HomeMy WebLinkAboutTREEHOUSE MONTESSORI SCHOOL EXPANSION - MJA/FDP - 10-10/A - REPORTS - CORRESPONDENCE-HEARING (5)0
Tree House Montessori School PDP— #17-07
July 19, 2007 P & Z Meeting
Page 8
separation from any existing child care facility. A modification to this
separation standard has been requested with this Project Development Plan.
B. The request for modification to Division 4.4(B)(3)(c)(1) — Child Care Centers,
is:
1) Not detrimental to the public good; and
2) The proposed plan is equal to a compliant plan with at least 1,500 feet
separating from an existing child care center because the center will
serve the Lexington Green Neighborhood without the need to cross an
arterial street and parking impacts will be reduced through a shared
parking agreement.
C. The PDP complies with all applicable standards located in Division 4.4 — Low
Density Residential District (RL) of the Land Use Code.
D. The PDP Complies with all applicable General Development Standards
located in Division 3 of the Land Use Code.
5. Staff Recommendation:
Staff recommends approval of the request modification to Division 4.4(B)(3)(c)(1) — Child
Care Centers.
Staff recommends approval of Tree House Montessori School PDP, #17-07.
Attachments:
Vicinity Map
Site and Landscape Plan
Site Photos
Statement of Planning Objectives
Request for Modification
Parking Agreement
Neighborhood Meeting Summary
Traffic Impact Study
0
Tree House Montessori School PDP— #17-07
July 19, 2007 P & Z Meeting
Page 7
character as a child care facility, with minor alterations to the building
exterior and only daytime hours of operation.
2) Character and Image [Section 3.5.3(D)]: The building will retain a
residential facade. A small sign may be placed on the property, according
to sign code regulations and subject to a sign permit. The handicap
accessible ramp will be placed on the side of the building, and the
handicap parking space will be signed, but not striped in order for the
property to maintain a residential character.
C. Supplementary Regulations [Division 3.8]
1) Child Care Center Regulations [Section 3.8.4(A)]: This PDP proposal is
for 15 children with potential to expand to approximately 20 children in
the future. As required per this section, a 5,362 square foot outdoor play
area is provided, well above the minimum 2,500 square foot outdoor play
area required for 15 children. The outdoor play area will be screened by
a six foot solid wood fence.
This section also limits the capacity of child care centers based upon
indoor floor space reserved for school purposes with a minimum of 40
square feet per child. The total indoor floor space in the first floor of the
building is approximately 1,200 square feet, which is sufficient for the
number of children proposed.
Per this section,. preschool nurseries along local streets are not required
to provide an off-street vehicular bay or driveway for loading and
unloading purposes. Valley Forge Avenue is classified by the Master
Street Plan as a Local Street, and is not required to provide such loading
area. However, the applicant proposes to use the existing two -car
driveway as an off-street pick-up/drop-off area for children.
If this PDP is approved, and active and continuous operations are not
carried on for a period of twelve consecutive months, the child care
center use shall be deemed to have been abandoned.
4. Findings Of Fact / Conclusion:
After reviewing the Tree House Montessori School PDP, Staff makes the following findings
of fact and conclusions:
A. The proposed land use, child care facility, is a permitted land use in the RL —
Low Density Residential Zone District provided that there is a 1,500 foot
Tree House Montessori School PDP— #17-07
July 19, 2007 P & Z Meeting
Page 6
8) Walkways [Section 3.2.2(C)(5)]: This PDP features walkways connecting
the street sidewalk and pick-up/drop=off area to the building entry.
9) Transportation Impact Study [Section 3.2.2(C)(8)]: A Transportation
Impact Study Memorandum was submitted for this PDP and is attached.
The memorandum concluded that the while the proposed child care center
will generate more traffic than a single-family house, the type of traffic and
vehicles will be similar to that of a house, and that the traffic operations
at/near the property will be acceptable.
10) Parking Lot Layout [Section 3.2.2(E)]: The parking lot provides well-
defined circulation routes for pedestrians, bicycles and vehicles.
Employee parking is provided in the existing two -car garage and an
additional handicap accessible will be provided on a concrete slab
constructed on the east side of the existing driveway. The existing two -car
driveway will be utilized as a child pick-up/drop-off area with no long term
parking allowed.
11) Shared Parking [Section 3.2.2(G)]: The applicant has entered a shared
parking agreement with the Fort Collins Bible Church, located directly
south of the subject property. A letter of understanding is attached. The
church parking lot will be available to Tree House Montessori School to
use for additional staff and/or overflow parking as needed. A gate in the
south fence will allow access between the church parking lot and the Tree
House Montessori back yard play area.
12) Residential Parking Requirements [Section 3.2.2(K)(1)]: This PDP
provides parking spaces as required per this section. A total of two
standard parking spaces are provided for employees in the existing
garage, and additional overflow parking is available at the adjacent
church.
13) Handicap Parking [Section 3.2.2(K)]: This PDP proposes one van
accessible handicap parking space located on a slab on the east side of
the existing driveway.
