckols, Zoning Dana Leavitte, Current Planning Susan Joy, Engineering Carte Dann, Poudre Fire Authority Glen Schleuter, Stormwater Matthew Wempe, Transportation Planning Rob Irish, Utilities Roger Buffington, Wastewater