HomeMy WebLinkAboutAIR CARE COLORADO - FDP - 2-10/A - SUBMITTAL DOCUMENTS - ROUND 1 -Number 68:
There will not be a conflict with the CATV pedestal and the proposed sidewalk. Our last
submittal had an incorrect pedestal size.
Number 69:
A stripping plan is being provided in our final civil set.
Technical Services:
Elevation Plan
Number 59:
The lines over text issues on the elevation plan A3.0 have been corrected.
Site Plan
Number 41:
Text over -line conflicts have been revised.
Storm -Water -Wastewater:
Number 53:
Drainage easements will be created over detention ponds and water quality systems. Easements
will be created and conveyed by plat which is being processed separately.
Number 71:
No response required.
Zoning:
Please add the following General Notes:
The notes requested have been added.
Please let us know if you have any questions or need additional information. We look forward to
our PDP review on March 291n
Sincerely;
Cary Schreiner, Operations Manager
Envirotest Systems
Cc: Brian Ojala — Entasis Group
Rob Thorsheim — DST Associates
Number 61:
Grading behind the walk is being shown in our final civil plan set and will provide the 1 foot flat
area behind walk and is also being coordinated with our water quality system behind the walk.
Water quality flows will be piped under the walk so no chase is required.
Number 62:
Type III barricades are provided at walk terminations at the property lines.
Number 63:
The sidewalk and CATV box will not conflict. The requirement of 2'-0" clearance between
existing above grade utility cabinetry was waved during the meeting on 03/17/10.
Number 64:
Our civil plans will conform with Appendix E-4 requirements from LCUASS. We will meet
with Andrew to confirm our final civil plans meet your needs.
Number 65:
Street cut notes related to the Southeast Frontage Road have been revised as requested.
Number 66:
No response needed.
Forestry:
Number 70
We have changed the deciduous tree species along the I-25 frontage to more drought tolerant
varieties including Catalpa and Kentucky Coffee Tree.
Light and Power:
Number 1:
We will provide Commercial Service information and will coordinate location of electric supply
and name and address of billing customer upon review of the PDP.
PFA Department:
Number 26:
Fire hydrant requirements are noted and are being addressed.
Fire Hydrant clearance requirements have been addressed in landscape plans. Hydrant locations
have been moved as shown on the site plan to address comments.
Transportation Planning:
Number 67:
We have relocated the bicycle parking to the discussed location, adjacent to the east wall of the
building, per the meeting of March 17, 2010.
Engineering:
Number 5:
Acknowledged. We have worked with CDOT to address their concerns.
Number 6:
The requested Pedestrian Sidewalk Easement is shown and noted on the site plan. Please refer to
the submitted site plan A1.0 dated 03/19/10. An easement for the detached sidewalk will be
conveyed by plat
Number 7:
DCP application requirement will be completed after PDP review.
We acknowledge requirements related to completion of a Development Agreement information
sheet will be provided after PDP review.
Number 8:
All City notes numbers 26, 41, 47 and 48 are being incorporated into applicable utility and civil
plan cover sheets. We are submitting full civil plans and reports for review after our PDP
hearing.
Number 9:
Note civil plan comment above.
Number 10:
Drainage plans are being revised to include no more than 750 sq. ft. of area draining from the
drive entrances to the ROW. To accomplish this, we are adding concrete drainage pans to
convey water into the front storm water quality system. This will be demonstrated in our final
civil plan submittal.
Number 12:
Final grading plans will show the entire width of the frontage road including drive entrances
across the street.
Number 13:
Drive entrances will be built in accordance with Drawing 707. This detail is being included in
the final utility plan sheets.
Number 16:
We have been working with CDOT and acknowledge the requirements to obtain necessary
access permits upon approval of the PDP.
Number 17:
We are confirming signature block and plan approval requirements of Elco, Boxelder and
CDOT.
Number 60:
Sidewalk easements are being shown on Utility Plans in our final civil drawings.
PrAEnvirofest
Systems
5175 Marshall St., Arvada, CO 80002
March 25, 2010
♦ PH:303-456-7000 ♦ FAX:303-420-4066
Mr. Ted Shepard
City of Fort Collins
Planning, Development and Transportation Services
281 N. College Avenue
Fort Collins, CO 80522-0580
RE: Air Care Colorado PDP — Typel Letter of Re -submittal - Round 3
Dear Mr. Shepard;
This letter summarizes our response to the staff comments received on the above referenced
project dated March 19, 2010 and the verbal comments received at our March 17, 2010 Project
Review Meeting.
Based on comments received at the March 17`h Project Review meeting we have made the
following changes or have the following response:
• We are showing barricades at the end of the South East Frontage Road side -walk where it
terminates at the property lines.
• We have moved the bicycle parking rack adjacent to the front door and have adjusted
landscaping accordingly.
• We have added the electric pedestal and have added shrub screening of it as allowed by
necessary clearances.
• We have verified the size of existing CATV pedestals, and have confirmed there are no
conflicts with planned improvements (sidewalks etc).
A specific response to comments received in the March 19, 2010 Staff Project Review comment
letter is summarized below: