Loading...
HomeMy WebLinkAboutRIVER DISTRICT BLOCK ONE MIXED-USE (ENCOMPASS) - FDP - FDP130015 - CORRESPONDENCE - (6)05/28/2013: Is the Lienholder still pending? Comment Number: 18 Comment Originated: 05/28/2013 07/05/2013: We acknowledge your response, but will mark this until the reception numbers have been added. 05/28/2013: Please provide the reception numbers for the off -site easements by separate document prior to filing the Plat. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 05/28/2013 07/09/2013: See redlined utility plans. 05/28/2013: Label valve, fittings, etc. at the fire line connection. Comment Number: 4 a Comment Originated: 07/09/2013 07/09/2013: On Shts C100 and C300, add notes to coordinate abandonment of the 2" water service with FC Water Utilities (see redlines). Comment Number: 5 Comment Originated: 07/09/2013 07/09/2013: The two 2" water services and the fire line need to be installed below frost depth, thereby, eliminating the need for the insulation in that area. It appears that these lines can go under the sanitary, -over the storm and under the duct bank. The fire line may need fittings to get under the duct bank. Please review this approach and call to discuss and finalize. It would be helpful to provide a detail showing the profile at this location. Comment.Number: 6 Comment Originated: 07/09/2013 07/09/2013: Add the thrust block Std Detail. This will be a conuition of the floodplain use permit and will also oe included in the development agreement. Topic: General Comment Number: 2 Comment Originated: 05/28/2013 05/28/2013: OS-1 flows for the 100-year storm need to pass through the proposed swale and inlet, not just the 2-year flows. Comment Number: 3 Comment Originated: 05/28/2013 05/28/2013: Please see other minor comments on the redlined plans and report. Department: Technical Services Contact: Jeff County, 970-221-6588, jcountyCfcgov.com Topic: Building Elevations Comment Number: 2 Comment Originated: 05/28/2013 07/09/2013: These were not provided in the review set, so we assume that they are not to be included in the plans to be filed. 05/28/2013: Are the Floor Plan sheets to scale? Please add the scale or N.T.S. to the sheets. Comment Number: 22 Comment Originated: 07/09/2013 07/09/2013: Please remove the "Technical Services 5/29/13" from the bottom right corner of the sheets. This is a reference to you and us, that these were reviewed by Technical Services on 5/29/13. Topic: Construction Drawings Comment Number: 5 Comment Originated: 05/28/2013 07/09/2013: There are line over text issues on sheet C100, C200, C300 & C401. See redlines. 05/28/2013: There is a line over text issue on sheet C300. See redlines. Comment Number: 6 Comment Originated: 05/28/2013 07/09/2013: There is still text that needs to be masked on sheet C301. See redlines. 05/28/2013: Please mask all circled text on sheets C301 & C500. See redlines. Comment Number: 8 Comment Originated: 05/28/2013 07/09/2013: BANK STABILIZATION: There are still line over text issues on sheets 4 & 8. See redlines. 05/28/2013: BANK STABILIZATION: There are line over text issues on sheets 4, 5, 6, 7, 8 & 9. See redlines. Comment Number: 23 Comment Originated: 07/09/2013 07/09/2013: There is a note that is missing text on sheet C401. See redlines. Topic: Landscape Plans Comment Number: 11 Comment Originated: 05/28/2013 07/09/2013: There are still(some new) line over text issues on sheets 1 & 2. See redlines. 05/28/2013: There are line over text issues on sheets 1 & 2. See redlines. Topic: Plat Comment Number: 13 Comment Originated: 05/28/2013 07/05/2013: Please add a Lienholders signature block until it is known whether or not there will be one. If no Lienholder is involved after the sale of the property is complete, it can then be removed. show how cross slopes will be for the widening of the inset pa, Ning and how cross slopes tie into existing. Comment Number: 12 Comment Originated: 07/10/2013 07/10/2013: Please revise the grading contours shown on the grading plan to reflect the revised cross slopes as agreed to in the previous comment. Comment Number: 13 Comment Originated: 07/10/2013 07/10/2013: Please indicate on the construction plans that the "Structures in right-of-way require building permit review and inspection, coordinate with City Building Department." Topic: General Comment Number: 1 Comment Originated: 05/29/2013 07/10/2013: Do we need signature blocks on all sheets of this plan, or just the first page? 05/29/2013: Is the "River District Block One Mixed Use Bank Stabilization" plan set intended to be part of the construction plan set and signed by the City, or is it intended to be its own set? It would seem to make sense to combine this into the construction plan set. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General Comment Number: 2 Comment Originated: 05/28/2013 07/10/2013: I've provided draft DA language to Marc Virata. Environmental Planning is ready for mylars. 05/28/2013: Otherwise, all of my plan -related comments were addressed at PDP. When the DA is drafted, I will include language on the escrow required for the buffer zone landscaping and the need for a weed management plan. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com Topic: Erosion Control Comment Number: 4 Comment Originated: 07/10/2013 07/10/2013: 1) Please include the Saw -cutting BMP in the Erosion Control Report. 2)The outlet structure called out for in the Sediment Basin is not the same in the sediment basin detail sheet. Please show a better detail of how you plan on using the proposed outlet structure as a sediment basin. 3) Please include an escrow calculation. 4) Please include a filled out sequence chart on the Static Plan and the corresponding dynamic sheets for each phase/sequence of construction matching the sequence chart. 5) address redlines given over at the FDP Meeting on 7/10/2013. If there are further questions please contact Jesse Schlam at jschlam@fcgov.com Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: Floodplain Comment Number: 1 05/28/2013: Repeat Comment Comment Originated: 05/28/2013 1. Per our conversation during the field meeting on May 9th, construction timing and methods in the river must be addressed. Construction in the river, including the placement of diversion structures, must not be conducted during flood season which is April 15-end of September. City of F6rt Collins community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. coWdevelopmentreview July 12, 2013 RE: River District Block One Mixed Use -Encompass, FDP130015, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Current Planning Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com Topic: General Comment Number: 5 Comment Originated: 05/31/2013 05/31/2013: On the Perspective sheet, the East elevation label should be the Northwest and the West elevation label should be the Southeast. Unresolved: a Perspective was not included in my set. It will need to be a part of the mylar set. Comment Number: 7 Comment Originated: 07/10/2013 07/10/2013: Be sure to verify with the Larimer County Health Department as to the proper location of the grease trap. There may be an issue with its placement in the patio. Comment Number: 07/10/2013: Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com Topic: Construction Drawings Comment Number: 11 Comment Originated: 07/10/2013 Comment Originated: 05/29/2013 07/10/2013: The revised cross slope information emailed from James Prelog was found to be acceptable. Please ensure this is added to the information on the plan set. In addition, please indicate approval of a variance request on Sheet C001 Note #48 indicating cross slopes less than 1.5% as an approved variance (approved as of Tuesday July 9th). 05/29/2013: Please provide additional information (such as cross sections) for Linden Street to