HomeMy WebLinkAbout912 WOOD ST. (PATEROS CREEK) - MOD - MOD120004 - REPORTS - CORRESPONDENCE-HEARING (17)a
912 WOOD STREET
LOCATED IN THE SOUTHWEST QUARTER OF SECTION 2, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6th P.M.
COUNTY OF LARIMER, STATE OF COLORADO
•
t
m
LEGEND
ILI
C
r. -
c
YYa[ u�. i,wMu IRY vW
O
[L
al Cl�
Zw
Rr4,[ nw 4rnY Is[I f:i0f1.11
I-
FIELD SIMVEY BY
iv!�aaYnc
.
BENCNNARKS
CR
N9- is
Y6
�. ��:�ma a. n-uvn if Muxam
�b P'
FEW REFERENCE
WYES.
_
p
�; YTmGte�r
H
w ...v. rw..
m
n
Z
i
LEY.L DWR"M
O1
O
a/i a v�Kiee i mw
rw t.mgm—,
0
LL
W INORTHERN
ENGINEERING
Mr. Eric Tracy, PE, CFM
Larimer County Engineering Department
200 West Oak Street, Suite 3000
Fort Collins, Colorado 80522
RE: 912 Wood Street
Floodplain Permit
Dear Mr. Tracy,
ADDRESS: PH0NE:970.221.4158 TE:
WEBSI
200 S. College Ave. Suite 10 WEBSIrthernengineering.com
Fort Collins, CO 80524 FAX: 970.221.4159
October 20, 2011
This letter and attached exhibit are intended to serve as the application to obtain a grading/development permit
for earthwork activities within the FEMA regulatory Cache la Poudre floodplain. The subject property is located
at the terminus of Wood Street approximately a quarter -mile north of the City of Fort Collins Utility Service _
Center. The site is owned by Sidehill Investment LLC.
The land owner wishes to perform minor excavation on a portion of the property, noted as "Excavation Area" on
the attached exhibit. The land owner also proposes to fill a portion of the property, noted as "Fill Area" on the
attached exhibit. The proposed fill area was previously mined for gravel and the intent is to restore the ground
to more closely match its historic condition.
There are actually two excavation areas; both of which are located outside of the Cache la Poudre 6-inch
floodway, and are within the 100-year flood fringe of the Poudre River. The first excavation will remove a berm
of concrete rubble. Said berm is not currently recognized by the floodplain modeling; therefore, there will be no
change to the effective floodplain boundaries. The second excavation area will expand a small pond in the
southeast corner of the property. The pond excavation is located in an ineffective flow area, and there will be
no effect to the floodplain boundary or base flood elevations as a result of the proposed excavation.
The fill area is also located outside of the Cache la Poudre 6-inch floodway, and is within the 100-year flood
fringe of the Poudre River. The proposed fill location is within a backwater area that does not convey water in
the principal downstream flood flow direction. By definition, fill can be placed in such ineffective flow areas
without obstructing any further conveyance and without changing water surface elevations, flow velocities, or
floodplain boundaries.
The proposed earthwork activities are allowed within the FEMA regulatory 100-year flood fringe for the Cache la
Poudre River. The will be no changes to the effective floodplain boundaries or base flood elevations as a result
of the excavations or fill. Be advised; however, that the land owner does intended to apply for a LOMR-F with
FEMA after the fill has been placed in order to revise the mapped flood fringe.
Please feel free to contact me or Nick Haws at 221.4158 with any questions you may have.
Sincerely,
NORTHERN NGINEERING SERVICES, INC.
Aar- on Cvar, PE
cc: Marsha Hilmes-Robinson, CFM - City of Fort Collins Floodplain Administrator
Gino Campana - Sidehill Investment LLC
enc.
Proposal Review Checklist
Site development plans are complete and depict flood hazard data
/ VJw x u t FUXOFV,11t3 ROW faixua)
V Engineering data is provided for proposed rimp-arid-Aeedvvay re-nsie"
_M Floodway certificate and data document no increase in flood heights
N/A Subdivision proposals minimize flood damage and protect utilities
Lowest floor elevations are at or above the 100 year base flood elevation
, A Manufactured homes address elevation and anchoring requirements
A flood proofing certificate has been submitted
Permit Action and Compliance Documentation
Permit Approved : The proposed project was reviewed and is in compliance with flood plain
management standards as established by FEMA and Larimer County
Permit Denied : The project was denied and information is in Flood Review Board files
Variance Granted : A variance to the 100 year base flood elevation was granted and
information is in Flood Review Board files
Variance Granted : A variance was granted from the Code for all or part of the 18 inch lowest
floor protection elevation
Elevation Certificate : A certificate was returned before a certificate of occupancy was issued
Food Proofing Certificate : Certification was returned before a certificate of occupancy was
issued
,�CO25wlood Plain Official's Signature
bate
Comments: iT IS A&TJrJlMJ3D IR4r ia6 Diu xdyey& 9 eadL 96?waeT _
NEW WeSEic 40AC=1A4 s}tL aL Tit►s C/71/L eaavG6X,4 f AW6 A FV4,L W67e*,,r-
Wt-L CC 145L&Ue) Pt1t"M 1ME Flu. Mft-VA - 70 ae r4&4W PV Tt+ti
F"M F,cluaX 4R.C4 067r,1W hs Frw ,tang 1 otNo F/ K. f xC4 Z. a� Are
kh*am PVrla MO FLL is 1v ( PW.9D 1N TUE Puxaft~ uxrnc. A
Ft" KP4AIT lS CSU90.
