HomeMy WebLinkAboutSOUTH TRANSIT CENTER - PDP - 9-10 - CORRESPONDENCE - (20)•
The emergency spillway has been added and labeled on Sheet C05 and C11. Cross
section detail for clarity will be added on the final submitted Mylar plans.
Be sure and return all of your redlined plans when you re -submit for Final Compliance.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
Emma McArdle
City Planner
Page 6
ri
•
[7/27/10] Please make sure that all reception numbers for off site easements are shown on
the Subdivision Plat prior to mylars.
Acknowledged.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 92 Created: 5/18/2010
[7/30/101 Reminder Comment.
[6/23/10] Reminder Comment.
[5/18/10] Offsite drainage easements are required for the portion of the detention pond
offsite and for any portion of the outfall storm sewer that is on private property and not within
an existing drainage easement. Where an offsite drainage easement is required, a letter of
intent is all that is required before the public hearing.
Number: 93 Created: 5/18/2010
[7/30/10] Please show and label the depth gage on the grading and drainage plan.
[5/18/101 A detention pond depth gage is required for ponds deeper than 4 feet.
Depth gage label added on sheet C05.
Number: 171 Created: 6/25/2010
[7/30/10] The drainage report now states 1.22 ac-ft is provided. This can be resolved at
final compliance.
[6/25/10] The drainage report states that 1.19 ac-ft of detention is required. When adding
the quantity detention and quality detention stated in the report, 1.29 ac-ft results in being
required. Please revise.
Based on a few minor site adjustments, 1.15 ac-ft of detention is now required and 1.28 ac-ft
is provided.
Number: 185 Created: 7/30/2010
[7/30/10] At final compliance, please provide a basin summary table on the drainage plan.
This should include as sub -basins and their areas, c-factors, flows for the 2 and 100-year
storm.
Summary basin table has been added to the report. Table will be added to the finalize
report as requested.
Number: 186 Created: 7/30/2010
[7/30/10] At final, please include a pond summary table on the drainage plan. This should
include quantity detention required and proposed, water quality required and proposed, 100-
year HWL, and release rate.
Quantity detention required = 1.15 ac-ft, Quantity detention proposed = 1.28 ac-ft , water
quality required and proposed is 0.21 ac-ft, 100-year HWL elevation = 5007.65, and the
release rate is 1.85 cfs. A table with these values will be added to the finalize report as
requested.
Number: 187 Created: 7/30/2010
[7/30/101 At final, please show and label an emergency spillway on the grading and
drainage plan. The spillway can be set at an elevation of 5007.70, which will give you the
required volume. The berm should be set at 5008.7, which gives you a foot freeboard. The
spillway should be sized to take the 100-year developed flow for the site with a flow depth of
6 inches. This will give another 6 inches of clearance to the top of berm.
Page 5
•
N
8. Equipment access/drives shall be positioned to minimize travel over the root system of
any existing tree. Equipment drive locations over the root system of any significant tree shall
be approved by the City Forester with requirements to protect the soil from being
compacted.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 98 Created: 5/19/2010
[7/27/10] The Emergency Access Alignment is perfect on the plat. As we discussed, it has
to be an alignment, not an easement, since its city -owned property. Thank you.
[6/22/10] Thanks for showing the Emergency Access Easement on your documents. Just a
reminder that approved signage will need to be in place prior to issuance of a CO.
Just a reminder to include the EAE when you show easements on future documents.
Noted, thank you.
Number: 175 Created: 7/27/2010
PFA's comments and requirements are resolved at this time.
Department: Transportation Planning Issue Contact: Jennifer Petrik
Topic: Utility Plan
Number: 174 Created: 7/26/2010
[7/26/10] All Transportation Planning comments have been addressed.
Acknowledged.
Department: Technical Services Issue Contact: Jeff County
Topic: General
Number: 177 Created: 7/27/2010
[7/27/10] The 2 Utility Easement boundaries & legals close.
Acknowledged.
Number: 178 Created: 7/27/2010
[7/27/10] There is an error in the Tract D Retail utility easement legal. Please change "PCC
- Point of Compound Curvature" to "PRC - Point of Reverse Curvature". See redlines.
Revised see attached new legal.
Topic: Plat
Number: 170 Created: 6/25/2010
[7/27/10] We are leaving comment #170, with the understanding that this Subdivision Plat
will be filed after the purchase of the property at the southwest corner.
[6/25/101 6/25/10- We talked with Emma McArdle about the small tract at the southwest
corner of the property. The City is in the process of purchasing this. The soonest the City
would have title is September. It would be nice to include this in the plat, but would require
the boundary to change.
Acknowledged.
Number: 176 Created: 7/27/2010
[7/27/101 The Subdivision Plat legal & boundary close.
Acknowledged.
Number: 179
Created: 7/27/2010
Page 4
center property, they do not need to be dedicated via separate document and can be
dedicated as utility alignments on the plat.
Subdivision Plat will be filed after the purchase of the property.
Number: 184 Created: 7/27/2010
[7/27/10] See redlines for additional minor comments.
Redlines received have been addressed.
Department: Forestry Issue Contact: Tim Buchanan
Topic: Stormwater
Number: 188 Created: 7/30/2010
[7/30/10] The project should use the following tree protection notes on the landscape plan.
Acknowledged.
Tree Protection Notes
1. Within the drip line of any protected existing tree there shall be no cut or fill over a four -
inch depth unless a qualified arborist or forester has evaluated and approved the
disturbance.
2. All protected existing trees shall be pruned to the City of fort Collins tree management
standards for thinning and cleaning.
3. Prior and during construction, barriers shall be erected around all protected existing
trees with such barriers to be of orange fencing a minimum of four (4) feet in height, secured
with metal T-posts, no closer than six (6) feet from the trunk or at the drip line, which ever is
greater, There shall be no storage or movement of equipment, material, debris or fill within
the fenced tree protection zone. Modification of protective fence locations to accommodate
construction shall be approved by the City Forester prior to moving or erecting a protective
fence. Where the drip line of trees touch or overlap, place fence around groups of trees.
4. During construction there shall be no cleaning of equipment or materials or the storage
and disposal of waste material such as paints, oils, solvents, asphalt, concrete, motor oil or
any other material harmful to the life of a tree within the drip line of any protected tree or
group of trees.
5. No damaging attachments, wires, signs or permits may be fastened to any protected
tree.
6. The installation of utilities, irrigation lines or any underground fixture requiring
excavation deeper than six (6) inches shall be accomplished by boring under the root
system of protected existing trees at a minimum depth of twenty-four (24) inches. The auger
distance is established from the face of the tree (outer bark) and is scaled from the tree
diameter at breast height as described in the tree protection chart of the Fort Collins land
use code section 3.2.1.
7. Construction shall be performed in a manner to not damage any existing tree.
Clearance pruning of any tree on site shall only be by a Fort Collins licensed arborist
following City of Fort Collins tree management standards under the direction of the City
Forester.
Page 3
•
i
Number: 194 Created: 8/3/2010
[8/3/10] The existing water line on sheet C08 is incorrectly identified as DI, it is PVC.
Note has been adjusted.
Number: 195 Created: 8/3/2010
[8/3/10] The proposed water line lowering on sheet C08 is too deep.
Per our discussion, profiles of the proposed storm drain have been lowered to allow the
water line to pass over the top with 12" separation. Notes calling out to center pipes at
crossing added.
Number: 196 Created: 8/3/2010
[8/3/10] The proposed manhole connection is too be core drilled.
Note has been added.
Number: 197 Created: 8/3/2010
[8/3/10] All water line and sanitary sewer line crossings need to be identified and shown on
plan and profile.
All crossings are identified on the plan and profiles as requested.
Department: Engineering Issue Contact: Andrew Carney
Topic: Utility Plan
Number: 156 Created: 6/22/2010
[7/27/10] Carried forward as a reminder that the letter of intent is needed prior to hearing
and the utility easement will need to be recorded by separate document prior to final plan
approval.
[6/22/101 The proposed water line connection through the property to the North will require
a utility easement and a letter of intent prior to hearing.
Number: 180 Created: 7/27/2010
[7/27/10] ] On the proposed detail showing how this project will tie into the end of existing
Fossil Blvd, the sawcut needs to be perpendicular to the traffic direction. See redlines for
some additional minor comments and questions.
Sawcut has been adjusted to be perpendicular to travel way. Additional comments
addressed for clarity.
Number: 181 Created: 7/27/2010
[7/27/10] Once a letter of intent for the proposed off -site utility easement is received,
Engineering is ready for hearing.
Number: 182 Created: 7/27/2010
[7/27/10] Directional handicap ramps are required at all locations. See redlines.
Directional ramps included. The ramp called out in the mark up has been removed as the
connection to the BRT corridor is still being evaluated.
Number: 183 Created: 7/27/2010
[7/27/10] On the plat there are still two drainage easements being shown on the southern
portion of the site. If this area is being purchased and becoming a part of the south transit
PaIe 2
F
Forof
t`Collins STAFF PROJECT REVIEW
Jerod Huwa Date: 8/3/2010
BHA Design, Inc.
1603 Oakridge Dr
Fort Collins, CO 80524
Staff has reviewed your submittal for SOUTH TRANSIT CENTER PDP- TYPE I, and we
offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Emma McArdle
Topic: General
Number: 199 Created: 8/3/2010
[8/3/10] The letters of intent and acknowledgement must be submitted to me by August
10th to proceed with the August 24th hearing date. Please contact me with any questions.
Acknowledged.
Topic: Landscape Plan
Number: 198 Created: 8/3/2010
[8/3/10] Please take note 3 of the Landscape Plans, even though this project is outside of
the City's water/sewer service area, it still needs to meet the City's approved Hydrazone and
Water Budging requirements. An irrigation plan must be submitted to Water Conservation
meeting the City's Standards prior to building permit.
Acknowledged.
Topic: Water and Sanitation
Number: 189 Created: 8/3/2010
[8/3/10] These comments are entered for Terry Farrill with Fort Collins - Loveland Water
District and the South Fort Collins Sanitation District.
Number: 190 Created: 8/3/2010
[8/3/10] The fire flow requirements need to be submitted to evaluate water line sizing and
connections.
Number: 191 Created: 8/3/2010
[8/3/10] The Construction note E.1. on sheet G02 needs to be corrected to indicate a
minimum bury of 5 feet and the maximum bury of 6 feet.
Note has been adjusted.
Number: 192 Created: 8/3/2010
[8/3/10] The meter pit needs to be shown. The meter pit cannot be located in a traffic area
or pedestrian traffic area.
Meter pit is located in a landscaped area adjacent to the access ramp. See sheet C07.
Number: 193 Created: 8/3/2010
[8/3/10] The District will require easements on the District's standard easement form.
Per our conversation on 12-28-10, this has been addressed with Erika Keeton.
Page I