Comment Number: 5 Comment Originated: 06/04/2013
07/12/2013: Repeat Comment: None of these issues have been corrected.
06/04/2013: There are line over text issues on sheets 3, 4 & 5. See redlines.
Comment Number: 6
Comment Originated: 06/04/2013
07/12/2013: Repeat Comment: This has not been corrected.
06/04/2013: Please change the 12' utility easement on sheet 4, to include "non -vehicular access".
See redlines.
Comment Number: 7
Comment Originated: 06/04/2013
07/12/2013: Repeat Comment: This has not been corrected.
06/04/2013: Please change the subdivision name shown on sheet 4, to Lemay LTD First Subdivision.
See redlines.
Topic: Site Plan
Comment Number: 16 Comment Originated: 06/05/2013
07/12/2013: There are still a few line over text issues. See redlines.
06/05/2013: There are many line over text issues. See redlines.
Department: Traffic Operation
Contact: Ward Stanford, 970.221.6820, wstanford()fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 06/03/2013
07/15/2013: Traffic Signing and Pavement Marking Notes not revised as requested. Please revise to
state "local entity Traffic Engineer" instead of "local entity engineer".
06/03/2013: Please revise the Signing and Marking Construction Notes to state the Local Entity Traffic
Engineer at all instances which currently state the Local entity Engineer. This is a permanent revision to
the Fort Collins S&M notes. Please revise your NOTES file to reflect the revision.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221.6854, rbuffington(a.fcgov.com
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 07/16/2013
07/16/2013: Show sewer service on the landscape plan and adjust trees accordingly,
if ev 0,- IVIct Av.>T or►e ScVV"CC o
Department: Zoning
Contact: Peter Barnes, 970.416.2355, pbarnesna.fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 07/05/2013
07/05/2013: All issues resolved, assuming the modification request that has been submitted is
approved. No additional comments .
r
C6Vn(tVn 1 C),5 not o r dt -2 k k�
Page 5 of 5
at VA4 • t(
Comment Number: 01
Comment Originated: 06/04/2013
06/04/2013: FIRE CONTAINMENT
The building exceeds 5000 square feet and shall be sprinklered or fire contained. If containment is
used, the containment construction shall be reviewed and approved by the Poudre Fire Authority prior
to installation.
Comment Number: 02
Comment Originated: 07/11/2013
07/11/2013: The comment pertaining to FIRE CONTAIMENT (No. 1 above) was originated on 12/14/12
and to date, this concern has not been addressed by the applicant. If fire separation is being
proposed in lieu of sprinklering the building, fire containment needs to be detailed on the plans. Until
then, this comment shall remain active. Otherwise, the building WILL require an automatic sprinkler
system. You may contact me with questions.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970.218.2932, jschlam&fcctov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 05/29/2013
05/29/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current
Erosion Control Materials Submitted does not meet requirements. Please submit; Erosion Control
Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning
this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
Contact: Wes Lamarque, 970.416.2418, wlamargue(a)fcgov.com S
Topic: General we,s I�as ciLCSMcO -
�Or.0, Comment Number: 2 Comment Originated: 06/07/2013
`` _ 06107/2013: The site is required to meet the City's LID requirements. This would include 50% of the
�" land area draining through an infiltration device and 25% of private parking and drive aisles to be
orous. Please contact the City to arrange a meeting to discuss options.
l�ras5lat�d stti7a-le,.
Department: Technical Services
Contact: Jeff County, 970.221.6588, icountv(a)fcuov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 06/04/2013
07/12/2013: The index on sheet 1 does not match the title on sheet 5. See redlines.
06/04/2013: The index on sheet 1 does not match the title on sheets 4 & 5. See redlines.
Comment Number: 3
Comment Originated: 06/04/2013
07/12/2013: Repeat Comment: This has not been corrected. The GIS website has incorrect elevations.
Please contact Technical Services for correct benchmark information.
06/04/2013: Please correct the elevation for benchmark F-136. See redlines.
Comment Number: 4
Comment Originated: 06/04/2013
07/12/2013: This has been addressed on sheet 1, but suggest also adding it to sheet 2.
06/04/2013: Please add a second benchmark to sheets 1 & 2. Utility Plan Submittal Requirement L(G)
states "benchmarks".
Page 4 of 5
1.
Comment Number: 2
Comment Originated: 06/11/2013
06/11/2013: Tree Mitigation:
Two upsized mitigation trees would be required for the 11 inch diameter hawthorn tree to be removed.
This tree is listed as a Tatarian Maple in the Existing tree list on sheet L2. Please correct the species
on sheet LS an list 2 mitigation trees. Mitigation trees need to be 3 inch caliper shade trees or 2.5
inch ornamental trees or 8 foot conifer trees.
Two of the Skyline Honeylocust to be planted as street trees can be upsized to 3.0 inch caliper to
account for the mitigation.
