HomeMy WebLinkAboutWATER'S EDGE @ RICHARD'S LAKE - FDP - 58-86K - CORRESPONDENCE - (5)• Page 2 of 2
• Re -submit one half-size set (140 pages) to Engineering
• Re -submit individual sheets to Natural Resources and Parks Planning (if applicable) per the routing
sheet designation
• Re -submit partial sets to Water Supply and Storage and the Wellington Operating Company (if they
want another set prior to mylars --- this in not anticipated, but I will let you know when I hear from
them).
• Re -submit 6 copies of the plat (Planning, Comcast, Engineering, Parks Planning, Tech. Services, and
Larimer Co. Assessor)
Please let me know if the above list will suffice for the April 21, 2010 submittal for the Civil Utility Plans and the
Plat and correct me if necessary. I assume Terence has also addressed all his comments, but will let him speak
for that.
Thank you,
John Gooch, P.E.
Project Manager
APEX Engineering
238 Walnut Street, Suite 200
Fort Collins, CO 80524
Office 970-797-2906
Mobile 970-420-5345
JohnG@APEX-ensineer.com
file://C:\Documents and Settings\solt\Local Settings\Temp\GW}00001.HTM 4/12/2010
� • . Page 1 of 2
Steve Olt - Water's Edge...
From: "John Gooch" <johng@apex-engineer.com>
To: "'Susan Joy"' <sjoy@fcgov.com>, "'Steve Olt"' <SOLT@fcgov.com>
Date: 4/9/2010 11:48 AM
Subject: Water's Edge...
CC: "'Terence Hoaglund"' <hoaglund(avignettestudios.com>
Susan and Steve,
In keeping things moving forward on the Water's Edge project, I thought I'd pass on the correspondence I've had
with the reviewing individuals on the project. Over the last week and a half I've been meeting with individuals
on the civil plans and reports, discussing the old comments and showing them the current plans and how the
comments/redlines were addressed back in December of 2007. In doing so, the following individuals/entities
have signed off on the plans or project documents and are ready for mylars:
City Fort Collins Stormwater (Basil Hamdan): I met with Glen, Wes, & Basil: The drainage report was accepted
and the final signed and sealed copies were submitted to Basil this morning (April 9, 2010).
ELCO Water District (Darwin Williams, Mike Scheid): I have spoken with Darwin Williams and met with Mike
Scheid on 4-9-10. The plans were reviewed and ELCO is ready for mylars.
Boxelder Sanitation District (Randy Siddens): I have met with Randy Siddens and Boxelder is ready for mylars.
City of Fort Collins Traffic Operations(Ward Stanford): I have spoken with Ward and Ward re -affirmed that all
of his comments have been addressed and he is again ready for mylars.
City of Fort Collins Natural Resources (Dana Levitt): In speaking with Terence, I was told Dana is no longer at
the City. Dana's only comment was that we needed to add the Limits of Development to the pertinent sheets in
the set, which has been done.
Poudre Fire Authority (Carrie Dann): I met with Carrie Dann this morning and PFA is ready for mylars of both
the Civil Plans and Plat.
I have also spoken with the City of Fort Collins Parks/Planning (Craig Foreman). The only issue Craig and I were
working on was the location of the sanitary sewer service and water service stub to the future City Park. Craig
and I decided on a location for these two stubs and the issue was resolved. I spoke with Craig today and we are
meeting Monday morning to re -confirm the stub locations will work and then Craig should be ready for mylars
too.
I have left a message with the Wellington Operating Company (Brad Pomeroy). Brad was ready for mylars back
in 2007, but I will re -confirm with him that he is again ready for mylars.
I am working with the client on obtaining the contact for Water Supply and Storage, who will sign the plans, but I
have not received the name yet. Old comments state that the contact is Dennis Harmon, but I will confirm this
and confirm Water Supply and Storage is again ready for mylars.
The purpose of all this groundwork was to get everyone back on track and up to speed with the project and
where we left off back in December of 2007, when we received the "ready for mylars" and the mylars were
printed but not submitted.
We are still planning on a formal re -submittal of blackline plans to Current Planning and Engineering on April 21,
2010, prior to the mylar submittal. Per the above parties who have signed off on the plans, reports, etc.... and
are ready for mylars, I'm assuming the previous routing sheet list has been reduced to the following:
file://C:\Documents and Settings\solt\Local Settings\Temp\GW}0000LHTM 4/12/2010