Loading...
HomeMy WebLinkAboutTREEHOUSE MONTESSORI SCHOOL EXPANSION - MJA/FDP - 10-10/A - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION (3)Treehouse Montessori School - Major Amendment November 9, 2009 - Conceptual Review Vicinity Map Zoning Map p Manchester Or P y N — N O � O m E c = 19.042 s hP O o, m N� / - Ayrshire Or g org e Ave lapel RL' 32 ILI=orE � L 6 NC �` • Ave _ a W.Drake Rd Y it 4 LMN MM*,i --LMN" POL 1 inchhh�= 600 fee ��wx'..M au w.n..�nW re a...iep.JM�MMtlra IMCaY.brwriw p.wr.onN..^R+.. ^a ErlarEr Y�nblr.yrrl r. OlRr—n .<-�. cn �....,e ,. ..v.m �nm owre�r.r—.amRe..re......a�. o.�,r.w�.wain.N.4wM wrnrae�un. cuwh ewm.... a. we•^•n w Doan d.rv.+c.ww. M.n. M Clry OiIWTfAIIN AWFO NO wN11N11Y0 YQIOIRNIIiIIy d1 M411MRTv I011 v'ry E33 Oi YS(IOI! VM'ICY W NRVGSE E%IRW EO OR MIJfO. W1M IQMCTTIMY WI VR WYCT! M MYMCGIYNO MTA M.Y Wna4W i— .ee.c.sou. a� ar. avpa..- U i!. wM.4L IAVLTl. ReEErMrl R1../Yar�YaY—NRY. N46.s.wR1 d yM rlrYYr Cti1Mr .�• b w.•. n w.+n. a...> rurr .+.w n.. w r.> R...nw.r r.wrrar M Rwly n.s. wwRr..rw. rw+.Rwn.r aarr .we mRq.�.uw.aYo..ru.wa.rrlryaalR.C4a..rr.rar RaMrYlW4rp raadn4.rr.. req rrlr ara m..�. W�„�..awe+.�.rn.l....,'.r.,,.+an. m.....vw++rw. r. o..n.r wr+•..�rr. Aerial Site Map 1 inch = 100 feetIF N Fort Collins W _ E GIS s Pnnted. July 29. 2009 11/04/2009 14:55 970266& ARP/WDP • PAGE 02/02 Description of Proposal for Expansion of Treehouse Montessori at 2013 Valley Forge • We are currently capped at having 15 children between the ages of 3 and 6. To make the business financially sustainable we have to expand to at least 20 kids and no more than 25, thus we are interested in initiating the process of expansion. our current Directress and Administrator are fulfilling the requirements of the State so we they can become "large center" qualified (any child care above 15 students). Below is a list of items we would like to explore for the expansion: I ) F,stablishing a relationship with the Church to our South (right behind the backyard fence) to see if they would allow parents and teachers to park on their property and/or drop off kids on their property and have children access the school through the back yard. 2) We would like to explore the possibility of turning the garage into another classroom by cutting an entry in one of the walls of the house (I can show this on a map of the house during the meeting). 3) We want to expand the current bathroom to accommodate another sink and toilet (I can show this on a map of the house during the meeting). 4) We want to expand the current napping room by moving the office down stairs (I can show this on a map or the house during the meeting). 5) We want to explore the possibility of making the basement legal to use for the school. • 0 11/04/2009 14:55 9702666# F6it Collins Current Planning ARP/WDP • PAGE 01/02 Conceptual Review Application General information All proposed development projects begin with Conceptual Review, Anyone with a development idea can schedule a Conceptual Review meeting to get feedback on prospective development Ideas. At this stage, the development idea does not need to be finalized or professionally presented. However, a sketch plan and this application must be submitted to City staff prior to the Conceptual Review meeting. The more information you are able to provide, the better feedback you are likely to get from the meeting. Please be aware that any Information submitted may be considered a public record, available for review by anyone who requests it, Including the media, Conceptual Reviews are scheduled on three Mondays par month. One hafF-hour meeting is allotted per applicant. Please call Planning and Zoning at 221-8750 to schedule a Conceptual Review meeting, Conceptual Review is a free service. Applications and sketch plans must be submitted to City staff no later than 5prr1 on IMP prior to the Monday Conceptual Review meeting. Application materials can be dropped off in person to 281 N. College Ave., emailed to EMcardleQfcaov.com or faxed (970) 224-6134. At Conceptual Review, you will meet with staff from a number of City departments, such as Current Planning, Light and Power, Stormwater, WaterNVastewater, Zoning, Transportation, Engineering, and Poudre Fire Authority. Comments are offered by staff to assist you in preparing the detailed components of the project application. There is no approval or denial of development proposals associated with Conceptual Review. •After the meeting, a City planner will follow-up with the applicant in writing, summarizing staffs comments. Contact Name(s) and Role(s) _ < Ze rieG Business Name (if applicable): 1 rA5 AT Phone Number: 2 S Fax Number. Mailing Address: Email Address: C-0 r'K Site Address or Location Description: Description of Proposal (attach additional sheets if necessary) Suaoested Items for the sketch plan: Property location and boundaries • Surrounding land uses • Proposed use(s) • Existing and proposed improvements (buildings, landscaping, parking/drive areas) • • Existing natural features (water bodies, wetlands, large trees, wildlife) • Utility line locations (if known) Photographs (helpful but not required) "The more information provided on your sketch plan will result in more specific and detailed comments about your proposal.