the existing ground elevation around the new structure. The proposal adds less than 1000 sq. ft. of
impervious area.
2. The design of this site must conform to the drainage basin design of the Spring Creek Drainage Master
Drainage Plan as well the City's Design Criteria and Construction standards. The minimal grading
and impervious surface addition to the existing site will conform to the Spring Creek Drainage
Master Plan. This will be shown on the construction documents.
3. The city wide development fee is $4,420/acre ($0.1015/sq.ft.) for new impervious area over 350 sq.ft.
No fee is charged for existing impervious area. This fee is to be paid at the time the building permit is
issued. This fee shall be paid when BP is issued.
Water Wastewater
Contact Info: Roger Buffington, 221-6854, rbuffington@fcgov.com
1. Existing mains: 8-inch water main in Raintree, 8-inch sanitary sewer in an easement extending from
west with a manhole on the west side of the building.
2. A 6-inch fire line and a 2-inch domestic service extend north from Raintree to the area west of the
building.
3. It appears that the proposed generator may be in conflict with the existing sanitary sewer. This portion
of the project has been removed.
4. Have all underground utilities field located and shown accurately on the site plan. Keep all structures a
minimum of 10 feet from the water and sewer lines. VZW shall comply with this requirement.
Light and Power
Contact Info: Rob Irish, 224-6167, rirish@fcgov.com
1. Existing service is 3-phase. There is an oval vault on Raintree. A new transformer will need to be set
for this project within 10 feet of a driveable surface and within an existing or new utility easement. The
new transformer will be set adjacent to the existing transformer in the easement shown on the
site plan.
2. You will need to complete a C-1 form and a one -line diagram. This will be shown on the
construction documents.
3. Any system modifications will be the applicant's responsibility. VZW shall assume responsibility for
any system modifications.
Environmental Planning
Contact Info: Dana Leavitt, 224-6143, dleavitt@fcgov.com
1. All existing trees on site must be protected during construction according to Section 3.2.1 of the Land
Use Code. VZW shall comply with this requirement.
2. Show existing landscaping accurately including size and location. The existing and the proposed
Landscape Plan is included on the Plan Sets.
3. The shelter addition will be visible from Rolland Moore park. A tree or two will be required to mitigate
the view along the Senior Center's north boundary near the ditch. Please show the adjacent Rolland
Moore parking lot and ditch in your site plan. Per the new Landscape Plan, trees have been added
between the Park and the Shelter Addition. The adjacent parking lot and ditch has been added
to the site plan.
3
0 a
o Cover sheet: correct the vicinity map, use standard Fort Collins language on the signature block,
add notary signature and stamp space and add a signature and date line for Director of
Development Review Center and space for City stamp. Change the name of the project to
"Verizon Wireless Telecommunication Facility at the Fort Collins Senior Center" here and on
each page.
o Page ZI: Clarify drawings with shading for flat roof sections as well as pitched. Show driveways
and parking lot, show existing landscaping to scale. Clearly show what elements of the existing
landscaping are proposed to be removed and which are proposed to be planted with the project.
Mitigation will be required for any removal of significant landscaping.
The requested revisions have been made to the drawings Z1 and Z2.
o Page Z2: The proposed expansion of the trash enclosure does not look like it will work —there is
not enough room remaining between it and the sidewalk for required landscape screening. Show
existing trees to scale. This portion of the project has been removed.
9. Provide photo simulations of all three installations from significant viewpoints. . Submitted with
initial package.
10. I will have more detailed comments once I have more detailed plans to review.
11. An exhaustive list of submittal requirements for this type of project is available at
http://fcgov.com/currentplanning/pdf/project-dev-plan.pdf There is a submittal checklist at
http://fcgov.com/currentplanrdng/pdf/pdp.pdf Not all requirements will apply to this project. Please
let me know if you have any questions about the requirements for your submittal.
12. You will need to set up an appointment to submit your application with the Development Review
Center front counter at 221-6750. Incomplete submittals will not be accepted.
13. Since this proposal is a Type II (P&Z) use, a neighborhood meeting will be required. Please contact me
to arrange this meeting, which can happen anytime from now, with 2 weeks plus one day minimum
needed for scheduling and sending out notification.
