Loading...
HomeMy WebLinkAboutCHASE BANK @ RIGDEN FARM - PDP - 26-09 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW0 1. Light & Power has existing electric facilities running along the East side of Timberline and the North side of Custer Dr. • See the proposed transformer location. 2. Any relocation or modification to existing electric facilities will be at the owners expense. • Comments noted. 3. Owner will need to coordinate with Light & Power a transformer location within 10' of an all weather drive over surface. • See the Proposed transformer location . 4. Owner will need to provide a C-1 form and a One -line diagram with power requirements. • Comment noted - can this be submitted with the Building Department Submittal or do you want this sooner ?. 5. Must maintain 3' of clearance on the back and sides of the transformer and 8' of clearance in the front. • See the dashed line around the proposed transformer location . 6. Electric Capacity Fees and Building Site charges will apply to this development. • Comments noted - can these be paid at the time of the Building permit.. WASTEWATER Roger Buffington, (970)221-6854, rbuffington(&fcgov.com 1. Existing mains: 12-inch water main in Custer, 8-inch sewer in Custer east of the proposed drive entrance. • Comments noted. 2. In addition to the existing mains listed, the proposed Rigden Farm 151h filing includes water and sewer improvements which could provide service to this lot. • Were are working with that submittal and the Developer to coordinated services for this LOT. 3. Development fees and water rights will be due at building permit. • Comments noted. This set of PDP Plans and Utility Plans are being submitted, so the City can verify that the appropriate changes have been made base on the Concept Review comments. Should you have questions or need clarification on anything, please do not hesitate to contact us. Sincerely, C = Inc. Kris Saline Project Manager R J 4. BUILDING AREA -Proposed buildings that exceed 5,000 square feet for Type V construction shall be fire contained or fire sprinklered. 2006 International Fire Code New Table 903.1 and Section 702 The building area is 4,195 s.f.. STORMWATER Glen Schlueter, (970)224-6065, gschlueter(&Jcgov.com 1. A drainage and erosion control report/letter and construction plans are required and must be prepared by a Professional Engineer registered in Colorado. In this case, the report is verification of compliance with the overall drainage study for Rigden Farm. The letter needs to show that the impervious area is equal to or less than that used in the overall drainage study. Drainage patterns and flows to the concentration points must also be provided and must show compliance with the original study. If there are any changes from the original approved system, the design engineer must show how the changes are to be mitigated. The erosion control security deposit amount needs to be included in the letter at final compliance. • Drainage Report and Erosion Control Report will be submitted. 2. Water quality treatment is provided in the original drainage system design; however, onsite treatment is recommended as described in the Urban Storm Drainage Criteria Manual, Volume 3 — Best Management Practices (BMPs). • The Erosion Control Report and plan direct the use of BMPs. 3. The storm sewer outfall system is in place. • Water quality and detention are provided downstream per the Master Drainage Report. 4. The design of this site must conform to the drainage basin design of the Foothills Drainage Master Drainage Plan as well the City's Design Criteria and Construction standards. • Comments noted. 5. The city wide development fee is $4,420/acre ($0.1015/sq.ft.) for new impervious area over 350 sq.-ft. No fee is charged for existing impervious area, This fee is to be paid at the time each building permit is issued. • Comments noted — General contractor will pay at the time they pick up the permit for the building. TRANSPORTATION PLANNING Matthew Wempe, (970)221-2643, mwempe fcgov.com 1. It is my understanding that the site plan is already changing from what was submitted. My comments are general guides. • See the revised Site plan. 2. Code requires a connection from the sidewalk to the front of the building. One way to accomplish this for both phases would be a sidewalk along the north/south access drive. These can typically be accommodated in landscape islands, which also provide a buffer. • See the revised sidewalk locations. 3. Directional ADA ramps would be required at any pedestrian crossing. Stripping is not required in short distances, though longer distances may require some form. • See the revised sidewalk locations and proposed ramping. UTILITIES Rob Irish, (970)224-6167, rirish fcgov.com 5 PLEASE NOTE: These comments essentially duplicate comments I made during the plat project. 1. WATER SUPPLY - Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: Commercial, 1,500 gpm at 20 psi residual pressure, spaced not farther than 300 feet to the building, on 600-foot centers thereafter; residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not farther than 400 feet to the building, on 800-foot centers thereafter; residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not farther than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. PLEASE NOTE: The proposed hydrant location south of Custer Drive and west of the private drive/EAE is suitable. 