HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - PDP - PDP110018 - REPORTS - CORRESPONDENCE-HEARINGMEMORANDUM
TO: Ted Shepard, Project Planner
FROM: Lucia A. Liley
RE: Additional documentation for Staff Report (August 7, 2012 Administrative
Rehearing
Aspen Heights P.D.P. #110018
DATE: July 31, 2012
Attached is a hard copy of each of the following documents for inclusion in the record of the
August 7, 2012 Administrative rehearing, together with a CD that includes a pdf of each
document.
Neighborhood Meeting Summary dated January 10, 2011
Conceptual Review Staff Comments with responses dated August 2, 2011
Statement of Planning Objectives dated December 14, 2011
Preliminary Site Plan (Sheets 1 — 8)
Architectural elevations, Unit types A — E
Landscape Plan (Sheets 1 — 10)
Round No. 1 Comments and responses
Aerial of vicinity
Overall Site depiction
Site Plan
Depiction of tree mitigation and prairie dog habitat
Prairie Dog Removal Plan dated March 21, 2012
Depiction of wetlands
Depiction of tree upsizing
Depiction of off -site improvements
Depiction of tributary basin area to regional detention pond
NECCO Cost Breakdown Analysis dated 1/23/2011
Depiction of NECCO stormwater infrastructure
Letter of Understanding regarding Participation in NECCO Drainage Improvement Project
signed 4-5-12
Transportation Impact Study dated November 2011
Memo from Delich Associates dated March 16, 2012
City of Fort Collins Master Street Plan amended February 15, 2011
Ecological Characterization Study dated September 2011
Wetland Delineation Report dated November 2011
Aspen Heights Subdivision plat (3 sheets)
Preliminary Drainage Report dated March 26, 2012
Phase 1 Environmental Site Assessment dated October 31, 2011
Limited Site investigation dated December 5, 2011
Preliminary Geotechnical Exploration Report dated October 24, 2011
Floodplain Review Checklist
Utilities Checklist
Email from Laurie Kadrich to Eric Sutherland (regarding the hearing officer) dated July 24, 2012
Land Use Code Section 1.4.9(E) Delegation of Authority