14. Please note that postage rates have been raised as of January 2006. The fee for the APO labels will now
be $.75 per label.
Engineering
Randy Maizland, 416-2292, rmaizland@fcgov.com,
Andrew Carney, 221-7128, acamey@fcgov.com
1. I'll add this in on Monday since you all left early Friday! Do we have additional comments here?
Poudre Fire Authority
Contact Info: Contact Info: Carie Dann, 416-2869, cdann@poudre-fire.org
1. If the shelter has any type of batteries in it, you will be required to have an automatic fire sprinkler
head(s) in there, since the building has sprinklers. The construction documents will have the
extension of the existing building sprinkler system into the addition shown on the drawings.
2. If the generator is located in the trash enclosure, there would be an increased risk of fire. Consider
locating the generator elsewhere or designing the space to minimize the risk of fire. This portion of the
project has been removed.
Stormwater
Contact Info: Glen Schlueter, 221-6065, gschlueter@fcgov.com
1. As presented, this project should add less than 1000 square feet of new impervious area. However, if
there is an increase in imperviousness greater than 1000 square feet, a drainage and erosion control
report and construction plans are required and must be prepared by a Professional Engineer registered
in Colorado. A grading plan is required when there is between 1000 and 350 square feet of new
imperviousness, but no drainage study is required. In this case, a drainage letter or a statement in the
planning objectives documenting the total increase in impervious area is all that is needed instead of the
normal drainage report. A grading plan isn't really needed either as long as there won't be a change in
the drainage patterns. The planning objectives should also include a statement of the intent to match
PAP
ITEM: Verizon Wireless Telecommunication Facility
MEETING DATE: June 2, 2008
APPLICANT: Kelly Harrison
1918 Lowell Blvd.
Denver, CO 80204
LAND USE DATA: Request to construct a wireless telecommunication facility at the existing Senior Center
site including7the expansion of an elevator tower with small, wall -mounted antennas to the west of the main
entry; an equipment enclosure addition to the north side of the existing building; and an expansion of the
existing trash enclosure for a new generator. The property is within the City of Fort Collins and is zoned
MMN—Medium-density Mixed -use Neighborhood District. The following departmental agencies have offered
comments for this proposal:
COMMENTS:
Zoning
Contact Info: Peter Barnes, 416-2355, pbames@fcgov.com
1. Wireless facilities are permitted as accessory uses in the MMN—Medium Density l\/iixed-Use
Neighborhood district, subject to a Type II (Planning and Zoning Board) Review.
2. Foundation plantings will be required at the shelter and trash enclosure installations to soften the walls.
Please see landscape plan.
Current Planning
Contact Info: Anne Aspen 221-6206, aaspen@fcgov.com
1. The entire Fort Collins Land Use Code (LUC) is available for your review on the web at
hup://www.colocode.com/ftcoUins/landuse/`begin.htm
2. We have just launched our new online Development Review Guide at www.fcgov.com/drg. This easy
to use, color -coded guide will step you through everything you need to know about the development
review process.
3. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code
(LUC), including Article 3 General Development Standards, and Division 4.6 Medium Density Mixed -
Use Neighborhood District.
4. When developing your plans for submittal, pay particular attention to the following sections of the
Code:
• 3.2.1. Landscaping and Tree Protection
• 3.2.4 Site Lighting (if applicable)
• 3.8.13 Supplemental Standards — Wireless Telecommunication
• 4.6 MMN2 Zone District
5. You are required to produce documentation of your attempts to co -locate on an existing wireless facility.
You may submit this documentation as a part of your planning objectives. Submitted with initial
package.
6. A neighborhood meeting is required for all Type II projects. Call me to coordinate a date for this
meeting. It must occur prior to formal submittal of your planset. We will need a minimum of 2 weeks
plus one day to schedule and send notification for the meeting. I will call you to schedule the
neighborhood meeting.
7. There appears to be a sewer cleanout in the area proposed for the shelter. Please address any relocation
or accommodation of this feature in your submittal. The sewer clean -out will be relocated.
8. Drawing comments: