HomeMy WebLinkAboutRIGDEN FARM FILING SEVENTEEN - PDP - PDP130015 - CORRESPONDENCE -streets including intersections with Ziegler Rd. •
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 05/15/2013
05/15/2013: Landscape Note #23 needs editing. Please review and revise.
Comment Number: 3 Comment Originated: 05/15/2013
05/15/2013: Please include in the Landscape General Notes the following statement:
Landscape plantings installed within the public street right-of-way need to conform to the current
Sight Distance and intersection Sight Triangle standards in Chapters 7 through 9 of the Larimer
County Urban Area Street Standards. Tree canopies should not obstruct visibility of traffic
related Regulatory signage.
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 05/15/2013
05/15/2013: This development proposal needs to submit a Traffic Impact Study. Any previous
studies of this site are older than 3 years and per LCUASS 4.2.4 the project will need to submit
a current traffic study.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221-6854, rbuffington(Mcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated:
05/16/2013
05/16/2013: Add stationing for all sewer services.
Comment Number: 2 Comment Originated:
05/16/2013
05/16/2013: How will the water service locations be staked?
Comment Number: 3 Comment Originated:
05/16/2013
05/16/2013: Place utility plans on separate sheets from the grading plans.
Comment Number: 4 Comment Originated:
05/16/2013
05/16/2013: Schedule meeting with Engineering Development Review and Utilities
Development Review to define how the record drawings will be formatted and presented.
Comment Number: 5 Comment Originated:
05/16/2013
05/16/2013: Show curb stop and meter pit locations on the utility plans.
Comment Number: 6 Comment Originated:
05/16/2013
05/16/2013: Add meter pit standard detail.
Comment Number: 7 Comment Originated:
05/16/2013
05/16/2013: Schedule meeting to review the basis for the water service locations. It appears
that some services may end up under driveways.
Page 1 of 8
sufficient to locate easements must be shown. •
Comment Number: 23 Comment Originated: 05/15/2013
05/15/2013: Please provide a detail for the northwest corner of Block 3.
Comment Number: 24 Comment Originated: 05/15/2013
05/15/2013: Please add distances to the south line of Block 1. See redlines.
Comment Number: 25 Comment Originated: 05/15/2013
05/15/2013: Please provide current acceptable monument records for the public land corners
shown for control.
Comment Number: 26 Comment Originated: 05/15/2013
05/15/2013: Please provide descriptions for the public land corners shown for control, per
Board Rule 6.8.2.
Comment Number: 27 Comment Originated: 05/15/2013
05/15/2013: Please show all right of way dedication information per Development Review
Submittal Requirement 3 (q).
Comment Number: 28 Comment Originated: 05/15/2013
05115/2013: Please check the distance along the south line of Block 3. The Lot distances add
up to 695.36', and you have 695.41' listed.
Comment Number: 29 Comment Originated: 05/15/2013
05/15/2013: Please remove the "B" from Rigden Farm Filing Six south of Block 3. See
redlines.
Comment Number: 30 Comment Originated: 05/15/2013
05/15/2013: Please correct the date shown on sheet 2. See redlines.
Topic: Site Plan
Comment Number: 31 Comment Originated: 05/15/2013
05/15/2013: Please change the legal description on sheet SP1 to match the Subdivision Plat.
Comment Number: 32 Comment Originated: 05/15/2013
05/15/2013: Please rotate all circled street names 180 degrees on sheets SP2 & SP3, so that
they are plan readable. See redlines.
Comment Number: 33 Comment Originated: 05/15/2013
05/15/2013: Please rotate "Tract C" on sheet SP3 180 degrees, so that it is plan readable. See
redlines.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanfordc@fcgov.com
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 05/15/2013
05/15/2013: Please revise the Signing and Pavement Marking Construction Notes to state the
Local Entity Traffic Engineer at all instances that the NOTES currently state the Local Entity
Engineer. This is a permanent revision for Fort Collins Signing and Marking Notes. Please
revise your files to reflect the revision.
Comment Number: 5 Comment Originated: 05/15/2013
05/15/2013: Please provide a Signing and Striping Plan, with dimensioning, for the project
Page 1 of 8
they are plan reale. See redlines. •
Comment Number: 9 Comment Originated: 05/15/2013
05/15/2013: Please rotate "Tract C" on sheet LP3, so that it is plan readable. See redlines.
