Loading...
HomeMy WebLinkAboutSAINT ANDREWS APARTMENTS (300 WHEDBEE ST.) - MOD - 14-10 - CORRESPONDENCE -L� Fit submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation_ Development Review Fee must be paid at time of submittal. s. The entire Fort Collins Land Use Code (LUC) is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. Please pay particular attention to Article 3 and Division 4.8 Neighborhood Conservation Medium Density. This development proposal will be - - — 4. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color -coded flowchart with comprehensive, easy to read information on each step in the process for Project Development Plans (PDPs). This guide includes links to just about every resource you need during development review. S. The applicant for this development request is not required to hold a neighborhood information meeting prior to formal submittal of the proposal but it is suggested. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. If you decide to hold a neighborhood meeting please contact me; Emma McArdle, at 221-6206, to assist you in setting a date, time, and location. I and possibly other City Staff would be present to facilitate the meeting. e. If the proposal does not meet any standards of the Land Use Code (LUC), a Modification of Standards Request will need to be submitted with the formal application. Please see Section 2.8.2 of the LUC, which outlines the criteria for review of a Modification of Standard. A modification will most likely be needed to Section 3.2.2(K)(1)Residential and Institutional Parking Requirements and for the lot size. 7. 1 will have more detailed comments on the PDP once I have more detailed plans to review. a. Please contact me with any questions as you prepare your submittal documents. 9• C-ontact Russ Hoveland regarding required access into and out of the building, at 416-2341. Page 7 of 7 Fort Collins 7. This project is responsible for dedicating any easement necessary to serve the site. There MAY be the need for utility or drainage easements. If this is true, then the easements can be dedicated by separate document (Transportation Development Review fees and County filing fees apply). If a Utility Easement is required through the property to the east, a Letter of Intent is required from that property owner prior to scheduling the public hearing. The actual dedication (dedication statement, legal description and exhibit) must be submitted and approved prior to the final plan approval. a. Utility plans will be needed for this project if driveway improvements, upgrades to the utilities or street cuts are required. 9. A development agreement may be required with this project. 10• A Development Construction Permit (DCP) may be needed prior to starting any work on the site. • 1 could not tell from the exhibits submitted if there was an existing driveway or where its located. If the driveway is not up to current standards, then it must be reconstructed and paved in accordance with Drawing 706 of LCUASS. If parking is proposed off the driveway, setbacks and parking stall dimensions apply. See chapter 19 of LCUASS. If the existing driveway is to be closed, the driveway opening must be removed and replaced to match the existing vertical curb. Street Cut repairs must be made in accordance with LCUASS, chapter 25. 12. All changes to on street parking must be approved by Randy Hensley in Parking (416-2058) and the Transportation Planning Department. Please contact the representative from Transportation Planning contained within this letter. Electric Engineering Contact: Alan Rutz, 970-224-6153, arutz &fcgov.com Normal light and power development charges will apply for change of use to multi -family. 2. Additional system modification charges will apply to bring power to the site. This will include a new electric service and possibly a dedicated transformer set on the property. 3. Submit C-1 Commercial Load form with voltage and power requirements. 4. Show any existing easements on or adjacent on the site. Current Planninq Contact: Emma McArdle, 970-221-6206, emcardle(cDfcgov.com �• This proposal requires a Type 1 review. A proposal of this kind is known as a Project Development Plan (PDP). Please see the Submittal Requirements tab on the Current Planning website, http://fcgov.com/currentplanning and see the PDP Submittal Checklist and Requirements. 2. The request will be subject to the Development Review Fee Schedule that is available in the CDNS office and on the Current Planing website. The fees are due at the time of Page 6 of 7 FLt` C S. RESIDENTIAL AUTOMATIC FIRE SPRINKLERS An automatic sprinkler system installed in occupancies in accordance with Section 903.3 shall be provided throughout all buildings with a Group R (Residential) fire area. Residential or quick -response standard sprinkler heads shall be used in dwelling units and guest -room portions of the building. Fire sprinklers must comply with NFPA 13R Standards. 2006 International Fire Code 903.2.7 Environmental Planning Contact: Dana Leavitt, 970-224-6143, DLeavitt(cDfcgov.com I. The City's green building program has many programs that may benefit your project. Use the following link to look over the Green Building web page: hftp://wvM.fcgov.com/greenbuilding/ 2• Of particular interest may be the Integrated Design Assistance Program, which offers financial incentives and free technical support to those interested in delivering high-performance buildings that exceed building code requirements for energy performance. Gary Schroeder is the contact person for this program. This is the direct link to the web page for this program: http://www.fcgov.com/conservation/biz-idap.php . I This project has great potential to apply deconstruction methods versus standard demolition practices for the interior of the building. John Armstrong is a good contact to research and provide guidance on this process. He can be reached at 970-416-2230. 4. An trash and/or recycling enclosures shall be compatible with y y g p the style of architecture of the building, per Section 3.2.5 of the LUC. Engineering Development Review Contact: Susan Joy, 970-221-6581; ,'%siovCa fcgov.com If the utilities go through the neighboring property to the alley, then a utility easement will be needed. 2• Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. 3• Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see hftp://www.fcgov.com/engineering/dev-review.php 4. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer6s expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 5. Please contact Joe Olson in Traffic Engineering to schedule a scoping meeting and determine if a traffic study is needed for this project. 6. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). Page 5 of 7 rtCollins part of the City's Demolition/Alteration Review Process (City Code Section 14-72). 4• As an investment project, the work can qualify for all of the financial incentives, including the 20% State Tax Credit, 20% Federal Tax Credit, the City's Landmark Rehabilitation Loan Program, Historic Structure Assessment grants, and State Historic Fund Grants. Please contact staff for more information. 5. The applicant is encouraged to take advantage of a Complimentary Review with the Landmark Preservation Commission very early in the project. This may be arranged by contacting staff. s. The Landmark Preservation Commission meets the 2nd and 4th Wednesday's of each month. Fire Authority Contact: Carie Dann, 970-219-5337, cdann(o)poudre-fire.org �• WATER SUPPLY Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: - Commercial, 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter - Residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter -Residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. PLEASE NOTE: Two existing hydrants are located at NW comer of Whedbee and Olive, and NW corner of Whedbee and Magnolia. 2006 International Fire Code 508.1 and Appendix B 2. KEY BOXES REQUIRED Poudre Fire Authority requires a key box (Knox Box) to be mounted in approved location(s) on every new building equipped with a required fire -sprinkler system or fire -alarm system. 2006 International Fire Code 506.1; PFA BUREAU POLICY 88 I FIRE DEPARTMENT CONNECTION Fire department connections shall be installed remote from the buildings, and located on the street or fire lane side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire code official. 2006 International Fire Code 912.2 and PFA Fire Prevention Bureau Policy 4• ADDRESS NUMERALS Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). 2006 International Fire Code 505.1 Page 4 of 7 rat` Collins Whedbee and an 8-inch sewer in the alley to the east. 2. The existing water service to the property is a %-inch service. Most 4-plexes in the City's service area have 1-inch services. If the intent is to try and use the %-inch service, provide service sizing calculations for.review. Residential development fees are based upon the lot size and the number of living units; therefore the size of service does not affect the development fees for residential. 3• Development fees and water rights will be due at time of building permit. Credit will be given for the existing non-residential service. Transportation Planning Contact: Jennifer Petrik, 970-416-2471, jpetrik(oDfcgov.com 1. Bicycle parking is required convenient to the entrance for both residents and visitors, on a hard surface, and out of the elements if possible. Detached sidewalks with directional ramps currently exist. Stormwater Engineering Contact: Glen Schlueter, 970-224-6065, gschlueter(a1)fcgov.com 1• A change of use triggers bringing the site into compliance with the current LUC which requires water quality treatment of site runoff. This can be very challenging on a site with very little space to make changes. Water quality treatment methods are described in the Urban Storm Drainage Criteria Manual, Volume 3 - Best Management Practices (BMPs). Some suggestions would be a rain garden, disconnection of impervious surfaces, or discharging the building downspouts into planting areas or planter boxes. 2. Most of the drainage requirements are based on an increase of impervious area. In the Old Town basin, 5000 sq :ft. of impervious area can be added before drainage report requirements apply. It doesn't appear that this is being proposed; therefore, this will not be addressed at this time. 3• Stormwater development fees are $6313/acre ($0.1449/sq.ft.) for new impervious area over 350 sq. ft. In addition, there is a $1,045.00/acre review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at http://www.fcgov.com/utilities/builders-fees.php or by contacting Jean Pakech at 221- 6375. Historical Preservation Contact: Karen McWilliams, 970-224-6078, kmcwilliams(cDfcgov.com �• No significant Historic Preservation issues are foreseen, and the Preservation Office strongly supports this adaptive reuse project. 2. As the property is designated on the National and State Registers as part of the Laurel School National Register District, Land Use Code Section 3.4.7, Historic and Cultural Resources, will apply to the review of this project. 3• The building is more than 50 years old, so all exterior alterations would also be reviewed as Page 3 of 7 -.q, CONCEPTUAL REVIEW STAFF COMMENTS Meeting Date: January 11, 2010 Item: 300 Whedbee - Change of Use Applicant: Bob King 2200 Topaz Dr Boulder, CO 80304 lotusking@indra.com Land Use Data: City of ort Co ins A proposal to convert an existing church at 300 Whedbee Street into a multi -family facility (4 semi -high end 3 bedroom apartments). The applicant is not proposing any exterior changes to the site, only internal to the building. The site does not have room to add parking onsite, the applicant is inquiring with the City's Parking Services Department about the possibility to change the parallel parking around the site to diagonal to accomodate the additional parking the residences would require. The site is in the NCM (Neighborhood Conservation Medium Density) zone district. The proposed multi -family use is permitted subject to a Type 1 (administrative) review and hearing in the NCM zone district if the proposed number of units is 4 or less and there are no structural additions or changes to the exterior of the building. Comments: Zoning Contact: Peter Barnes, 970-416-2355, pbarnes(cDfcgov.com i. Conversion to 4-plex without additions or significant exterior alterations requires a Type 1 review. 2• Two parking spaces required for each 3 bedroom unit, for a total of 8 spaces required, one of which has to be van accessible. A modification will be needed to reduce the number of spaces. I A minimum lot size of 6000 sq. ft. is required. If the lot is smaller than that, a modification will be required. 4. , Zoned NCM, Neighborhood Conservation Medium Density. Water -Wastewater Engineerinq Contact: Roger Buffington, 970-221-6854, rbuffington(a)fcgov.com Existing water mains and sanitary sewers in the area include a 4-inch water main in Page 2 of 7 4 • City of Fort Collins January 11, 2010 Bob King 2200 Topaz Dr Boulder. CO 80304 RE: 300 Whedbee - Change of Use Dear Bob, • Community Development and Neighborhood services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax kgov. com/currentplanning Attached, please see a copy of Staffs comments concerning the request referred to as the 300 Whedbee - Change of Use, which was presented before the Conceptual Review Team on January 11 m 2010. l The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to contact me at 970-221-62.06. Sincerely, '4 Emma McArdle, City Planner I J�CQ. 281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 — (970) 221-6750 - FAX (970) 224-6134