2006 Intemational Fire Code 508.1 and Appendix B. • Comments noted. 2. ADDRESS NUMERALS - Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). PLEASE NOTE: The building likely will be addressed off of Custer Drive. 2006 International Fire Code 505.1 • Please see the proposed location of the address lettering, they are currently shown above the front entry. I think that they would also be required on the back side, it is requested that the Fire Department provide a preferred location of where they would like to see them shown. It is requested that the Addressing for this location be off of Timberline if possible, this was discussed with Carie Dann via e-mail with Emma on 5-21-09 via e-mail. 3. REQUIRED ACCESS - Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the PFA's jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: - Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. - Have appropriate maintenance agreements that are legally binding and enforceable. - Be designated on the plat as an Emergency Access Easement. - Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at least one long side of the building when the structures is three or more stories in height). If the building is equipped throughout with an approved automatic fire -sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. PLEASE NOTE: The EAE looks excellent, thank you. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D • Comments noted. 4 the design and construction of the property. In particular, the following program may help with designing an energy efficient structure: http://www.fcgov.com/conservation/biz-idap.php. a. Chase has incorporated many green building practices including low VOC paints and environmentally friendly finishes. ENGINEERING Susan Joy, (970)221-7656, sjoyPafcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 221-6108 if you have any questions. • Comments noted. 2. Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see http://www.fcgov.com/engineering/dev-review.php • See the check. 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. Comments noted. 4. Please contact Joe Olson and Transportation Planning to schedule a scoping meeting and determine if a traffic study is needed for this project. • Joe stated via e-mail on 5-14-09 that a traffic study would not be required. 5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). Public improvements will be designed per LCUASS standards. 6. This project is responsible for dedicating any right-of-way and easements necessary to serve this project. • Any right-of-way or easements will be dedicated as required. 7. A repay on this project maybe due for Timberline, please contact Matt Baker at 970-221-6605. • Comments noted. 8. Utility plans and a development agreement will be required for this project. • Seethe attached Plans. 9. A Development Construction Permit (DCP) must obtained prior to starting any work on the site. • Comments noted. 10. Parking stall widths, depths and drive aisles must be designed in accordance with Chapter 19 of LCUASS. • See the attached Site plans. 11. The requirement for a connecting sidewalk from the building to the public street without crossing a drive aisle may change the overall layout of the site and consequently may trigger other engineering comments. It is suggested that another conceptual review meeting be held so that all departments may again comment on the layout. It is possible that you could coordinate with everyone separately but this may be challenging (although not impossible) for you. • See the attached site plan Chase has revised the Site plan due to this comment, It was shown to the the planner on June 241h, Emma and Steve felt it was acceptable. POUDRE FIRE AUTHORITY Carie Dann, (970)416-2869, cdannna.poudre-fire.org CURRENT PLANNING Contact: Emma McArdle, (970)221-6206, emcardle(&fcgov.com 1. Please see the Development Review Guide at www.fcgov.com/drq. This online guide features a color -coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. • Responses. 2. The entire Fort Collins Land Use Code (LUC) is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. • Comment noted thanks for the link. 3. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards, and Division 4.23 Neighborhood Commercial District (NC). Comment noted. 4. 1 will have more detailed comments on the PDP once I have more detailed plans to review. • Comment noted. 5. An exhaustive list of submittal requirements for PDPs is available at: http://fcgov.com/currentplanning/pdf/project-dev-plan.pdf. There is a submittal checklist at hUp://fcqov.com/currentplanning/pdf/pdp.pdf. • Comments noted and is attached. 6. When you are ready to submit your formal Project Development Plan (PDP), please make an appointment with Neighborhood and Building Services at (970)221-6750. • Comment noted. 7. The proposed use is permitted in the NC District as a Type 1 review and public hearing. The applicant for this development request is not required to hold a neighborhood information meeting prior to formal submittal of the project, but staff highly recommends having one. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact Emma McArdle, at 221-6206, to assist you in setting a date, time, and location, if you decide to hold a neighborhood meeting. Emma, and possibly other City staff, would be present to facilitate the meeting. • Comments noted - will review with Chase the Owner. 8. Please contact me with any questions along the way. • Comments noted. CURRENT PLANNING Dana Leavitte, (970)221.6143, dleavitteoftclov.com 1. Green building has become a standard for new development in Fort Collins. The city has a Green Building website (http://www.fcgov.com/greenbuildinq/) that will be beneficial to your project during 2 Land Use Data: Request for a Chase Bank branch to be located on lot 1 of Rigden Farm 15th Filing, which is in the process of being replatted. The property is located on the southeast corner of S Timberline Rd and Custer Dr and is in the NC, Neighborhood Commercial zone district. The surrounding properties are zoned NC to the north and east, LMN, Low Density Mixed -Use Neighborhood, to the south and RL, Low Density Residential to the west. The proposed use is permitted in the NC District, subject to administrative review (Land Use Code, Section 4.23(13)(2)(c)9.). Comments: ZONING Contact: Jenny Nuckols, (970)416-2313, inuckols(&fcgov.com 1. Zoned NC. • Comment noted and understood. 2. Bank is a Type 1 use. • Comment noted. 3. Maximum number of parking spaces is 3.5/1000 s.f. of floor area, 4000 s.f. bank = 14. It looks like there are 16 spaces. • Per the City standard of 3.5/1000 a 4,195 s.f. building could have 14 spaces — because of there is not any off street parking the number could be increased to 17 (25% increase). After meeting with the planning staff and providing a ULI (Urban Land Institute) matrix showing that for a building this size would require parking for 13 customers and 7 employees. At This location Chase will have 14 employees, and we are showing 26 parking spaces, including handicap parking. - We are requesting an exception or variance for this which has been discussed in our follow up meetings at your office. 4. Minimum building height is 20'. The building shown is less than that. • Elevations have been revised to be 20' at the parapets as a minimum. 5. Location doesn't comply with the build -to -line standard in 3.5.3. But it looks like one of the exceptions might apply. • We have turned the building and the edge of the building is with in 5.69' of the property line, because of the curving property line and the existing Landscape in Tract 'A', - We are requesting / an exception or variance for this which has been discussed in our follow up meetings at your office. V6. A minimum of one handicapped parking space is required and needs to be an over all width of 16 feet and signed as van accessible, located near the main entrance. • See the proposed location . 7. Please provide bicycle parking, show location of bike rack and note the number of bikes it will accommodate. • See the proposed 3 place Bike Rack . 8. Note trash enclosure placement, ensure that it is of adequate size to also house recyclables, provide elevation of trash enclosure - materials should match those of the primary building • See the proposed location and elevations to match the building. 9. Provide a detailed landscape plan which complies with landscape requirements set forth in Article 3. • See the attached Landscape plan and Details. 10. Please remove actual signage from the building elevations. Only note the location of the signage, not the actual signs. Also note location of any ground sign on the site plan. All signage will go through a separate review and permitting process with the Zoning Department. • Comments noted. • Ec CLC ASSOCIATES July 22, 2009 Emma McAdle City of Fort Collins - Current Planning Division 281 North College Ave Fort Collins, CO 80537 970-221-6206 Re: Chase Bank @ Rigden Farms Dear Ms. McArdle. Please see our responses to your comments on May 4, 2009. An itemized response to City staff comments is required to be submitted with the resubmittal of the project. A resubmittal will not be accepted without the itemized response to staff comments. Attached, please see a copy of Staff's comments concerning the request for Chase Bank @ Rigden Farms, which was presented before the Conceptual Review Team on April 27, 2009. This is a request for a Chase Bank branch to be located on lot 1 of Rigden Farm 15th Filing, which is in the process of being replatted. The property is located on the southeast corner of S Timberline Rd and Custer Dr and is in the NC, Neighborhood Commercial zone district. The surrounding properties are zoned NC to the north and east, LMN, Low Density Mixed -Use Neighborhood, to the south and RL, Low Density Residential to the west. The proposed use is permitted in the NC District, subject to administrative review (Land Use Code, Section 4.23(13)(2)(c)9.). The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. CONCEPTUAL REVIEW STAFF COMMENTS Meeting Date: April 27, 2009 Item: Chase Bank @ Rigden Farm 15th Filing Applicant: Kris Saline CLC Associates, Inc. 8480 E Orchard Rd #2000 Greenwood Village, CO 80111