r
Flood Plain Development Permit
Permit Number_ - Fl P Date to 0 129 1 10
Owner 5►oeutt.L. t ►yesymNaT, LL , Phone_ 910- 27-9 - "OD
Address Ci12 W UU0 S'� file:r Gu.i w
Contractor C31No C.AMPANA (Co�1_ fAA7) Phone 9Z0-Z2A- 571CA3
Address V102Z W&3HFNTAti3 A C 5TE7 ZoI
Project Address/Location 12 Wig 6'jYLE�J-. ��T Cyt.l�Nl
Single Family Residence
Multi -Family Residence
Manufactured Home
Commercial
Project Description
New Construction Channelization Fill
Improvement >50% Bridge/Culvert _Levee
Improvement <50% Rehabilitation Other
Explanation: /V1ofIlL/7AT1oU� CGEAQIAl6. G2t1 EX69vs477 ._.OF E7rC4V4no0J 44M
f%ND EkGAritihw g46;1 Z,r AND ANY OrNigc. w00-K pRr-Poc To AAY
R-L r3Fw4 FEAR W tJH JrJ 114C Fttoo�P�n3 .
Flood Hazard Data
Watercourse Name�p/!�
The project is in the Floodway NV The project is in the Flood Fringe YE5
The 100 year base flood elevation for the project is \/A tUE5 - $6E ATf'ACAZO PLA' J
2.0
Lowest Floor Protection Elevation required add 4-5 feet N- fea woa*- QE LK PRsPosefl
Flood Proofing Elevation required
Source Documents: Reports/Maps used Q1rOto01 C o9'11C4 -Fiq4A Fis Pa261t,E jaR
From: Eric Tracy <tracye1(cDco.larimer.co.us>
To: Nick Haws <nickPa.northernengineering.com>
Sent: Thu, Oct 20, 2011 19:26:02 GMT+00:00
Subject: Re: floodplain permit for 912 Wood St.
Nick,
Sorry for the delayed response. I've attached the Floodplain Development Permit to this email. If you have any
questions, please let me know.
You fill out the front and I will fill out the back. The only item I will need under the checklist is a site plan
(basic grading plan) as we discussed in the field. The rest are not applicable in this situation.
Eric Tracy, PE, CFM
Larimer County Engineering Department
200 W. Oak St., Suite 3000
PO Box 1190
Fort Collins, CO 80521-1190
Phone: (970) 498-5729
On Wed, Oct 19, 2011 at 11:06 AM, Nick Haws <nick(a-)..northernen ineering com> wrote:
Eric,
I was wondering if the floodplain grading permit required any information from the land owner? I'm meeting
with Gino Campana at noon today, so if he needs to provide anything I'd like to coordinate with him at that
time.
Thanks!
Nick Haws, PE, LEED AP
NORTHERN ENGINEERING
200 South College Avenue, Suite 10 1 Fort Collins, Colorado 80524
0: 970.221.4158 ext. 5414 1 D: 970.568,5414 1 M: 970,690,0927
F: 970,221,41591 nick(ulnorthemengineerin¢.com I w .northemencineerin¢.corn
>rn
3
Again, thank you for the opportunity to provide feedback on the proposed plan. Feel free to call me with any questions
you have about the above comments.
Marsha
Marsha Hilmes-Robinson, CFM
Floodplain Administrator
City of Fort Collins utilities
P.O. Box 580
700 Wood Street
Fort Collins, CO 80522-0580
Phone: (970) 224-6036
E-Mail: mhilmesrobinsonafmov.com
From: Gino Campana [mailto:gcampana@bellisimoinc.com]
Sent: Thursday, October 20, 2011 2:41 PM
To: tracyel@co.larimer.co.us
Cc: Aaron Cvar; Andy Reese; Marsha Hilmes-Robinson; Bill Nicholl (bnicholl@gerrardinc.com); Nick Haws
(nick@northernengineering.com )
Subject: RE: floodplain permit for 912 Wood St.
