HomeMy WebLinkAboutWATER'S EDGE @ RICHARD'S LAKE - FDP - 58-86K - CORRESPONDENCE - (3)re -submittal requirement (from the date of this comment letter, being October 18, 2007) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all red -lined plans when you re -submit. The number of copies of each document to re -submit is shown on the attached REVISION ROUTING SHEET. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970)221-6341. Yours Truly, *eve City Planner cc: Susan Joy Stantec Consulting Skyland Meadows Developments Planning & Zoning file #58-86K Page 10 Topic: Drainage Report Number: 255 Created: 10/ 16/2007 [10/ 16/071 The drainage report has no written portion explaining what criteria were met and no explanations as to how this plan meets the overall drainage master plan. Statement of compliance is required as well as signature by registered PE. Ditch issues should be discussed and ditch agreements should be attached as exhibits. Please provide an erosion control security estimate calculation. Topic: Grading Number: 245 Created: 10 / 9 / 2007 [10/9/07] Please provide grading cross section for the outfall of Basin 61 to the street. A sidewalk chase may be needed for the concentrated flow from that swale to enter Beamreach Place. Topic: Plat Number: 244 Created: 10 / 9 / 2007 [10/9/07] Please add language to the plat stating that all drainage easements within this development shall be owned and maintained by the property owner, and that the City by accepting these dedications does not assume maintenance responsibility for facilities within these easements and tracts. Topic: Utility Plans Number: 243 Created: 10 / 9 / 2007 [10/9/07] Storm Line D off of Gangway Drive should be within a separate tract rather than in an easement. The inlets on Gangway Drive are in a sump condition, yet no overflow emergency swale was provided. Please provide an overflow swale for inlet on Barn Swallow Circle. All inlets in a sump condition should have an emergency swale designed in case of clogging. Storm Lines Q and R also need to be within tracts rather than in easements on private property. Add a note stating that all storm drainage facilities located outside the right of way shall be maintained by the property owner. This represents staff (and outside reviewing agencies) review and comments at this time. Additional comments and red -lined plans may be forthcoming. Another round of staff review is determined to be necessary before the mylars will be requested. This proposal is subject to the 90-day revision Page 9 tracts that we required to be labeled as Emergency Access Easements on the plat: 1. Jetty Lane (Tracts M, M-1 and M-2) 2. Skiff Lane (Tracts L, L-1 and L-2) 3. Squibb Lane (Tracts K, K-1 and K-2) 4. Jib Lane (Tract O) 5. Tract S - drive aisles for MFDs 6. Lateen Lane (Tract Q) These are not new requirements/additions for the Emergency Access Easements; they are just reiterating what we'd agreed upon several months ago. Please make sure they all are labeled as EAE on the plat. Department: Traffic Operations Issue Contact: Ward Stanford Topic: Landscape Plans Number: 249 Created: 10/ 13/ 2007 [10/ 13/071 Nearly all internal street corners have trees indicated right about the PC's. This is too close for adequate sight distance of motorists and pedestrians. Please do not place a tree within 40' feet of intersections and no ornamentals within 100' of an intersection, unless it's canopy height can meet sight distance requirements from initial planting. Number: 250 Created: 10/ 13/2007 [10/ 13/07] Please coordinate the landscape plan (tree planting) with the Engineers signing and striping plan. Trees should not be placed within 40' of the front of regulatory and cautionary street signage. Topic: Signing and Striping Number: 248 Created: 10/ 13/2007 [10/ 13/07] Please provide signing and striping for Turnberry as it approaches Douglas Rd. Please show proper bay taper striping. Number: 251 Created: 10/ 13/2007 [10/ 13/07] Please provide a separate and larger signing and striping plan for Turnberry adjacent to the site with full dimensioning for turn lanes and transitions. Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Ditch company signatures Number: 148 Created: 6/4/2007 [10/9/07] [6/4/07] Please provide approval letter from the affected ditch companies for release into their facilities, the Reservoir No 8 Outlet Canal owned by the Windsor Reservoir Company and the Richard's Lake Company owned by Water Supply and Storage. Page 8 Topic: Utility Plans - Plan and Prof les Number: 217 Created: 6/20/2007 [10/ 17/07] Got the dimensionings (thanks!) but still need some spots. See redlines. [6/20/07] All street widenings must be dimensioned in accordance with figure 7-24. Please provide spot elevations as shown in the redlines so that I can verify that the min 2% cross slope requirement is being met. Number: 221 Created: 6/20/2007 [10/ 17/07] Street patch needs to go to the middle of a travel lane. Some of the layers are turned off on some sheets. Offsite grading shown in the Richards Lake detention pond ... will need either a construction easement or slope easement from this property. [6/20/07] Offsite Improvements on Turnberry - Please dimension existing row and label Lind 1st filing. Is the retaining wall proposed or existing? Line weights are too similar - hard to tell where the proposed sidewalk meets existing. It doesn't look like the correct row has been dedicated. We need to dimension or label that the proposed edge to edge asphalt width has to be 36' minimum. Please provide a right flowline. Need to show striping so that we can see that the saw cut and patching is falling on a lane line or in the middle of a travel lane. Patch also needs to be cut at least 2' into existing and patched in accordance with LCUASS. Please show existing ditch. Provide stationing. Number: 224 Created: 6/20/2007 [10/ 17/07] Anew note is indicating a shorter taper because of the constrained conditions in this area. Since this area is now being built to the ultimate location (previously the interim/no curb was shown), this taper needs to be built in the final location. A variance would be required to do a shorter turn bay ... is there a reason why it can't be built to the ultimate? [6/20/071 Please identify the taper and length of the right turn lane into the development. Topic: Utility Plans - Stormsewer Number: 205 Created: 6/20/2007 [10/ 17/07] Repeat... Still have a cover problem on some of the pipes even with the encasements gone. [6/20/07] Structures (encasements, pipes) are not meeting requirements in 12.2.2 on sheets 245, 248, 250, 253. Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 246 Created: 10/ 10/2007 [10/ 10/07] I neglected to include several tracts when specifying what we had agreed upon for Emergency Access Easements. Here is the entire list of Page 7 Number: 203 Created: 6/ 20/ 2007 [10/ 17/07] We will need the grading information since you are proposing grading in the interim. I know we had a conversation about this and the only thing I can think of is that I confused the ultimate with the interim ... or something. I messed up John. I wish I could waive the grading requirement but I can't see a way around it since you'll be out there grading within the slope and construction easement you're proposing. I'm sorry. While we're on the subject, we'll need the actual easements before the mylars can be signed. The slope easement will need to be dedicated to the city and the construction easement is private. If Stormwater is ok with just a letter than so am I. The temp easements can mess up the title work later on and I am sensitive to that. [6/20/07] Please provide contours and grading information for at least 50' to the east side of existing Turnberry row. The typical street section in the interim is showing an existing ditch under the proposed shoulder. See comments under Typical Street Section as well. Topic: Utility Plans - Horizontal Control Number: 182 Created: 6/ 20/ 2007 [10/ 17/071 [6/20/07] Please dimension sidewalks, parkways, parking stall widths, depths and drive aisles. Number: 256 Created: 10/ 16/2007 [10/ 16/07] A new note at the taper for the right turn lane into the site indicates that this is "constrained"? This should be at the ultimate ... why is this constrained? I know the client was deciding whether or not to install the curb and gutter on his side of the street and has apparently decided to do so, so the curb and gutter needs to be in the ultimate location. Topic: Utility Plans - Intersection Details Number: 228 Created: 6/ 20/ 2007 [10/ 17/07] Still missing some spots, see 7-27 and 28. [6/20/071 Missing spot elevations. Number: 229 Created: 6/20/2007 [10/ 17/07] Some of the intersection details are missing the transition lengths. [6/20/07] The minimum transition length is 30' - there are several intersections that are not meeting this requirement. Number: 230 Created: 6/ 20/ 2007 [10/ 17/07] [6/20/07] Please provide a detail and cut section of the median ramps in Morningstar (typical is ok). Page 6 Topic: Plat Number: 118 Created: 7 / 4 / 2006 [10/ 16/071 A maintenance table was provided however, it also needs to say who owns it. [6/21/07] [12/26/061 [7/4/06] Provide a tract table (who owns and maintains each tract). Number: 247 Created: 10 / 11 / 2007 [ 10/ 11 / 07] From Technical Services: 1. Boundary and legal close. 2. Remove "County Road #11". 3. See redlines - many concerns. 4. Lots must be shown as a whole on at least one sheet. 5. Show on the Plat how Turnberry was dedicated. 6. Line over text issues. Topic: Site Plan Number: 170 Created: 6 / 20 / 2007 [10/ 16/07] [6/20/07] Please show and label all retaining walls. Topic: Utility Plans - Demo Number: 257 Created: 10/ 16/2007 [10/ 16/07] Regarding the note next to the existing Brightwater asphalt... Improvements must be built in accordance with these plans and the timing is such that they must be completed prior to the issuance of any building permit along that street frontage. Topic: Utility Plans - General Number: 166 Created: 6 / 20/ 2007 [10/ 17/071 [6/20/071 Please remove all conceptual Lind III information since it has not been approved yet and we can't infer that this layout has been reviewed and approved in any way. Number: 176 Created: 6/ 20/ 2007 [10/ 17/07] [6/20/07] See redlines for other comments. Topic: Utility Plans - Grading Number: 201 Created: 6 / 20/ 2007 [10/ 17/07] Per your response, this is an existing easement. Please label as such (receipt # or however it was dedicated). [6/ 20/ 071 Sheet C 178 is showing an offsite storm line. Please provide a legal and exhibit for our review and approval. I will give you the appropriate dedication statement to dedicate the area to the city. Page 5 process as discussed previously). Please update the landscape plans to reflect that and make the appropriate notes on the plan set. The DA will have language regarding this as well. [12/26/06] [7/4/06] Repeat. Final Compliance. The developer has two choices for the street stub's existing row. First choice is to research who would receive the row (neighbor to north? Or the other site's HOA?) and then work out an access easement to connect your sidewalk through there OR leave the row as is and then agree to maintain the area with this development's HOA. If this is the option you would prefer, then the sidewalk could be repositioned away from the lot to the south and the area could be landscaped as more of an entry feature to your development. [5/9/06] Need to show the existing rights of way and what you are planning to have vacated. Will need legals and exhibits for each proposed vacation along with an $800 filing fee for each vacation. Larimer County Filing Fees also apply but those will be determined at a later time. Number: 111 Created: 7 / 4 / 2006 [10/ 16/07] Just carrying this comment through until the DA. [6/20/07] [12/26/06] [7/4/06] Final Compliance - Please note on the Site and Utility Plans that driveway access will not be allowed for the "A" lots on Daysailor and Outrigger and that all garage/driveway access must occur off the alley or private drive. This note will also be made in the Development Agreement. Number: 254 Created: 10/ 16/2007 [10/ 16/07] Phase I at Companion at Brightwater exceeds the 660' dead end maximum and needs to be terminated in a temp turnaround (see PFA for possible sprinkler requirements) OR build Brightwater to connect to Morningstar and your problem is solved. Both street frontages must be complete in order to pull a building permit for lot 272. You can either split the phase between lot 271 and 272 OR build the street along the south side of 272 in Phase 2. (See landscape redlines) Topic: Landscape Plans Number: 55 Created: 5/9/2006 [10/ 16/07] [6/8/07] [12/26/061 [7/4/06] Final Compliance - Just keeping this comment alive until these conditions are included in the DA. [5/9/06] Landscaping in the median will not be maintained by the city nor will any damage to the road caused by the irrigation system. All landscaping/road damage must be maintained by the development and the future HOA and language as such will be included in the Development Agreement. Landscape medians must include drainage facilities to handle sprinkler runoff and nuisance flows. Refer to Appendix C for all other requirements. Page 4 Topic: Overall Utility Plan Number: 264 Created: 10/ 17/2007 [10/ 17/07] Darwin Williams of the East Larimer County Water District indicated that remarks were made on red -lined utility plans that have been returned