HomeMy WebLinkAboutZIEGLER - HARVEST PARK - PDP - PDP120033 - REPORTS - ELEVATIONSNORTH ELEVATIL....,..., ..
SOUTH ELEVATION 6 PLEX "A" - COUNTY FAIR LANE EAST ELEVATION 6 PLEX "A"
uac.,T-.a rcmrmno xraE,T-,a ammo
SOUTH ELEVATION 5 PLEX "C"
xne ,n .,a ro-awu0
WEST ELEVATION 5 PLEX "C"
NORTH ELEVATION 5 PLEX "C"
EAST ELEVATION 5 FLEX "C" -ZIEGLER
x.ue u.�.v rvovwmE' u.ue„r-.a MG-31TE1
FINISH MATERIALS
ELEVATION SYSTEMS NOTES
R1 - PRE -FINISHED SLOPED ASPHALT SHINGLES
R2 - PRE -FINISHED METAL ROOFING
R3 - EXPOSED STAINED WOOD BEAMS/TRELLIS
W1 - SYNTHETIC STONE, MASONRY UNIT VENEER - CONCRETE
W2 - EXTERIOR STUCCO - (EIFS, HARDCOAT OR CEMENTITIOUS
HARD -BOARD PANEL, w/CONTROL JOINTS)
W3 - VERTICAL LAP AND/OR HORIZONTAL'ENGINEERED' SIDING
Cl -PRE-FINISHED COMPOSITE WINDOWS w/LowE GLAZING
C2 - INSULATED METAL DOORS, HANDRAILS, MISC. METALS,
(PAINT TO MATCH ADJACENT OR ACCENT SIDING)
ALL BASE BUILDING MATERIALS TO BE NATURAL EARTH TONES -
TAN, GRAY, CREAM, BROWN RANGES
BUILDING ACCENT COLORS TO BE MUTED, DUSTY' - GREEN,
TERRACOTTA, MUSTARD, TEAL
PRELIMINARY DEVELOPMENT PLAN
LOT 2, HARVEST PARK - ZIEGLER
MIXED USE
ARCHITECTURAL ELEVATIONS
FORT COLLINS, COLORADO
OF INVESTMENT GROUP, LLC.
4640 WITHERS DRIVE
FORT COLLINS, CO 60524
ARCHITECTURE 4710 SOUTH COLLEGE AVE.
SHEETS
FORT CCLUNE, CO. 6062S
WEST, L.L.C. (910)2074N424
DATE:
ARCHITECTURE/PLANNING
DECEMBER 5, 2012
MARCH 2O, 2013
MAY W. 2013