HomeMy WebLinkAboutPOUDRE FIRE AUTHORITY STATION FOUR - PDP - 33-08 - CORRESPONDENCE - (8)Comments from Current Planning: Be sure to indicate the buffer line on the plat, and include a plat note as to what uses are allowed inside the buffer area. 2. Please add the following note to the plat: "Private Conditions, Covenants, and Restrictions (CC&R's), or any other private restrictive covenant imposed on landowners. within the development, may not be created or enforced -which has the effect of prohibiting or limiting the installation of xeriscape landscaping, solar/photo-voltaic collectors (if mounted flush upon any established roof line), clothes lines (if located in backyards), odor -controlled compost bins, or which has the effect of requiring that a portion of any individual lot be planted in turf grass." 3. The potential location of the Spring Creek Trail connection needs to be coordinated with Craig Foreman of the Parks Planning Department. Comments from Historic Preservation: 1. The existing buildings are not registered as historic on the local, state or federal level. If they are to be demolished, the buildings need to be documented prior to.demolition. For further information, please contact Karen McWilliams, Advance Planning, 221-6376. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: T.� 44 r m 4 Ted Shepard Chief Planner Page 5 Number: 7 Created: 11 /6/2008 [11/6/08] 1 don't see any exterior lighting noted on the building elevations. If there is proposed to be any, please show on elevations and provide a description. Note - lighting needs to be fully shielded and down directional. Number: 8 Created: 11 /6/2008 [11/6/08] The site is in the neighborhood sign district. If any signage is proposed to be on the building, please show signage locations - not actual signage, just the locations. Number: 9 Created: 11 /6/2008 [11/6/08] Please remove word "relocation" from the plans as this is not a relocation of the original building - that building is not moving - this is new development and construction. Number: 10 Created: 11 /6/2008 [11/6/08] Please provide a west elevation of the building. Number: 11 Created: 11 /6/2008 [11/6/08] The handicap parking space needs to be an overall width of 16'. When there is only one HC space, it needs to be Van -accessible which is 16' wide with a sign at the front of the space noting HC and Van Accessible. Number: 12 Created: 11 /6/2008 [11/6/08] Provide and show handicap ramp at handicap parking space. Number: 13 Created: 11 /6/2008 (11/6/08] Will there be a connection to the Spring Creek bike path? Number: 14 ' Created: 11 /6/2008 [11/6/08] Please remove landscaping from the site plan and just show on the landscape plan. Number: 15 Created: 11 /6/2008 [11/6/08] Please note building dimensions, footprint and distance•to property lines on the site plan. Number: 16 Created: 11 /6/2008 [11/6/08] Please call out typical parking stall dimensions on the site plan Number: 17 Created: 11 /6/2008 [11/6/08] Landscape plan - please add standard note to plan regarding installation of landscaping prior to issuance of CO. Number: 18 Created: 11 /6/2008 [11/6/08] Please add counts per item to the plan - not just in the key. I would also recommend re -considering and reviewing the two,tree, shrub.planting areas. Seems to be over done and in a couple of years will just look overgrown and maintenance will be an issue. Page 4 Number: 28 Created: 11 /12/2008 [11/12/08] Connection to Spring Creek trail, please provide more information on strategy to connect. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Floodplain Number: 36 Created: 11 /14/2008 [11/14/08] Please add additional notes per redlined plans. Number: 37 Created: 11 /14/2008 [11/14/08] A floodplain use permit is required for the construction activities within the floodplain. A no -rise certification is required after construction and before the CO for the building is released. The Floodplain Use Permit and No -Rise Certification form are included with the redlines. Number: 38 Created: 11 /14/2008 [11/14/08] Please make changes to the text of the drainage report per redlines. Number: 39 Created: 11 /14/2008 [11/14/08] Please address comments on the Floodplain 50% Checklist which is include with the redlines. Topic: Stormwater Number: 34 Created: 11 /14/2008 [11/14/08] The flows near the east property boundary need to be contained on -site and directed to the detention pond. Please provide a swale or other conveyance element near the property boundary to keep all of these flows from entering the property to the east.. Number: 35 Created: 11 /14/2008 [11/14/08] The outfall for the detention pond needs to be coordinated between all parties involved to make sure the effects on Spring Creek are mitigated. This can be done at final compliance. Number: 40 Created: 11 /14/2008 [11/14/08] At final compliance, documentation is needed to make sure flows that travel east on the south side of Drake Road do not turn into the site at the driveway for the 100-year storm. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 5 Created: 11 /5/2008 [11/5/08] At final compliance, label all fittings, valves, etc. as noted on the redlined plans. Department: Zoning Topic: ZONING Number: 6 [11/6/08] Please remove topo lines from site plan. Issue Contact: Jenny Nuckols Created: 11 /6/2008 Page 3 Department: Light & Power Issue Contact: Doug Martine Topic: Electric Number: 1 Created: 10/28/2008 [10/28/08] The developer will need to provide Light & Power Engineering with a completed Commercial Service Information (C-1) form. Normal electric development charges will apply. Number: 2 Created: 10/28/2008 [10/28/08] The developer will need to coordinate space, clearance, and fencing requirements for the electric transformer area with Light & Power Engineering. The detail shown on the utility plan doesn't make it clear if this space is adequate or not. Number: 3 Created: 10/28/2008 [10/28/08] Platte River Power Authority (PRPA) has a 115,000 volt overhead transmission line along the north side of Drake. If a fire traffic signal is planned, it is suggested that the developer coordinate clearance requirements with Tom McCormick at PRPA (226-4000). Topic: Landscape Number: 4 Created: 10/28/2008 [10/28/08] New trees must be a minimum of 40 feet from streetlights (15 ft. if the tree is an ornamental type). It appears that the existing landscape plan does not meet this requirement. Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 41 Created: 11 /14/2008 [11/14/08] Poudre Fire Authority Technical Services has no additional comments at this time. Department: Traffic Operations Issue Contact: Joe Olson Topic: General Number: 30 Created: 11 /12/2008 There is an existing curb cut on Drake about 185' west of the proposed curb cut. The existing curb cut should be removed. Number: 31 Created: 11/12/2008 How will the public access the community room? Standards would require construction of a left turn lane on Drake for an access point open to the public. Even without public access a left turn lane would be desirable for safety during left turn ingress by emergency vehicles. Number: 32 Created: 11 /12/2008 If a left turn lane is not constructed the width of the median cut should be checked. It may not be wide enough to accommodate a left turning fire truck. . Department: Transportation Planning Issue Contact: Jennifer Petrik Topic: General Number: 27 Created: 11 /12/2008 [11/12/08] Please show proposed sidewalk connection to visitor's entrance. Page 2 STAFF PROJECT REVIEW City of Fort Collins RON KECHTER Date: 11/24/2008 CITY OF FORT COLLINS 117 N MASON FORT COLLINS, CO 80524 Staff has reviewed your submittal for PFA Station #4, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Andrew Carney Topic: General Number: 19 Created: 11/12/2008 [11/12/08] Please identify the new drive cut curb radii and provide spot elevations. I would like to see a more detailed plan on how this area will work and how the elevations will change. Please show exactly what is proposed in this area more clearly and in more detail. Number: 20 Created: 11/12/2008 [11/12/08] TDR fees are still owed. Please contact either myself or Sheri. Number: 21 Created: 11/12/2008 [11/12/08] Take a look at the turning template for the proposed median cut width. It is a very tight fit especially for the movement from westbound drake into the site. Is this movement proposed? Number: 22 Created: 11/12/2008 [11/12/08] Please take a look at the scanning criteria in regards to the landscape plan. Number: 23 . Created: 11/12/2008 [11/12/08] You will need to provide a sheet in the utility plans that contain the general construction notes as well as a sheet that contains standard drawings pertaining to the project. Number: 24 Created: 11/12/2008 [11/12/08] You will need to provide the city's signature block on all sheets in the utility plans. Number: 25 Created: 11/12/2008 [11/12/08] Please correct the mislabels on the site plan (see redlines) Number: 26 Created: 11/12/2008 [11/12/08] What exactly will be happening with the existing house on lot 1? If the house is to be removed we will need to remove the drive onto Taft Hill as well. Also, will the existing drive to Drake only be removed up the lot line or will it be removed back to the house? Number: 33 Created: 11 /13/2008 [11/13/08] Technical Services has no comments. Page I