Number; 77 Created. 212312010
[2123110] The swale along the western property line has proposed trees in the
flowline and is at a .5% slope. Care needs to betaken to make sure the swale will
still drain the low flows and still receive the benefits of the parking lot drainage
watering the landscaping. Amending the soil may be required to accomplish this.
A note has been added to the landscape plan to plant the trees flush with the
flowline of the bioretention Swale. Notes on soils mitigation notes have been
added to the Landscape plans 3/10/2010.
Number: 78 Created: 212312010
[2123110] The swale on the east side of the building is at a .5% slope. Pans are
normally required for any slope below 2%.
As discussed on March 2° . the concern on material was from a maintenance
stand point. Discussions have accorded with the developer and they
acknowledge that maintenance will be required, but would still like to use cobble
in this area. Due to the fact that this is a small commercial area, and privately
owned and maintained, it was agreed that cobble could be used in place of a
concrete pan 3/10/2010.
Number: 79 Created: 212312010
[2123110] Please provide WQ calcs documenting how much area is being treated
even though on -site WQ treatment is not required.
As discussed on March 2"',, it was agreed that water quality calculations were
not required with the retention Swale 3/10/2010.
Number: 80 Created: 212312010
[2123110] Please label grading plan as drainage plan as well.
The label has been revised to incorporate drainage 3/10/2010.
Number: 81 Created: 2/23/2010
(2/23/10] Please provide 3 stamped drainage reports with the mylars. One emailed
copy of the drainage report is fine for a quick look before submitting mylars.
As email has been submitted prior to molars. Three (3) stamped and signed
drainage reports will be supplied upon submitting of mvlars 3110/2010.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 55 Created: 1212212009
[2/23/10] Add tracer wire and locator station details.
Detail 25 and 30 have been added to sheet D2 3/10/2010.
[12/22/09] Add applicable Standard Details at Final Compliance.
All applicable details have been added to the construction set 3/10/2010.
Page 5
Department: Technical Services Issue Contact: Jeff County
Topic: General
Number: 72 Created. 212312010
[2123110] All site & landscape plans look good. No utility plans were routed.
No response required 311012010
Number: 73 Created: 212312010
[212311O] Please correct the typo in the legal description for the emergency access
easement.
The Legal Description has been revised
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Landscape Plan
Number: 56 Created: 1212212009
[21231101 Water/sewer services and fire line are NOT on the plan that was
submitted.
[12122109] Show water/sewer services on landscape plan and maintain landscape
separation distances.
Water/Sewer services are shown on both sheet LP-101 and sheet LP-102.
3/10/2010
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 74 Created: 212312010
[2123110] Please provide a detail for the water quality feature. The rain garden
should have amended soil to function properly. Even though on -site WQ is not
required, the rain garden needs to function properly and not be a nuisance.
A note has been added to sheet LP-102 directina the contractor to mitiaate all
soil and amend, to promote percolation in the bioretention swale. 3/10/2010
Number: 75 Created: 212312010
[2123110] Please clarify how and where the rain garden will spill. A defined spillway
should be designed to make sure no flows enter the property to the south.
Slope arrows. as well as existing spot elevations have been added to sheet G1 to
clarify the spillway location. Existing slope direction arrows have been added to
the alley to show existing drainage patterns 3/1012010.
Number: 76 Created: 212312010
[2123110] The contours along the western swale and within the rain garden are not
consistent with the spot elevations. Please clarify.
The contour labels have been revised
Page 4
Department: Forestry Issue Contact: Tim Buchanan
Topic: General
Number: 83 Created: 212412010
[2124110] In a recent site meeting with the applicant it was determined that they will
not be able to retain a large Honeylocust on the west side of the existing building.
Three additional upsized mitigation trees will be required for this tree. This is in
addition to the 7 already shown on the plans.
Three additional mitigation trees have been noted on sheet LP-102. These trees
are located along the south edge of the site. 3/10/2010
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
Number: 1 Created: 1111112009
[2/1/10]
[11/11109] Records indicate that the existing electric service to the building is 600
amps at 1201208 volt three phase. If this service needs to be increased, changed,
and/or relocated, electric charges will apply. Please contact Light & Power at
(970)221-6700 to coordinate power requirements.
The Architects' Studio has submitted a C-1 form to Light & Power and has
received an estimate of fees. 3/1012010
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 29 Created: 1112412009
[2124110] Thank you for noting the Emergency Access Easement and including the
legal description (Exhibit A), and for noting the Knox Boxes and remote FDC. I have
no additional comments or concerns at this time.
