Loading...
HomeMy WebLinkAboutFORT COLLINS VETERINARY EMERGENCY & REHABILITATION HOSPITAL - PDP - PDP130018 - CORRESPONDENCE -01 Comment Number: 5 Comment Originated: 06/04/2013 07/12/2013: Repeat Comment: None of these issues have been corrected. 06/04/2013: There are line over text issues on sheets 3, 4 & 5. See redlines. Comment Number: 6 Comment Originated: 06/04/2013 07/12/2013: Repeat Comment: This has not been corrected. 06/04/2013: Please change the 12' utility easement on sheet 4, to include "non -vehicular access". See redlines. Comment Number: 7 Comment Originated: 06/04/2013 07/12/2013: Repeat Comment: This has not been corrected. 06/04/2013: Please change the subdivision name shown on sheet 4, to Lemay LTD First Subdivision. See redlines. Topic: Site Plan Comment Number: 16 Comment Originated: 06/05/2013 07/12/2013: There are still a few line over text issues. See redlines. 06/05/2013: There are many line over text issues. See redlines. Department: Traffic Operation Contact: Ward Stanford, 970.221.6820, wstanford()fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 06/03/2013 07/15/2013: Traffic Signing and Pavement Marking Notes not revised as requested. Please revise to state "local entity Traffic Engineer" instead of "local entity engineer". 06/03/2013: Please revise the Signing and Marking Construction Notes to state the Local Entity Traffic Engineer at all instances which currently state the Local entity Engineer. This is a permanent revision to the Fort Collins S&M notes. Please revise your NOTES file to reflect the revision. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221.6854, rbuffington(a.fcgov.com Topic: Landscape Plans Comment Number: 2 Comment Originated: 07/16/2013 07/16/2013: Show sewer service on the landscape plan and adjust trees accordingly, if ev 0,- IVIct Av.>T or►e ScVV"CC o Department: Zoning Contact: Peter Barnes, 970.416.2355, pbarnesna.fcgov.com Topic: General Comment Number: 6 Comment Originated: 07/05/2013 07/05/2013: All issues resolved, assuming the modification request that has been submitted is approved. No additional comments . r C6Vn(tVn 1 C),5 not o r dt -2 k k� Page 5 of 5 at VA4 • t( Comment Number: 01 Comment Originated: 06/04/2013 06/04/2013: FIRE CONTAINMENT The building exceeds 5000 square feet and shall be sprinklered or fire contained. If containment is used, the containment construction shall be reviewed and approved by the Poudre Fire Authority prior to installation. Comment Number: 02 Comment Originated: 07/11/2013 07/11/2013: The comment pertaining to FIRE CONTAIMENT (No. 1 above) was originated on 12/14/12 and to date, this concern has not been addressed by the applicant. If fire separation is being proposed in lieu of sprinklering the building, fire containment needs to be detailed on the plans. Until then, this comment shall remain active. Otherwise, the building WILL require an automatic sprinkler system. You may contact me with questions. Department: Stormwater Engineering Contact: Jesse Schlam, 970.218.2932, jschlam&fcctov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 05/29/2013 05/29/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Contact: Wes Lamarque, 970.416.2418, wlamargue(a)fcgov.com S Topic: General we,s I�as ciLCSMcO - �Or.0, Comment Number: 2 Comment Originated: 06/07/2013 `` _ 06107/2013: The site is required to meet the City's LID requirements. This would include 50% of the �" land area draining through an infiltration device and 25% of private parking and drive aisles to be orous. Please contact the City to arrange a meeting to discuss options. l�ras5lat�d stti7a-le,. Department: Technical Services Contact: Jeff County, 970.221.6588, icountv(a)fcuov.com Topic: Construction Drawings Comment Number: 2 Comment Originated: 06/04/2013 07/12/2013: The index on sheet 1 does not match the title on sheet 5. See redlines. 06/04/2013: The index on sheet 1 does not match the title on sheets 4 & 5. See redlines. Comment Number: 3 Comment Originated: 06/04/2013 07/12/2013: Repeat Comment: This has not been corrected. The GIS website has incorrect elevations. Please contact Technical Services for correct benchmark information. 06/04/2013: Please correct the elevation for benchmark F-136. See redlines. Comment Number: 4 Comment Originated: 06/04/2013 07/12/2013: This has been addressed on sheet 1, but suggest also adding it to sheet 2. 06/04/2013: Please add a second benchmark to sheets 1 & 2. Utility Plan Submittal Requirement L(G) states "benchmarks". Page 4 of 5 1. Comment Number: 2 Comment Originated: 06/11/2013 06/11/2013: Tree Mitigation: Two upsized mitigation trees would be required for the 11 inch diameter hawthorn tree to be removed. This tree is listed as a Tatarian Maple in the Existing tree list on sheet L2. Please correct the species on sheet LS an list 2 mitigation trees. Mitigation trees need to be 3 inch caliper shade trees or 2.5 inch ornamental trees or 8 foot conifer trees. Two of the Skyline Honeylocust to be planted as street trees can be upsized to 3.0 inch caliper to account for the mitigation. Comment Number: 3 Comment Originated: 06/11/2013 06/11/2013: Add the tree protection specifications to the landscape plan found in LUC 3.2.1 G Comment Number: 4 Comment Originated: 06/11/2013 06/11/2013: New sidewalk along South Lemay needs to be adjusted to be 5 feet away from the outer bark of the existing Austrian Pine as it passes by this tree. Show accurate location of the Austrian Pine on the Utility/Engineering Plans. Department: Light And Power Contact: Rob Irish, 970.224-6167, rirish(a.fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/03/2013 06/03/2013: Existing building @ 816 is fed by a 25KVA 120/240v service at the NE corner of the building. The primary for this transformer runs along the North side of the building from Lemay Ave. kV This primary will be in direct conflict with the building expansion. Contact Light & Power Engineering t�11 @ 970-221-6700 early in the process to discuss options. Any relocation or modification to the existing v , electric facilities will be at the owners expense. Comment Number: 4 Comment Originated: 06/0312013 06/03/2013: Field locate all existing electric facilities and show on the site plan. This will help with any conflicts there may be. Comment Number: 6 Comment Originated: 07/10/2013 07/10/2013: The existing electric primary to the single-phase 25kva transformer maybe in direct conflict of the building expansion. This transformer is on a radial feed with no backup. This could be problematic in keeping the building in power while building the addition. Contact Light & Power Engineering to discuss options. 970-222-6700. Department: Park Planning Contact: Craig Foreman, 970.221.6618, cforemantafcgov.com Topic: General Comment Number: 1 Comment Originated: 05/17/2013 05/1712013: No comments Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwilercDpoudre-fire.org Topic: General Page 3 of 5 Comment Number: 9 Comment Originated: 06/05/2013 07/17/2013: Repeat Comment. 06/05/2013: Sheet 4 - There is greater than 750 square feet draining from the site across the Southern Driveway Access. This runoff will need to discharge from the site in a location other than the driveway. Consider modifying grades and providing a Sidewalk chase on one side of the Type I Driveway. Comment Number: 10 Comment Originated: 07/17/2013 07/17/2013: Revise multiple line over text conflicts. Comment Number: 11 Comment Originated: 07/17/2013 07/17/2013: The site plan indicates that the existing monument signs are being moved. Please revise the civil sheets to appropriately resemble this as well. Topic: Site Plan Comment Number: 2 Comment Originated: 06/05/2013 06/05/2013: The additional T of Right of Way will need to be dedicated by separate document which will be $250 to submit. Please submit the legal and exhibit for review. Comment Number: 5 Comment Originated: 06/05/2013 06/05/2013: Is an emergency access easement required for the PFA access? If so, it will need to be dedicated by separate document. Department: Environmental Planning Contact: Lindsay Ex, 970.224.6143, lex(ofcgov.com Topic: General Comment Number: 1 Comment Originated: 05/30/2013 05/30/2013: No comments. - Department: Forestry Contact: Tim Buchanan, 970-221.6361, tbuchanan(a)fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 06/11/2013 06/11/2013: Street Tree placement and Selection: Please change the three street trees along South Lemay to Skyline Honeylocust to provide continuity with some other trees to the north and south along Lemay. Please place street trees generally in these locations. Not planting right in front of the Austrian Pine allows for future growth and maturity of the pine and for the new street trees. Trees need to be at least 6 feet from the water or sewer service lines and 8 feet from a driveway or curb cut. North street tree around 6-10 feet north of the north water line Middle street tree 6 feet to the south of the south water line South street tree around 8-10 feet from the curb cut Page 2 of 5 City Of Fort Collins July 17, 2013 Alan Hauser Hauser Architechts, PC 3780 E. 15th St. Ste. 201 Loveland, CO 80538 RE: Fort Collins Veterinary Emergency & Rehabilitation Hospital,.PDP130018, Round Number 2 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/deve/0pmentrevlew Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Courtney Levingston, at 970416-2283 or clevingston@fcgov.com. Comment Summary: Department: Current Planning Contact: Courtney Levingston, 970.416.2283, clevingston(afcgov.com Topic: General Comment Number: 3 Comment Originated: 07/01/2013 07/11/2013: There is a 14 day appeal period after the hearing. You may submit for Final Plan review prior to the appeal period expiration (at your own risk). 07/01/2013: Final Plan submittals are accepted by appointment with the front desk on Wednesdays. Please call 970-224-6134 to schedule your appointment. Department: Engineering Development Review Contact: Andrew Gingerich, 970.221.6603, agingerichOfcgov.com Topic: Construction Drawings Comment Number: 6 Comment Originated: 06/05/2013 07/17/2013: Repeat Comment. 06/05/2013: Sheet 3 & 4 - The southern driveway will need to be constructed to City Standard Type I driveway and have concrete to back of Right of Way. Please provide the Driveway detail in the details. Comment Number: 7 Comment Originated: 06/05/2013 07/17/2013: Repeat Comment. 06/05/2013: Sheet 4 - The sidewalk will need to be moved to the east so that the back of the sidewalk is on the Right of Way line. Comment Number: 8 Comment Originated: 06/05/2013 07/17/2013: Repeat Comment. 06/05/2013: Sheet 4 - Label the HC Ramp and Domes on this sheet on the south side of the Southern Driveway access. Page 1 of 5