14) Parking Stall Dimensions [Section 3.2.2(L)]: All parking spaces meet the
minimum parking stall dimensions.
B. Building Standards [Section 3.5]
1) Building and Project Compatibility [Section 3.5.1 ]: This project is
compatible with the existing single-family properties in the neighborhood
as it is currently a single-family house and will retain that single-family
Tree House Montessori School PDP— #17-07
July 19, 2007 P & Z Meeting
Page 5
3. Compliance with General Development Standards
The proposed project complies with the applicable general development standards
contained in Division 3 of the Land Use Code as follows:
A. Site Planning and Design Standards [Division 3.2]
1) Landscaping and Tree Protection [Section 3.2.1 ]—The PDP provides full
tree stocking on the street frontages and landscaping throughout the
project. The existing silver maple tree in the front yard will remain, as will
the majority. of the existing trees in the back yard/play area. Additional
landscaping will -include child -friendly ground cover, an organic garden
and landscaping along.the parking area perimeter.
2) Buffering between Incompatible Uses and Activities [Section 3.2.1 (E)(1)]:
The PDP provides for the preservation of an existing six foot high privacy
fence at the property line between this site and the residential properties
on the west and east, and the church property to the south. A gate will be
provided along the southern edge of the fence foraccess to the church
parking lot.
3) Landscape Area Treatment [Section 3.2.1(E)(2)]: All non -paved areas on
the site are designed with appropriate landscape areas as described in
this section, including a flower garden, turf, organic garden and ground
cover areas.
4) Parking Lot Landscaping [Sections 3.2.1(E)(4)&(5)]: The project satisfies
the parking lot perimeter standards set forth in this section.
5) Tree Protection [Section 3.2.1(F)&(G)]: All existing significant trees will be
preserved per the specifications set forth in this section.
6) Access,. Circulation and Parking [Section 3.2.2]: This PDP safely and
conveniently accommodates the movement of vehicles, bicycles,
pedestrians and transit. Parking for employees will be provided in the
existing two -car garage and the existing driveway will be used for child
pick-up and drop-off.
7) Curbcuts and Ramps [Section 3.2.2(C)2]: The property currently features
a rollover curb to the existing driveway. A handicap accessible ramp will
be provided near the handicap parking area to a building entrance located
on the east side.
9 0
Tree House Montessori School PDP— #17-07
July 19, 2007 P & Z Meeting
Page 4
Staff has determined that this request for modification is equal to a compliant
plan (one that is located 1,500 feet from the existing Children's World
building). As the applicant stated, Children's World is an approved child care
facility that has been abandoned for approximately 18 months. This building
may continue operations as a child care center in the future, or be converted
to another use that is permitted in the NC — Neighborhood Commercial Zone
District through a major or minor amendment to its approved development
plan.
Regardless of whether the existing child care facility will ever resume
operations, the proposal for the Tree House Montessori School is equal to a
compliant plan located at least 1,500 feet from the existing facility, because it
will continue to serve the Lexington Green Neighborhood, as would a
proposal 1,500 feet away from the existing facility. The preschool currently
operates at the Foothills Unitarian Church, located several blocks away on
Yorktown Drive. The Tree House Montessori School is looking for a more
permanent facility in this neighborhood, and the property at 2013 Valley
Forge satisfies the program's specifications. While the 2013 Valley Forge
property is not separated from the, existing facility by 1,500 feet, it is
separated from the existing facility by a major arterial street. Moreover, this
proposal is for a specific Montessori -based preschool, and another
Montessori preschool is not likely to be located in this neighborhood due to
its specialized curriculum. While this type of preschool facility is classified as
a child care facility, it will operate much like a school with a specific
curriculum and trained staff. It should be noted that public and private
schools are also permitted uses in the RL — Low Density Residential District,
but are not subject to minimum separation requirements as set forth for child
care centers.
Finally, the property backs to the Fort Collins Bible Church, which has
entered into a shared parking agreement with the Tree House Montessori
School, which will allow the school to utilize the church parking lot when
necessary. This agreement creates a situation is equal to, or perhaps even
better than, a compliant plan because it ensures parking alternatives to
prevent spillover parking on the neighborhood streets, whereas many
houses located 1,500 feet away from the existing facility are not located in
areas where shared parking agreements would be feasible to pursue.
C. Land Use Standards: This proposal complies with all density and
dimensional requirements set forth in this section.
0
Tree House Montessori School PDP— #17-07
July 19, 2007 P & Z Meeting
Page 3
Dear Planning and Zoning Board,
This is a request for modification of standard 4.4(B)(3)(c)(1).
Our proposed plan is to open a Montessori preschool at 2013 Valley Forge Avenue, Lot
77, Lexington Green 3`d, Fort Collins, Colorado. The current zoning allows for a child
care facility, but not within 1,500 feet of an existing facility. There is currently an
abandoned Children's World facility located at 2140 Valley Forge Ave.,which is 317
feet from our proposed location.
The Children's World facility has been closed and has sat empty for over 18 months.
The Montessori preschool would not hinder any childcare business opening in this
facility because Montessori would serve an entirely different population than a childcare
center. Montessori caters only to 3 to 6 year old (preschool) children, our curriculum is
Montessori specific, requiring Montessori certified directors and experienced teachers,
in addition to our small classroom size of 15 children. Finally, Montessori is an
educational facility, not a childcare facility. The childcare center, or empty Children's
World facility, targets a different population of infants, toddlers, preschoolers, and the
before and after school children and teenagers from neighborhood schools.
Furthermore, the facility is separated from the proposed Montessori school by a major
crossroad (Taft Hill) thus targeting children in -a separate neighborhood.
An additional point, TreeHouse Montessori is an asset to the community, it aims to
revitalize the house and its landscaping, but more importantly, experience shows that
many Montessori students have grown to become leaders in our community. TreeHouse
Montessori certainly will not be detrimental to,the community. As we have been
currently operating in this neighborhood for the past 5 years, there will be very little
impact on traffic flow. In our experience, drop-off and pick-up occurs at various times
and we haven't experienced any rushes exceeding 2-4 families at one time. Operating
times occur only during daytime hours, closing on weekends and holidays that follow
the CSU and Poudre School schedules.
Our research shows a relative paucity of preschools on the west side of Fort Collins and
we feel that our program will be an asset to the community by providing a specialized
educational program for preschoolers in this area of need. In addition, this property is
our preferred location because it is in a neighborhood that currently benefits from the
Montessori preschool, the house is a one -level home with a layout easily compliant with
state regulations for a preschool with a large back yard for play space and gardening,
adequate storage in the basement, appropriate employee garage parking, and overflow or
off-street parking available through the church parking lot in the back. Further, this
house has minimal neighbors to disturb, both east and west side neighbors work during
the day, but are supportive of this school, and there are no individual neighbors at the
back — the bible church operates mainly on Wednesday evenings and on Sundays.
TreeHouse believes that because of these factors, in addition to neighborhood support, it
is equal to or better than a compliant house.
• 0
Tree House Montessori School PDP— #17-07
July 19, 2007 P & Z Meeting
Page 2
COMMENTS
1. Background
The surrounding zoning and land uses are as follows:
N: RL: Existing single-family residential uses
E: RL: Existing single-family residential uses
S: RL: Existing Fort Collins Bible Church and parking area
W: RL, NC: Existing single-family residential uses, Drake Crossing Shopping
Center
This property was originally platted as Lot 77 of the Lexington Green Third Filing of 1969.
2. Compliance with Zoning District Standards
The proposed PDP complies with the applicable standards in Division 4.4 — Low Density
Residential District (RL) standards as follows:
A. Purpose: The purpose of the RL — Low Density Residential District is
intended for:
"...predominantly single-family residential areas located throughout
the city which were existing at the time of adoption of this Land Use
Code."
This PDP complies with the purpose of the RL — Low Density Residential
District in that while child care facilities are classified as a commercial use,
this proposal complements the adjacent residential uses by serving the
surrounding neighborhood and by maintaining a single-family residential
appearance.
B. Permitted Uses: Child care centers are permitted in the RL — Low Density
Residential District, subject to Planning and Zoning Board approval. In this
district, no child care center shall be permitted to be located within one
thousand five hundred (1,500) feet of any existing child care center within the
city. The applicant has submitted a request for modification to this standard,
per the process and criteria outlined in Division 2.8 of the Land Use Code.
The applicant's request for modification is as follows:
0
PROJECT: Tree House Montessori School PDP Type II- #17-07
APPLICANT: Tree House Montessori School
c/o Loanne Johnson and Shawn Leland
2009 Valley Forge Ave.
Fort Collins, CO 80526
OWNER: Elizabeth Stamp
16651 E. Prentice Circle
Centennial, CO 80015
PROJECT DESCRIPTION:
This is a request to convert the existing single-family residential house located at 2013
Valley Forge Avenue to a childcare facility, called the Tree House Montessori School. The
development proposal includes adding one parking space, utilizing the existing driveway.
as a child drop-off area, updating the building interior and "exterior, `enhancing the existing
landscaping, and converting the back yard to a large, fenced play area. The property is
located on the south side of Valley Forge Avenue, three properties east of South_ Taft Hill
Road, in the RL — Low Density Residential Zone District.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
This Project Development Plan proposal complies with the applicable requirements of the
Land Use Code (LUC), more specifically:
A. The Common Development Review Procedures for Project Development Plans
located in Division 2.2;
B. The proposed land use, child care facility, is a permitted land use in the RL — Low
Density Residential Zone District as long as there is a 1,500 foot separation from
any existing child care facility. A modification to this separation standard is
requested with this Project Development Plan;
C. The Project Development Plamcomplies with the applicable standards of Division
4.4 — Low Density Residential (RL) Zone District,
D. The Project Development Plan complies with the applicable standards of the
General Development Standards of Article 3;
A neighborhood information meeting was held on June 26, 2007 and a meeting summary
is attached.