Thank you for your responses dated Nov. 4, 2009. Most fire -department -related
issues have been resolved, due to our meetings and correspondence prior to now.
The fire line requirement seems to have been resolved after involving Roger
Buffington, as well. Also, a water -flow test showed that there is a fire hydrant within
300 feet that meets the minimum flow/residual pressure requirement of 1,500
gpm/20 psi. However, at some point in the future if the 4-inch water line is replaced,
PFA would like the hydrant on this line (Meldrum and Olive streets) to be moved one
block north, to Oak and Meldrum streets). This likely won't be an Otter Box issue at
that point, so this is more of a written record on the part of PFA to request the
hydrant location change.
No response required 3/10/2010
Department: Transportation Planning Issue Contact: Jennifer Petrik
Topic: General
Number: 82 Created: 212312010
[2/23/10] No comments.
No response required 311012010
Page 3
Number: 67 Created: 212112010
[2121110] A Legend would be nice to help decipher the many different fills and line
types, or please add labels for site boundary and line of 2nd level.
A leaend has been added to the Site Plan FDP-01 3/10/2010
Number: 68 Created: 212112010
j2/21/10] Change Director of Current Planning to Director of Community
Development and Neighborhood Services.
This revision to the signature block is done. 3/10/2010
Department: Engineering Issue Contact: Andrew Carney
Topic: General
Number: 61 Created: 1212312009
[2123110] Comment carried forward.
[121231091 On the curved portion of the porch that is very near the ROW line on the
East side of the property, please make sure that no footings or structures are within
the ROW.
There will be no intrusion into the ROW by the porch or any other part of the
building. A note has been added to the Site Plan (FDP 02) stating this.
3/10/2010
Number: 62 Created: 1212312009
[2123110] Comment carried forward.
[12123109] Is any special colored or textured concrete proposed for the section of
concrete that is on the east side of the building that ties into the sidewalk? If so,
some language may need to be included in the Development Agreement that
identifies that neither the city nor utilities are responsible for replacing the
"upgraded" concrete should it need to be removed and replaced.
There will be no special colored or textured concrete proposed for the concrete
slabs referred to in this comment. The Development Agreement will include a
paraqraph as suqqested to clarify the City of Fort Collins's . 3/10/2010
Number. 63 Created: 211912010
P19110] Included with my comments are the applications for both the Development
Agreement as well as a Development Construction Permit. Once completed and
returned to the Engineering department, I may begin both items.
Acknowledaed _ 3/1012010.
Number: 64 Created. 211912010
[2119110] It appears as if the posts used with the proposed fence protrude over the
property and ROW lines on the North, West, and South sides of the project. It may
however just be the line weight used etc, however the fence structure is not allowed
in either RO W or on the adjacent property owners without their permission.
The drawinas have been adiusted and noted clearly that the entire fence.
including the posts will be within the propertv limits of the applicant's propertv.
MrilhliTirf
Page 2
Fort Collins STAFF PROJECT REVIEW
Otter Properties LLLP Date: 212512010
%Curt Richardson
#1 Old Town Square Suite 300
Fort Collins CO 80524
APPLICANT RESPONSE Date: 3/10/2010
Staff has reviewed your submittal for Otter Box Corporate Headquarters PDP Type 11
and we offer the following comments. -
Applicant responses shown thus after each comment 3/1012010
With this Final Plan re -submittal.
ISSUES:
Department: Advance Planning Issue Contact: Emma McArdle
Topic: Landscape Plan
Number: 69 Created: 212112010
P21/10] Please update all plans to show removal of tree behind building.
Removal of existing tree on west side of building has been shown/noted on
sheet LP-101 3/10/2010
Number: 70 Created: 212112010
[2121110] Please add method of transplant on the Tree Protection and Mitigation
Plan.
Method of tree transplant/relocation note has been added to sheet LP-101
3/10/2010
Number: 71 Created: 212112010
[2121110] Please add the Existing Tree border to the Legend.
Existing tree border has been added to the legend on sheet LP-102
311012010
Topic: Site Plan
Number: 65 Created: 212112010
P21/10] Can you please call out the Site Boundary and label the ROW dimensions
(alley and Meldrum).
Applicant responses shown thus after each comment 3/10/2010
With this Final Plan review submittal.
Number: 66 Created: 212112010
[2121110] Please update plans to remove tree in rear of building.
The tree has been removed from the Site Plan FDP-01 3/10/2010