Eric, please find attached the permit application and the letter with exhibit from Northern Engineering. As I said in my
vm, let me know if this will work or if you need me to bring you an original application. Additionally, please give me an
estimated time that the permit may be ready so that we can efficiently schedule our excavator.
Thanks!
�6- &-A4"
Gino Campana
Bellisimo, Inc.
Ph.970.229.5900
Fax 970.223.5740
3702 Manhattan Ave, Ste 201
Fort Collins, CO.80526
++++++CONFIDENTIALITY NOTICE++++++
The information in this email may be confidential and/or privileged. This email is intended to be reviewed by only the
individual or organization named above. If you are not the intended recipient or an authorized representative of the
intended recipient, you are hereby notified that any review, dissemination or copying of this email and its attachments,
if any, or the information contained herein is prohibited. If you have received this email in error, please immediately
notify the sender by return email and delete this email from your system.
From: Nick Haws [mailto:nick@northernengineering.com]
Sent: Thursday, October 20, 2011 2:19 PM
To: Gino Campana
Cc: Aaron Cvar; Andy Reese
Subject: Fw: floodplain permit for 912 Wood St.
Nick Haws, PE, LEED AP
NORTHERN ENGINEERING
-----Original message-----
2
Nick Haws
From: Nick Haws
Sent: Tuesday, November 01, 2011 2:01 PM
To: 'Marsha Hilmes-Robinson'; 'Gino Campana'; tracyel@co.larimer.co.us
Cc: Aaron Cvar, Andy Reese, Bill Nicholl (bnicholl@gerrardinc.com); 'Gina Hatton'; Lindsay Ex;
Ted Shepard; Mark Sears, Steve Dush
Subject: RE: floodplain permit for 912 Wood St.
Attachments: 2011-11-01_912-Wood-St_Larimer-County-floodplain-memo.pdf
Eric and Marsha,
The attached PDF contains the final memo and exhibit, both of which have been revised to address the comments
below. Please let me know if you have any further questions or comments.
Thanks,
Nick Haws, PE, LEED AP
NORTHERN ENGINEERING
From: Marsha Hilmes-Robinson [mailto:MHILMESROBINSON@fcgov.com]
Sent: Wednesday, October 26, 2011 12:11 PM
To: 'Gino Campana'; tracyel@co.larimer.co.us
Cc: Aaron Cvar; Andy Reese; Bill Nicholl (bnicholl@gerrardinc.com); Nick Haws; 'Gina Hatton'; Lindsay Ex; Ted Shepard;
Marsha Hilmes-Robinson; Mark Sears; Steve Dush
Subject: RE: floodplain permit for 912 Wood St.
Gino and Eric,
Thank you for the opportunity to provide input on the proposed fill plan that you submitted to Larimer County Engineering.
I have coordinated with several other City departments including Current Planning and Natural Resources. Our
comments are as follows:
1. The plan shows fill taking place where there are existing homes. Furthermore, some of the fill may be shown
where the existing septic clean -out location is located. The fill is also shown across the road, which would be an
emergency access issue. The fill in these areas seems premature. Staff would suggest a phased approach.
Show the fill that can be done without impacting the existing road and structures as Phase 1. Later, after all of the
structures have been removed, then the remaining fill could occur as part of a separate permit and plan. Both
phases could be combined into one LOMR-Fill while still in the County.
2. The excavation areas do not show any proposed grading. This is of importance especially in the excavation area
2. This is a pond that the applicant has proposed using as both a water feature for the site's future residents and
to use the outflow of that feature to support the vegetation in the floodplain. Staff is initially supportive of this
concept. While we do not believe this excavation will preclude such a feature from being developed in the future,
we do want to make sure this overall vision is maintained throughout the process.
3. The fill may not be high enough to show the area removed from the floodplain at the northwestern portion of the
fill area. Spot elevations will need to show that the fill is above the BFE. Staff would suggest reviewing the
grading plan and giving yourself some extra fill amount to make sure you are at least above the BFE for the
LOMR-Fill.
4. City staff would like to have a note on the plan that acknowledges that any future structures in areas removed
from the floodplain by a LOMR-Fill will be required to have the lowest floor (including basement), HVAC, electrical
and other mechanical elevated two feet above the 100-year flood elevation.
5. To support the statements made in the memo regarding the fill being in an ineffective flow area, it would be
helpful to have a drawing/calculations that supports this statement (See the draft memo from Brian Varrella for
guidance).
6. City staff would request that the floodway for the West Vine and Poudre River floodplains be staked in the field
prior to work commencing so that no construction activity take place within the floodway. This should be a note
on the plans