HomeMy WebLinkAboutCHASE BANK @ RIGDEN FARM - PDP - 26-09 - CORRESPONDENCE - (3)Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 16 Created: 8/13/2009
[8/13/09] Ready for hearing. Comments may follow during final compliance.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterMastewater
Number: 12 Created: 8/10/2009
[8/10/09] Refer to comments on the most recent review of Rigden Farm 15th and
incorporate those changes into this project.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 4 Created: 7/29/2009
[7/29/09] Parking Data Table - Alternative compliance: Please see 3.2.2(K) for Review
Criteria. How old is the study that is being referenced from the ULI? I question the need for
almost double the allowed parking spaces as a large majority of people don't even really go
into banks to do business anymore. Its mostly done online.
Number: 5 Created: 7/30/2009
[7/30/09] Landscape Plan: Please add a note to the landscape regarding installation of
landscaping prior to issuance of a CO.
Number: 6 Created: 7/30/2009
[7/30/09] Landscape plan: Foundation planting is required along at least 50% of high -
visibility areas of the building exterior. 3.2.1(E)(2)(d). West side of building along Timberline
- please show foundation plantings.
Number: 7 Created: 7/30/2009
[7/30/09] Elevations: Please show any light fixtures that are proposed on the building.
Building lighting needs to be down -directional and shielded so as to not spill out beyond
property lines.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
Emma McArdle
City Planner
Page 3
the streetlight on Custer at the driveway. If Light & Power construction is in an area already
landscaped, landscape repairs will be the responsibility of others.
Topic: Utility Plan
Number: 1 Created: 7/29/2009
[7/29/09] The location shown for the electric transformer is acceptable
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 17 Created: 8/13/2009
EMERGENCY VEHICLE ACCESS: Please note: Because the layout changed and we no
longer are taking access from the drive-thru and the building exceeds the maximum
distance to be considered within access, either an emergency access easement or
automatic fire sprinklers will be required.
Fire access roads (fire lanes) shall be provided for every facility, building or portion of a
building hereafter constructed or moved into or within the PFA's jurisdiction when any
portion of the facility or any portion of an exterior wall of the first story of the building is
located more than 150 feet from fire apparatus access as measured by an approved route
around the exterior of the building or facility. This fire lane shall be visible by painting and
signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for
approval prior to installation. In addition to the design criteria already contained in relevant
standards and policies, any new fire lane must meet the following general requirements:
❑ Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of
supporting fire apparatus weights. Compacted road base shall be used only for temporary
fire lanes or at construction sites.
❑ Have appropriate maintenance agreements that are legally binding and enforceable.
❑ Be designated on the plat as an Emergency Access Easement.
❑ Maintain the required minimum width of 20 feet throughout the length of the fire lane
(30 feet on at least one long side of the building when the structures is three or more stories
in height).
If the building is equipped throughout with an approved automatic fire -sprinkler system, the
fire code official is authorized to increase the dimension of 150 feet.
2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D
Number: 18 Created: 8/13/2009
ADDRESSING: Because other structures within the complex are addressed off Timberline
Road, we will accept the bank also having a Timberline address. Please follow the address
locations I included at the staff review meeting. The numerals are required on the west side
of the building and also south (side of main entrance).
Department: Technical Services Issue Contact: Jeff County
Topic: Site Plan
Number: 14 Created: 8/12/2009
[8/12/09] The site plan has line over text issues. See redlines.
Number: 15 Created: 8/12/2009
[8/12/09] Benchmark #1 has an incorrect elevation. It has been adjusted, see redlines for
the new elevation. Please call the City Surveying Department @ 221-6605, for an updated
copy of the Vertical Control Network.
Page 2
City of
Fort Collins
KRIS SALINE
CLC ASSOCIATES, INC.
8480 E. ORCHARD RD. #2000
GREENWOOD VILLAGE, CO 80111
STAFF PROJECT REVIEW
Date: 8/17/2009
Staff has reviewed your submittal for CHASE BANK AT RIGDEN FARM PDP - TYPE I, and
we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Emma McArdle
Topic: Landscape Plan
Number: 11 Created: 8/7/2009
[8/7/09] What will be in the planting areas? Rocks, mulch....
Topic: Site Plan
Number: 9 Created: 8/7/2009
[8/7/09] Please add a Max Building Height note on the Site Plan.
Number: 10 Created: 8/7/2009
[8/7/09] Is there to be any signs in the landscaped areas? If so please show on site plan.
Topic: Written Submittal
Number: 8 Created: 8/7/2009
[8/7/09] 1 have some comments on the format of the Exception and Alternative Compliance
Requests. Please provide a subtitle for each request, referencing the Section. I will send
back my redlined copy for you to see.
Department: Current Planning
Topic: General
Number: 13
[8/11/09] No comments.
Issue Contact: Dana Leavitt
Created: 8/11 /2009
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 2 Created: 7/29/2009
[7/29/09] Light & Power Engineering will need a Commercial Service (C-1) form completed
and provided directly to Light & Power Engineering (not via Building Inspection).
Number: 3 Created: 7/29/2009
[7/29/09] Electric Development charges will apply, and will be a separate invoice, not a part
of other building permit fees. There will be two invoices, each for 1/2 of the Light & Power
charges. The 1st 1/2 will be payable before Light & Power work can be scheduled, with the
remaining 1/2 payable before the electric system can be energized. Light & Power
Engineering will need the name & address of where to send the invoices. Additional
charges from Light & Power will apply for electric system modifications, such as relocation of