Comment Number: 3
Comment Originated: 06/11/2013
06/11/2013: Add the tree protection specifications to the landscape plan found in LUC 3.2.1 G
Comment Number: 4 Comment Originated: 06/11/2013
06/11/2013: New sidewalk along South Lemay needs to be adjusted to be 5 feet away from the outer
bark of the existing Austrian Pine as it passes by this tree. Show accurate location of the Austrian Pine
on the Utility/Engineering Plans.
Department: Light And Power
Contact: Rob Irish, 970.224-6167, rirish(a.fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 06/03/2013
06/03/2013: Existing building @ 816 is fed by a 25KVA 120/240v service at the NE corner of the
building. The primary for this transformer runs along the North side of the building from Lemay Ave.
kV This primary will be in direct conflict with the building expansion. Contact Light & Power Engineering
t�11 @ 970-221-6700 early in the process to discuss options. Any relocation or modification to the existing
v , electric facilities will be at the owners expense.
Comment Number: 4
Comment Originated: 06/0312013
06/03/2013: Field locate all existing electric facilities and show on the site plan. This will help with any
conflicts there may be.
Comment Number: 6
Comment Originated: 07/10/2013
07/10/2013: The existing electric primary to the single-phase 25kva transformer maybe in direct
conflict of the building expansion. This transformer is on a radial feed with no backup. This could be
problematic in keeping the building in power while building the addition. Contact Light & Power
Engineering to discuss options. 970-222-6700.
Department: Park Planning
Contact: Craig Foreman, 970.221.6618, cforemantafcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/17/2013
05/1712013: No comments
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwilercDpoudre-fire.org
Topic: General
Page 3 of 5
Comment Number: 9 Comment Originated: 06/05/2013
07/17/2013: Repeat Comment. 06/05/2013: Sheet 4 - There is greater than 750 square feet draining
from the site across the Southern Driveway Access. This runoff will need to discharge from the site in
a location other than the driveway. Consider modifying grades and providing a Sidewalk chase on
one side of the Type I Driveway.
Comment Number: 10 Comment Originated: 07/17/2013
07/17/2013: Revise multiple line over text conflicts.
Comment Number: 11 Comment Originated: 07/17/2013
07/17/2013: The site plan indicates that the existing monument signs are being moved. Please revise
the civil sheets to appropriately resemble this as well.
Topic: Site Plan
Comment Number: 2 Comment Originated: 06/05/2013
06/05/2013: The additional T of Right of Way will need to be dedicated by separate document which
will be $250 to submit. Please submit the legal and exhibit for review.
Comment Number: 5 Comment Originated: 06/05/2013
06/05/2013: Is an emergency access easement required for the PFA access? If so, it will need to be
dedicated by separate document.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex(ofcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/30/2013
05/30/2013: No comments. -
Department: Forestry
Contact: Tim Buchanan, 970-221.6361, tbuchanan(a)fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 06/11/2013
06/11/2013: Street Tree placement and Selection:
Please change the three street trees along South Lemay to Skyline Honeylocust to provide continuity
with some other trees to the north and south along Lemay.
Please place street trees generally in these locations. Not planting right in front of the Austrian Pine
allows for future growth and maturity of the pine and for the new street trees. Trees need to be at least
6 feet from the water or sewer service lines and 8 feet from a driveway or curb cut.
North street tree around 6-10 feet north of the north water line
Middle street tree 6 feet to the south of the south water line
South street tree around 8-10 feet from the curb cut
Page 2 of 5
City Of
Fort Collins
July 17, 2013
Alan Hauser
Hauser Architechts, PC
3780 E. 15th St. Ste. 201
Loveland, CO 80538
RE: Fort Collins Veterinary Emergency & Rehabilitation Hospital,.PDP130018, Round Number 2
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/deve/0pmentrevlew
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Courtney Levingston, at 970416-2283 or
clevingston@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970.416.2283, clevingston(afcgov.com
Topic: General
Comment Number: 3
Comment Originated: 07/01/2013
07/11/2013: There is a 14 day appeal period after the hearing. You may submit for Final Plan review
prior to the appeal period expiration (at your own risk).
07/01/2013: Final Plan submittals are accepted by appointment with the front desk on Wednesdays.
Please call 970-224-6134 to schedule your appointment.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970.221.6603, agingerichOfcgov.com
Topic: Construction Drawings
Comment Number: 6
Comment Originated: 06/05/2013
07/17/2013: Repeat Comment. 06/05/2013: Sheet 3 & 4 - The southern driveway will need to be
constructed to City Standard Type I driveway and have concrete to back of Right of Way. Please
provide the Driveway detail in the details.
Comment Number: 7
Comment Originated: 06/05/2013
07/17/2013: Repeat Comment. 06/05/2013: Sheet 4 - The sidewalk will need to be moved to the east
so that the back of the sidewalk is on the Right of Way line.
Comment Number: 8
Comment Originated: 06/05/2013
07/17/2013: Repeat Comment. 06/05/2013: Sheet 4 - Label the HC Ramp and Domes on this sheet on
the south side of the Southern Driveway access.