Topic: Plat
Comment Number: 10 Comment Originated: 05/15/2013
05/15/2013: Please change "men" to "persons" in the Statement Of Ownership And
Subdivision. Is the Plat language the most current?
Comment Number: 11
Comment Originated: 05/15/2013
05/15/2013: Please show the relationship of the signees between Sierra Resources
Corporation, Wolverine Management Group Inc, RFMF LLC and Rigden Farm LLC. See
redlines.
,Comment Number: 12 Comment Originated: 05/15/2013
05/15/2013: Please add ", monumented as shown and described hereon." to the Basis Of
Bearings statement on sheet 1.
Comment Number: 13
Comment Originated: 05/15/2013
05/15/2013: Please move the signature line for the Surveyor up above the name and LS
number. See redlines.
Comment Number: 14 Comment Originated: 05/15/2013
05/15/2013: Please remove the crossed out portion of the Title Commitment Note on sheet 1.
See redlines.
Comment Number: 15 Comment Originated: 05/15/2013
05/15/2013: Please show all distances to the hundredth of a foot.
Comment Number: 16 Comment Originated: 05/15/2013
05/15/2013: What is the 1.8' at the northwest corner of Block 2 for? See redlines.
Comment Number: 17 Comment Originated: 05/15/2013
05/15/2013: Please add bearings & distances for the 20' Access Easement running through
Tracts B, C & D. If all these Tracts are access easements, you might remove this easement.
See redlines.
Comment Number: 18 Comment Originated: 05/15/2013
05/15/2013: Please add arrows to define the distances along Tract C. See redlines.
Comment Number: 19 Comment Originated: 05/15/2013
05/15/2013: All curves require chord bearings and distances. '
Comment Number: 20 Comment Originated: 05/15/2013
05/15/2013: Please rotate "Anika Drive" & right of way information text 180 degrees so that it is
plan readable. See redlines.
Comment Number: 21 Comment Originated: 05/15/2013
05/15/2013: Please tie Blocks 2 & 3 to the Basis Of Bearings. See redlines.
Comment Number: 22
Comment Originated: 05/15/2013
05/15/2013: Will the Floodplain Easement at Reception No. 2000008442 be vacated prior to the
recording of this Plat? If yes, the recording information must be shown. If not, realize that no
building permits will be able to be issued on the affected lots; and bearings & distances
Page 1 of 8
Department: Stormwater Aineering •
Contact: Jesse Schlam, 970-218.2932, ischlam(cilfcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 05/15/2013
05/15/2013: Erosion Control Material for this site is based off the old standards, therefore
Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter
7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements.
Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning this section, or if there are any questions
please contact Jesse Schlam-970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 05/16/2013
05/16/2013: Please add detailed grading to block 2. This should include typical single family
lot grading and spot elevations for the swale behind the homes.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty(a)fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 05/15/2013
05/15/2013: Please change the sheet numbering, so that each sheet is not the same. See
redlines.
Comment Number: 2 Comment Originated: 05/15/2013
05/15/2013: There are line over text issues. See redlines.
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 05/15/2013
05/15/2013: Please remove the dash from the title on sheet 1. See redlines.
Comment Number: 4 Comment Originated: 05/15/2013
05/15/2013: There are line over text issues on sheet 5. See redlines.
Comment Number: 5 Comment Originated: 05/15/2013
05/1512013: There are text over text issues on sheet 5. See redlines.
Comment Number: 6 Comment Originated: 05/15/2013
05/15/2013: Please change the title on sheet 6, from "Detail Sheet" to "Details" so that it
matches the cover sheet index. See redlines.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 05/15/2013
05/15/2013: Please change the sheet titles so that sheet LP1 and the index on SP1 match.
See redlines.
Comment Number: 8 Comment Originated: 05/15/2013
05/15/2013: Please rotate all circled street names 180 degrees on sheets LP2 & LP3, so that
Page 1 of 8
Use only canopyqkde trees as street trees unless ornament*ees are placed by street
lights. Some ornamental trees are being used as street trees.
Comment Number: 2
05/15/2013:
Street Tree Placement:
Comment Originated: 05/15/2013
Street trees should be spaced 30-40 feet between trees. Many street trees are closer than that
spacing.
