HomeMy WebLinkAboutAIR CARE COLORADO - PDP - 2-10 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESa
00
Statement of Planning Objectives
Re: PDP Submittal Ft. Collins, CO
January 13t", 2010
Ref: Interchange Business Park — Lot 16 Ft. Collins, CO
To Whom It May Concern:
We are submitting drawings/design for PDP Review. We have also submitted
stamped drawings for a building permit. We are proposing to build -an Air Care -
Emissions Testing facility to test vehicle emissions mandated by the state. This
building is an 8-lane facility with an administration office attached. The building
will be constructed of architectural split faced block, metal ornamentation, precast
components, and a standing seam metal roof. The building is oriented to have
minimal traffic impact and should fit within the surrounding developments. We
feel that we have met or exceeded the architectural requirements and we are
seeking to move forward on this project in late February. Please call if you have
any questions. Greatly appreciated.
Thank you.
Brian Ojala, AIA
Entasis Group
12365 Huron St. #400
Westminster, CO 80234