Loading...
HomeMy WebLinkAboutINVERNESS INNOVATION PARK FIRST FILING (ROCKY MOUNTAIN INNOVATION INITIATIVE) - PDP - 30-09A - CORRESPONDENCE - DRAINAGE REPORT (6)Ted Shepard -RMI2 Page 1; From: Marsha Hilmes-Robinson To: Bob Smith Date: 8/18/2009 11:39:58 AM Subject: RMI2 Bob, This morning, Glen Schluetter, Ted Shepard and I met with Mike Bello and Bob Gowing to share the new floodplain information for the Vine and College area and to discuss the impact to the RMI2 development. The new information shows approximately two feet of flooding across the RM12 site. I explained that the new information is not regulatory, but our recommendation would be to assume that there is two feet of flooding across the site and then to elevate the lowest floor elevation two additional feet above the flood level (freeboard). We discussed possible flood insurance implications, but I emphasized that our main concern is the safety and property protection of the new building. We discussed architectural styles that might work to elevate the floor level. I also explained that we would be sharing our modeling information with FEMA for FEMA to study in the future. From our initial discussions, it sounded like they would probably be able to incorporate the building elevation into their plans. Although this was not good news for RMI2, Mike and Bob were appreciative of our sharing this information with them at this time. Please let me know if you have any questions about our discussion. Thanks! Marsha Marsha Hilmes-Robinson, CFM Floodplain Administrator Fort Collins Utilities 700 Wood St. P.O. Box 580 Fort Collins, CO 80522-0580 Phone: 970-224-6036 FAX: 970-221-6619 mhilmesrobinson@fcgov.com CC: Glen Schlueter; Ted Shepard / O A a f1 !_EAI/i T T