to the developer's design engineer. Topic: Site Plan Number: 252 Created: 10/ 15/2007 [10/ 15/07] The building footprint for the neighborhood/recreation center on Sheet 3 of 17 of the Site Plan appears to correspond to the previously submitted Building Elevations, not the current elevations. Number: 253 Created: 10/ 15/2007 [10/ 15/07] Many of the lines (8) under the SITE PLAN LEGENDS appear to be the same weight. In some cases the plans appear to be the same. It would be helpful to have distinguishing line weights for different elements of the plans. There appears to be inconsistencies between some of the sheets. Number: 261 Created: 10/ 17/2007 [10/ 17/07] Please coordinate the Phasing information on the Site Plan with that on the Landscape Plan. Department: Current Planning Issue Contact: Dana Leavitt Topic: Utility Plans Number: 159 Created: 6/ 12/2007 [10/8/07] Still missing. For the next submittal, submit only the following drawings from the utilities drawing set: Demolition Plan, Horizontal Control Plan, Erosion Control Plan, Overall Grading and Drainage Plan, Grading Plan and Overall Utility Plan. [6/ 12/07] Add Limits of Development (LOD) to all plan drawings in the utility set of plans. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 25 Created: 5 / 8 / 2006 [10/ 16/07] See new comment #254. [5/8/06] Is this project being phased? If so, each phase will need to meet emergency access requirements. Each phase must be stand alone and do not leave necessary improvements to future phases. Number: 42 Created: 5/ 9 / 2006 [10/ 16/07] Only a driveway is shown on the plan sets, please show all proposed landscaping. We'll need to talk about the maintenance of this area. It seems as if there might be a wish to vacate this? [6/8/07] The row for the existing street stub needs to be landscaped and maintained by this development (unless you wish to pursue the vacation Page 3 • Number: 265 Created: 10/ 17/2007 [10/ 17/07] The following comments from various City departments were made at Staff Review on October 10, 2007: Stormwater/Basil Hamdan: a. Please finalize negotiations with the Water Supply & Storage Company. b., Grading on Lots 299 - 305 is somewhat problematic. c. The subdivision plat needs the "new" language about easements. d. Utility plans - some of the proposed storm sewer sewers are on private lots (near Gangway Drive). They need to be in tracts. Light & Power/Alan Rutz: a. They need the load requirements for the oils wells within the development area. Natural Resources/Dana Leavitt: a. Need to show the Limits of Development on the utility plans. b. He does not need the whole big set of plans with the re -submittal. Please see the Revision Routing Sheet. Engineering/Susan Joy: a. Please show the Limits of Development. There needs to be work off -site. b. There are a couple of cover over storm sewer issues. c. The plans are missing information for the east side of Turnberry road. There need to be easements over there. d. The Plan & Profile sheets need work. Topic: Landscape Plans Number: 260 Created: 10/ 16/2007 [ 10/ 16/07] There is some missing information, primarily relating to the Phase areas, on Sheet 7 of 17, Overall Landscape Plan. Please see the red - lined plan. Page 2 M E STAFF PROJECT REVIEW Vignette Studios Date: 10/ 18/2007 144 North Mason Street, Suite #2 Fort Collins, CO 80524 Staff has reviewed your submittal for WATERS EDGE AT RICHARD'S LAKE - FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Building Elevations Number: 258 Created: 10/ 16/2007 [10/ 16/07] On the Rec. Center Elevations, it is difficult to determine, in some cases, where the stucco siding and the synthetic stone siding start 86 stop. Please see the red -lined plans. Number: 259 Created: 10/ 16/2007 [10/ 16/07] Please show additional building heights (per red -lined plans). Topic: Ditch Company Signatures Number: 263 Created: 10/ 17/2007 [10/ 17/07] A copy of the letter received from Dennis Harmon, general manager of the Water Supply & Storage Company, is attached to this comment letter. Topic: General Number: 262 Created: 10/ 17/2007 [10/ 17/07] Technical Services has offered the following comments: a. The outside boundary and legal description do close. b. Please remove the reference to "County Road #11". c. Please see the red -lined plans. Technical Services has many concerns. d. Lots - must show as whole on at least one sheet. e. There are "line over" text issues. f. Please show on the subdivision plat how Turnberry Road was dedicated. Page 1