Loading...
HomeMy WebLinkAboutINTERCHANGE BUSINESS PARK REPLAT - PDP - 3-10 - CORRESPONDENCE -so Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 17 Created: 1 /27/2010 PFA has no comments regarding the amended plat. However, at the time specific structures are proposed, I will provide comments including, but not limited to, water supply, emergency vehicle access, addressing, fixed fire protection and other PFA requirements that must be met. Department: Transportation Planning Issue Contact: Jennifer Petrik Topic: General Number: 18 Created: 1 /28/2010 [1/28/10] Detached sidewalk width of 5' and parkway width of 8' will be required in an access easement for the PDP. This can either be accomplished by an access easement on this plat or by separate document at a later date. Department: Technical Services Topic: Plat Number: 10 [1/27/10] The boundary closes. Issue Contact: Jeff County Created: 1 /27/2010 Number: 11 Created: 1 /27/2010 [1/27/10] Please remove "Amended Plat Of' from the title. Per our discussion and emails, "Interchange Business,Park, Filing 2" may be used as a title. Number: 12 Created: 1/27/2010 [1/27/10] Not all of the outer boundary monuments are described. Number: 13 Created: 1 /27/2010 [1/27/10] Please change the lot numbering to Lots 1 & 2. Number: 14 Created: 1 /27/2010 [1/27/10] Please remove all setback lines & notes. Number: 15 Created: 1 /27/2010 [1/27/10] Please add a note vacating existing easements & re -dedicating as shown hereon. Department: Zoning Issue Contact: Jenny Nuckols Topic: ZONING Number: 2 Created: 1 /26/2010 [1/26/10] No comments If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Emma McArdle City Planner Page 2 40 t Collins Jim Mokler Realtec 123 N College Ave, Suite 350 Fort Collins, CO 80524 STAFF PROJECT REVIEW Date: 1 /29/2010 Staff has reviewed your submittal for INTERCHANGE BUSINESS PARK, LOTS 15 & 16 REPLAT PDP - TYPE I (RE: AIR CARE COLORADO - ENVIROTEST), and we offer the following comments: ISSUES: Department: Current Planning Topic: Environmental Planner Number: 1 [1/20/10] No comments. Issue Contact: Dana Leavitt Created: 1 /20/2010 Department: Engineering Issue Contact: Andrew Carney Topic: General Number: 3 Created: 1 /26/2010 [1/26/10] Please remove the building setback lines and notes from the plat, they are not required. Number: 4 Created: 1 /26/2010 [1/26/10] Please clearly label the "new" lot line as being dedicated by this plat. Number: 5 Created: 1 /26/2010 [1/26/10] Sidewalks will be required along the Air Care Colorado project frontage and will be required to be either within the ROW or an access easement. If an access easement is needed, it can either be dedicated with the plat or by separate document. Please refer to Transportation Planning's comments regarding the sidewalk width and parkway requirements. Number: 6 Created: 1 /26/2010 [1/26/10] If any additional easements or ROW is required through the approval of the Air Care Colorado project, they will need to be dedicated by separate document and will be subject to all associated fees. Number: 7 Created: 1 /26/2010 [1/26/10] This plat is subject to any requirements that CDOT has regarding ROW width, access points, cross -lot access, and/or the removal of any turn lanes. Number: 8 Created: 1 /26/2010 [1/26/10] The Transportation Development Review Fee (TDRF) has not been paid for this replat. Please contact Andrew Carney (221-6501) if you have any questions regarding the fees. Number: 9 Created: 1 /26/2010 [1/26/10] Is the 15 foot utility easement along the frontage road existing? If so, please provide the reception number for the easement. Page 1