(LUC 3.2.1 D 2 a) If two or more consecutive residential lots along a street each measure
between forty and sixty feet in street frontage width, one tree per lot may be substituted for the
thirty to forty foot spacing requirement.
Group species and provide variety for the street tree design as illustrated in the City of Fort
Collins
Streetscape Design Standards
Provide Minimum Species Diversity LUC 3.2.1 D 3
Place street trees from utilities, street lights, signs and corners to comply with 3.2.1 K. Some
trees are placed very close to corners so should be moved away. Also space 8 feet away
from driveways.
Comment Number: 3 Comment Originated: 05/15/2013
05/15/2013:
Add Landscape Notes:
• Street trees shall be planted by the developer using a qualified landscape contractor.
• The developer shall contact the City Forester to inspect all street tree plantings at the
completion of each phase of the development. All trees need to have been installed as shown
on the landscape plan. Approval of street tree planting is required before final approval of
each phase. Failure to obtain approval by the City Forester for street trees in a phase shall
result in a hold on certificate of occupancy for future phases of the development.
• The soil in all landscape areas, including parkways and medians, shall be thoroughly
loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly
incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling,
discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment
per one thousand (1,000) square feet of landscape area.
Comment Number: 4 Comment Originated: 05/15/2013
05/1512013:
Please edit Landscape note 16 to read 6 feet between water and sewer service lines. Also add
a sentence to this note that says Street trees shall be placed at least 8 feet away from the
edges of driveways and allys.
Page 1 of 8
Comment Numb 3 loomment Originated: 05/16/2013
05/16/2013: Plat — A note needs to be added to the Plat indicating that the Development
Agreement in place for Rigden Farm Sixth Filing shall continue to apply to these lots.
Comment Number: 4 Comment Originated: 05/16/2013
05/16/2013: Utility plans — Need to provide station information or distances from property line
for the location of the shared driveways.
Comment Number: 5 Comment Originated: 05/16/2013
05/16/2013: Utility plans — more detail is needed for how the inlet is going to be constructed
just behind the row along the shared driveway. Want to see a slight high point located so that
lower flows are contained and enter the inlet and then how is it to be built.
Comment Number: 6 Comment Originated: 05/16/2013
05/1612013: Utility plans — Block 2 what is the width and material of the path/ trail that runs
across this property? Consistently show the ramps being constructed out to the enhanced
cross walks. Some are shown to be built and others are shadowed out.
Comment Number: 7 Comment Originated: 05/16/2013
05/16/2013: Utility plans — Per a conversation with Roger Buffington and the inspector — we will
want to see stationing on these plans, so that the locations of the services can be determined.
Comment Number: 8
Comment Originated: 05/16/2013
05/16/2013: Record drawings — I think Roger is going to provide some information on what we
are going to want to see as for record drawings and we can discuss this more. But overall we
will want two mylar sheet sets for the record drawings - One set that will be labeled and
included with the 6th Filing plans and one set that will be labeled and included with the 17th
filing plans. That way the information will be there regardless of which plan set you go to look
for it at in the future.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex(a)fcgov.com
Topic: General
Comment Number: 1
05/13/2013: No comments.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(a)fcgov.com
Topic: Landscape Plans
Comment Number: 1
05/15/2013:
Street Tree Selection:
Comment Originated: 05/13/2013
Comment Originated: 05/15/2013
Use species as street trees selected from the City Street Tree List. The following species are
not on that list. Confirm all street tree species are from the City Street Tree List.
Sterling Silver Linden
Cimarron Ash
Page 1 of 8
cityof
Fdrt.
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentreview
May 17, 2013
Michael Brake
2900 S College Ave
Fort Collins, CO 80525
RE: Rigden Farm Filing Seventeen, PDP130015, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or
slorson@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Seth Lorson, 970.224.6189, slorson fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/16/2013
05/16/2013: Please work with staff to schedule an administrative public hearing with a Fort
Collins Hearing Officer.
Comment Number: 2 Comment Originated: 05/16/2013
05/16/2013: The Technical Services and Engineering redlines are ready to be picked up at the
"ice cream window" at 281 N. College.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenbergeraa)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/16/2013
05/16/2013: Plat - The plat language is old. The language needs to be updated to our current
language.
Comment Number: 2 Comment Originated: 05/16/2013
05/16/2013: Plat —Plat notes 2 and 3 should be removed as per the discussion at the staff
meeting.
Page 1 of 8